Why a Tarpaulin Changes Everything for Anchors
Installing a waterproof tarpaulin on a scaffolding radically alters the wind's impact on the structure. On a bare tube structure, wind passes through the mesh without major obstacles. The surface area exposed remains limited to the diameter of the standards, ledgers, and boards. As soon as protection is applied for sandblasting, rendering, or winter containment, the assembly behaves like a closed sail. The horizontal forces transmitted to the moorings increase significantly.
On the construction site, switching from a simple dust net to a waterproof tarpaulin transfers considerable tensile and shear forces to the fixing points. This situation is frequent during thermal renovations where the trade must protect the façade against driving rain and cold. The load is no longer diffused through the decking: it pushes or pulls the entire structure outwards. If the anchoring grid is not adapted to the chosen covering, the plugs risk failing successively under gusts.
The studio opens by default on the view of a façade scaffolding with a waterproof tarpaulin installed in front of perforated brick masonry. You can modify these criteria to compare the effect of a net or switch the substrate to reinforced concrete or solid wood. The software works without registration and without an account directly in the browser. It saves nothing to a remote server: if you close your tab, all your entered data is erased.
Force per Anchor: Coefficients, Wind Pressure, and Grid
Calculating the force exerted on each attachment point applies a direct relationship between several geometric and aerodynamic parameters. The formula used in the studio is as follows:
Force per anchor = 1.5 × façade shelter coefficient × force coefficient × covering solidity rate × dynamic wind pressure × anchoring grid surface area
Each factor reflects a physical component of the structure:
- Coefficient 1.5: fixed amplification value taken into account in the equation.
- Façade shelter coefficient: it takes a lower value for a solid and closed façade than for an open framed façade, where air rushes in more easily.
- Covering solidity rate: it characterizes the permeability of the outer skin. The rate varies depending on whether you leave the tubes bare, install an openwork dust net, or fix a completely waterproof tarpaulin.
- Dynamic wind pressure: the studio offers a starting value for illustrative purposes. It is up to you to replace it with the value corresponding to your installation zone according to standard SIA 261. The tool does not calculate local pressure from an address.
- Anchoring grid surface area: this is the product of the horizontal spacing between two moorings by their vertical spacing. The wider the frame, the larger the tributary surface area transferring its load to a single plug.
The studio compares the obtained force to the substrate capacity without issuing an official regulatory verdict. It simply displays the mention "achieved" or "not achieved" according to your inputs.
Concrete, Perforated Brick, Wood: Substrate Resistance
The nature of the receiving material directly conditions the holding of the mooring. Reinforced concrete generally offers high mechanical resistance, accepting significant tensile loads per expansion anchor or concrete screw. The situation becomes trickier on old or light masonry, particularly perforated brick and honeycombed terracotta blocks. In these hollow walls, the internal walls of the brick can break under stress if the plug is not suitable or if the anchorage depth is insufficient.
The studio integrates an indicative design resistance for each major type of substrate:
- Reinforced concrete: high starting value for mechanical anchor or chemical sealing.
- Perforated brick or hollow masonry: reduced starting value to account for the risk of cell breakage.
- Solid wood: intermediate value linked to the withdrawal resistance of screws in framework or timber frame elements.
All these resistances are modifiable parameters in the interface. The prefilled figures do not constitute contractual values. On a particular structure, the actual characteristics of the substrate depend on its age, the condition of the joint mortar, and the presence of a surface render. The studio data serves as a working basis to guide your layout choices.
Tightened Grid, Doubled Plugs, Pull-out Test
When the calculated force exceeds the resistance of the anchor point, the studio adapts the fixing method in successive steps. It begins by tightening the grid by reducing the distance between two horizontally anchored standards, for example by switching to anchoring on each bay. If the load remains too high, it decreases the vertical spacing to moor the structure at each floor level.
If reducing the grid is not enough to obtain the "achieved" mention, the model doubles the plugs per attachment point using a V-shaped mooring or a split baseplate. This helps divide the force applied on each elementary anchor in the façade.
In the case where the tightest possible grid combined with the doubling of fixations still displays "not achieved", the tool signals the situation with a red message. This alert indicates that standard façade fixations can no longer take up the modeled wind action. It is then advisable to abandon standard plugs to plan for chemical sealing with an injection sleeve adapted to perforated brick, or to perform an on-site pull-out test with an extractometer to determine the actual permissible load of the existing substrate.
Standard Base and Sole Board Under Loads
Wind force does not only exert itself horizontally against the façade. The combined actions of depression, the self-weight of the boards, and tarpaulin tension create significant vertical load transfers on the scaffolding standards. Ground support must take up these forces without differential settlement.
The studio presents a load transfer at the base of a typical standard and calculates the minimum size of the necessary support sole board. The site manager can thus check whether a simple wooden sleeper packing is sufficient or if the pressure transmitted to the ground or paving requires a wider distribution surface. On asphalt pavement or soft ground at the base of the façade, poor load distribution can lead to foot tipping and deform the entire structure.
In parallel, the screen displays a schematic elevation of the structure. Anchor points are dimensioned there with the exact width and height of the selected grid. This diagram provides a clear view of the distribution of moorings along the façades to prepare the intervention of erectors on the construction site.
What the Free Version Does Not Do
The free online studio constitutes a pre-verification tool intended to guide construction site preparation. To maintain simple use in the browser, several technical limits apply:
- No automatic wind calculation: dynamic pressure is not deduced from a postal code. The value must be entered by you according to standard SIA 261 and the scaffolder's calculation note which alone are authoritative.
- Theoretical starting resistances: substrate capacities proposed by default do not replace an on-site pull-out test, the only way to obtain a real measurement on a honeycombed brick or degraded concrete.
- Local pre-verification: the model analyzes the resistance of the anchoring grid and the base sole board. It does not perform the overall scaffolding stability calculation or the detailed out-of-service wind study according to the complete building geometry.
- No contractual verdict: the result is technical decision support. It does not replace the opinion of a civil engineer or a CFST specialist.
- Absence of prices: the free version contains no material rates or installation unit prices. It does not connect to any ACIP database.
All inputs remain confined to your browser's memory. No data is sent to an external server or kept for subsequent reopening.
Switching to Tenders
When the arrangement of anchors and the type of covering are finalized, the next step consists in quantifying supplies and establishing the financial quote for the client. Upgrading to the paid version of this tool is done solely within Art Construction's Tenders software. No other paid program is necessary.
From the studio, the export generates a draft quote without prices containing the bill of quantities of tarpaulins or nets and the count of single or reinforced anchor points. This document imports directly into Tenders to be priced using the ACIP price database or your own item catalog. You can then adjust your margins by CFC, add management surcharges, or draft an addendum if the project switches from a bare façade to a tarpaulined façade during construction.
The full version in Tenders also allows you to save your projects on the cloud with version history tracking, activate Team mode to share folders between site managers, and edit plans and reports without watermarks featuring your company header.
Frequently asked questions
How to obtain wind pressure for my construction site according to standard SIA 261?
The free studio does not determine wind pressure according to the municipality. You must refer to standard SIA 261 to extract the reference dynamic pressure linked to the installation zone and the altitude of the structure. You can then enter this value directly into the studio calculation field.
Why does perforated brick often require tightening the anchoring grid?
Perforated brick has thin terracotta walls. The contact surface with ordinary plugs is low, which limits the permissible pull-out force per point. To take up the force imposed by a wind tarpaulin, the studio reduces the spacing between moorings in order to distribute the total load over more fixations.
When is it mandatory to carry out a pull-out test on the façade?
An on-site pull-out test is essential when the masonry is old, crumbly, or when the studio displays the red message after having tightened the grid to the maximum. Only an extractometer allows verifying the actual resistance of the substrate and validating the use of specific chemical sealings.
Does the studio take dust nets into account?
Yes. You can modify the covering solidity rate in the tool to switch from a waterproof tarpaulin to a dust net. Since the net lets part of the air circulate, the force calculated on each anchor decreases compared to a closed canvas, which often allows spacing out fixations.
Is my scaffolding calculation data kept on your servers?
No. In its free version, the studio runs exclusively in your device's browser. No file, bill of quantities, or numerical value is transferred or saved on our servers. As soon as you leave the page or close your tab, all entered data is deleted.
Does the displayed result constitute an official calculation note for safety?
No. The software provides technical pre-verification to prepare your site installation. It indicates whether a threshold is reached or not reached based on your figures. It does not replace the calculation note signed by the scaffolder or the expertise of a specialized engineering firm.
How to transfer calculated anchors to my company quote?
The studio allows toggling quantities of anchors, tarpaulins, and sole boards to the Tenders software. The transmitted quote arrives in the form of a draft without prices. You then apply your hourly rates and ACIP price bases directly in the Tenders interface.