About this tool
Load Class: What Changes Between Painter, Facade Worker, and Mason
On a construction site, the choice of working structure directly depends on the materials stored on the platforms. A painter's needs do not match the constraints of a structural work or masonry team. The load classes derived from the European facade scaffolding standard define these working thresholds. Class 3 corresponds to painting work, light rendering, and perimeter insulation without heavy storage. Class 4 is intended for standard masonry, structural work, and carpentry, accepting the placement of denser materials. Class 5 concerns heavy masonry with pallet storage on the floors.
In the studio, the payload related to each class can be modified by the user to match the indications of the chosen system manufacturer. The tool directly opens the Facade Scaffolding view with Class 4 preselected. It applies a starting payload value adapted to structural work and provides a wide deck. This distinction between trades avoids underestimating mechanical constraints as early as the tender phase. For each level, the program indicates whether the chosen threshold is reached or not reached, by comparing the entered data to the basic parameters without issuing a regulatory verdict.
Deck Width and Payload
The width of the platform determines the ease of movement for workers and the capacity to store blocks, bricks, or mortar tubs. In Class 4, the starting deck width is larger than in Class 3, in order to clear a continuous free passage along the drop-off areas. This initial width remains modifiable in the studio settings according to the configuration of the equipment available in your fleet or from the rental company.
The studio presents a dimensioned elevation and a complete cross-section. This section shows the layout of the uprights, the useful width of the floor, and the space reserved for interventions. The Class 4 payload applies to the selected work surfaces to estimate the overall stresses on the structure. When trades succeed each other on the building, the transition from masonry work to rendering finishes modifies deck occupancy. The interface makes it possible to adjust these deck dimensions to anticipate the successive phases of the construction site, while keeping a clear reading of the useful dimensions on the cross-section diagram.
Perimeter Insulation: Facade Gap and Interior Brackets
The installation of exterior perimeter insulation requires leaving a sufficient gap between the bare wall surface and the inner edge of the platform to slide in the insulation panels. This interval proves much wider than during a simple paint renovation. When the gap between the platform and the facade exceeds thirty centimeters, the studio automatically adds interior brackets or a complete interior guardrail to each concerned working floor.
The cross-section and dimensioned elevation highlight this free space and the position of the interior brackets. The studio then integrates the total length of these brackets directly into the summary quantity takeoff. This visual detection prevents forgetting essential components during the material preparation of the installation. On the ground, the costly mistake consists of installing scaffolding flush against the structural work without anticipating the final thickness of the insulation panel and its rendering. Facade workers find themselves blocked, which forces the team to dismantle the anchors or rig unstable shimming. The action that prevents this deadlock is adjusting the gap during the initial setup and counting the line of interior brackets in the quantity assessment.
Load Transfer at the Base of an Upright
The transmission of forces to the ground conditions the stability of the entire structure along the facade. The studio calculates the force at the base of an upright by taking into account the theoretical dead weight of the assembly and the live load of the chosen class. From this load transfer, it indicates a minimum distribution sole plate depending on the nature of the ground selected by the user.
Support characteristics vary greatly between a reinforced concrete slab, uncompacted backfilled terrain, or a stabilized roadway. The tool compares the transmitted pressure to modifiable values according to the support and displays the reached or not reached status for the planned sole plate. These data provide a technical order of magnitude to prepare the wooden shimming or distribution plates necessary before the equipment arrives on the construction site. Art Construction reminds that these calculations constitute an aid to practical layout and in no way replace the scaffolder's specific calculation note nor the system manufacturer's directives.
What the Free Version Does Not Do
The free version of this studio runs entirely within your internet browser. It is accessible without registration and without creating an account. Nothing is sent to an external server and nothing is saved. As soon as you close the browser tab, all entered data is erased. This free version contains no unit price and no data from the ACIP database. It displays no official regulatory verdict, limiting itself to indicating whether the modifiable thresholds are reached or not reached.
Furthermore, the studio does not perform the thermal calculation of the insulation itself: to determine the U-value of walls, you should use the Insulation Studio which constitutes a separate page. The module does not size the mechanical resistance of each bracket either: it takes care of signaling their geometric necessity and calculating their length for the takeoff. The integrated loads and classes remain indicative starting values, with the manufacturer's prescriptions and the in-force standard taking precedence for technical execution.
Switching to Tenders
To go further in managing your project, switching to extended features is done in the Tenders software. The free studio transmits the calculated quantities, in particular the scaffolding surfaces and the linear meters of interior brackets, in the form of a draft quote without prices. This raw document is then directly integrated into Tenders to be completed and priced using the ACIP price database.
Using the paid version allows you to save your construction sites on the cloud and keep the history of successive versions as work progresses. It also gives access to Team mode to collaborate between the technical office and construction management. You can export dimensioned plans without watermarks, customized with your company's header and colors, thus facilitating the transmission of instructions to assembly teams or the presentation of files to clients.
Frequently asked questions
How does the studio react when the space with the facade exceeds thirty centimeters?
As soon as the gap between the platform and the raw wall exceeds thirty centimeters, the studio signals the interior void. It automatically adds interior brackets or a complete interior guardrail to the diagram at each floor level. The total length of the required brackets is then integrated into the summary quantity takeoff to quantify the parts to be planned on the construction site.
What difference is there between Class 3 and Class 4 scaffolding?
Class 3 is intended for moderate loads such as painting, light rendering, or insulation without storage on the deck. Class 4 allows a higher payload for masonry, structural work, and carpentry, with a wider starting platform to store construction materials.
Can the default payload defined in the studio be modified?
Yes. The load classes propose usual starting values, but the payload per square meter remains a freely modifiable parameter in the studio options. You can adapt it according to the technical data of your scaffolding manufacturer or according to the project description.
Does the studio calculate the thermal U-value of perimeter insulation?
No, this studio focuses on scaffolding layout, wall gap, load transfer, and bracket requirements. The thermal evaluation of the wall and the calculation of the U-value are carried out on a separate page with the Insulation Studio.
Is my layout data preserved if I close my browser?
No. In the free version, the studio runs locally in your web browser. No file or parameter is sent or stored on a remote server. As soon as the page or tab is closed, all entered data is permanently erased.
Does the tool provide an official calculation note for assembly?
No. The result calculated by the studio offers a preparation and quantity takeoff aid for the site manager. It does not replace the calculation note established by the scaffolder nor the technical homologation sheets provided by the scaffolding system manufacturers.
How to get a complete priced quote with unit prices?
The free studio generates a raw quantity takeoff without prices. To price the work, this draft can be sent to the Tenders software. You apply the ACIP price database or your own company rates to produce a detailed and valued offer.