What the Noise Circle requires for an air/water heat pump
When installing an outdoor air/water heat pump in Switzerland, the system is subject to the requirements of the Ordinance relating to Protection against Noise (OPB). To compile the building permit application for the municipality or canton, the authority requires an acoustic certificate. The calculation method applied in the field comes from the enforcement aid published by the Noise Circle (Cercle Bruit), the association of cantonal officials for noise abatement.
This method aims to verify that the noise emissions generated by the device do not exceed the emission limit values or the planning values set according to the noise sensitivity degree of the area (often degree II in pure residential zones, or degree III in mixed zones). The evaluation is not random: it takes as a reference the middle of the open window of a noise-sensitive room (bedroom, living room) located in the neighborhood. If it is an unbuilt neighboring plot, the control point is placed on the building limit.
To complete your file, the starting point remains the sound power level of the machine. It is imperative to use the technical data provided on the manufacturer's data sheet or listed in the sound data list of the Swiss Professional Association for Heat Pumps (GSP). Art Construction is independent of the SIA, CRB and Suva. This tool gives you a direct overview of the expected sound level before drawing up the final cantonal form.
Placing the machine and the neighbor's window on the plan
The simulator starts with a frequent initial configuration: an outdoor unit showing a sound power level of 53 dB(A) at night, placed against a facade, and a neighbor's window positioned at 7.5 meters in noise sensitivity degree II. Directly on your screen, you can move the location of the device as well as the neighbor's window to reproduce the actual geometry of your project.
Several reception points can be placed all around the perimeter: the system analyzes each position and automatically selects the most unfavorable point for your calculation. If the neighboring plot is still waiting for its building permit, you position the point on the legal building limit according to the neighborhood plan. To find your way around the plot, you can enter an address: the system then uses the public swisstopo API in read-only mode to load the official Swiss cadastral background.
Results are read via a three-color code and circles drawn on the plan:
- Green: the evaluation level is below the planning value.
- Orange: the margin relative to the planning value is less than 3 dB, drawing attention to the prevention principle of environmental legislation.
- Red: the calculated sound level exceeds the planning value allowed for the selected sensitivity degree.
Reading calculation details: sound power level, directivity, distance
The calculation applies the Noise Circle enforcement aid equation: Lr = Leq + K1 + K2 + K3 + 10·log(t/t0). The simulator breaks down each term transparently for the technician, heating engineer, or planner.
The first term stems from the sound power level emitted by the machine at the source, to which the geometric attenuation constant of -11 dB corresponding to basic hemispheric propagation is applied. Next comes directivity (depending on the immediate environment of the machine, such as a free field, placement against a facade, or a re-entrant corner between two walls). Physical distance provides attenuation related to the gap between the outdoor unit and the reception point.
Next come the corrective terms: the level correction according to the period (day or night), any tonality penalty (K1) when the fan or compressor emits a marked whistling or buzzing sound, the impulsivity correction (K2), and the consideration of effective operating time relative to the reference period (t/t0). The result gives the evaluation level Lr, directly compared against the project's OPB requirements.
Nighttime levels are almost always decisive
On a single-family home or apartment building construction site, acoustic sizing almost systematically runs into the nighttime period. The planning values imposed by the OPB at night are significantly lower than daytime ones. Yet, a heat pump often runs at a sustained speed during the cool hours of the night to cover the building's thermal losses and heat domestic water.
The costly mistake made in the field consists of installing the machine without checking the angle formed by facades and hard fences. Units are often seen placed in a closed angle between the main facade and a garage return, right in front of the neighboring plot's bedrooms. Multiple reflections amplify the sound wave through directivity effects, canceling out the gain of a supposedly silent appliance. The right reflex is to simulate the layout before pouring the concrete base or drilling wall penetrations for refrigerant lines, favoring a clearance without reflective walls facing receivers.
Attention must also be paid to operating modes: many models feature a nighttime reduction or silent mode. This mode lowers the fan rotation speed and compressor frequency, reducing the sound power level emitted during the night shift, at the cost of a slight drop in heating capacity that must be anticipated in the thermal balance.
What to do if the planning value is exceeded
When the sound radar turns red at the most exposed point, several technical adaptations must be studied before submitting the building permit application:
- Move the appliance: modify the location to lengthen the distance to the neighbor's window or break the direct line of sight.
- Avoid corner walls: take the heat pump out of a closed courtyard or a dihedral formed by two masonry walls to decrease directivity.
- Enable nighttime noise reduction: select the manufacturer's night program if the residual power is enough to cover heating needs at design temperatures.
- Interpose a sound barrier: erect a heavy, continuous, and absorbent acoustic wall between the source and the sensitive point, without gaps at the ground level.
- Integrate a soundproofing cover: install an acoustic enclosure adapted to the machine's size, taking care not to restrict the airflows needed for the evaporator.
Note that this calculation follows the Noise Circle method but does not replace the final certificate submitted with the building permit, nor the formal examination conducted by the competent authority. Similarly, the simulator's initial data (equivalent hours, yields, sizes) are order-of-magnitude values that can be modified within the tool according to your construction site's actual specifications.
What the free version does not do
This estimation tool is free, without registration, and without a user account. It runs directly in your web browser: the imported plan, placed positions, dimension entries, and acoustic calculations remain stored locally on your computer. Only exception: if you type a Swiss postal address to load a background map, the request and selected area pass through the public swisstopo API in read-only mode. No information is transmitted or saved at Art Construction.
The simulator keeps no memory: as soon as you close or reload the page, your entries disappear. It is essential to export your results before leaving the browser. Documents generated by the free version (plan image, printed sheet) feature an Art Construction watermark, and the bill of quantities CSV export bears the free version mention. Moreover, no price data from the Swiss ACIP base is integrated: you must enter material or soundproofing costs yourself. Subsidy scales (Pronovo and cantonal aid) constitute indicative starting values to be checked, especially since the aid application must generally be submitted before opening the construction site.
To archive your projects in the cloud, manage variants, and work collaboratively on technical files, discover our enterprise Portal or find complete construction site management in our Pro offer. Quantities and equipment can also be transferred to our tenders software to draw up your quotes using the ACIP price base without a watermark.
Frequently asked questions
Where exactly should the control point be placed at the neighbor's?
According to Noise Circle guidelines for applying the OPB, noise immission is calculated at the geometric center of the open window of the most exposed sensitive room (bedroom, office, or living room). If it is an unbuilt neighboring plot, the check is done at the building limit.
What is the difference between the planning value and the emission limit value?
The planning value is stricter than the emission limit value. For a new installation such as a new heat pump, the authority requires the evaluation level to respect the planning value set for the area's sensitivity degree, day and night.
Where can I find the machine's sound power level?
The sound power level can be found on the manufacturer's official technical data sheet or in the sound data table published by the Swiss Professional Association for Heat Pumps (GSP). Do not confuse it with the sound pressure level, which depends on the measurement distance.
Does this simulator replace the official building permit certificate?
No. The calculator reproduces the Noise Circle evaluation formula to test your layouts, but it replaces neither the signed cantonal acoustic certificate form nor the formal decision rendered by the municipal or cantonal authority when issuing the building permit.
Are my construction site data transmitted or saved?
No. Everything works locally in your browser without opening an account. Only address searches query the public swisstopo API in read-only mode to display the cadastral plan. Nothing is sent to Art Construction, and closing the tab immediately erases all your data.
What to do if the margin relative to the limit is less than 3 dB?
The simulator displays an orange warning status. The legal principle of prevention requires limiting immissions as much as operating conditions and technology allow. The orientation of the unit or attenuation accessories should be studied to secure the file.
What does the paid version bring for installers?
The paid version allows you to save calculations on the Portal or in the ERP, work in team mode, generate technical reports without watermarks featuring your company header, and link figured items to quotes and tenders using the ACIP base.