When a facade scaffolding is required and what the threshold says
On a construction site in Switzerland, fall risk management dictates the choice of collective protections. The construction work ordinance sets a clear benchmark for general contractors, roofers, carpenters, and plumbers. A facade scaffolding must be installed as soon as the fall height exceeds three meters. This threshold serves as a dividing line to know whether a complete facade system is required or if another work organization can suffice.
In the studio, this three-meter value appears as a modifiable parameter displayed in the checklist. When you enter a fall height below this threshold, the studio clearly indicates it on screen. When the height reaches or exceeds three meters, the tool signals the principle obligation and recalls the need for a retaining wall if roof work is scheduled on the structure. The software does not issue any regulatory verdict: it simply compares your dimensions to the entered benchmarks and indicates « reached » or « not reached ».
The costly mistake in the field is measuring the fall height from the interior working floor or an intermediate point instead of taking the actual measurement down to the natural ground or potential impact level at the eaves. To avoid any dispute during site inspection or when establishing the joint measurement, the site manager checks the exact level from the finished ground up to the roof overhang before sizing the uprights.
The roofer retaining wall: height, extension, and takeoff
For plumbing, roofing, or carpentry work, the protection at the edge or eaves is not limited to a standard facade guardrail. The construction work ordinance specifies that the top rail must extend at least eighty centimeters above the edge of the highest area presenting a fall hazard. This roofer retaining wall prevents a worker from slipping on the roof slope.
When you activate the roofer wall option in the studio, the structure's geometry adapts immediately. The scaffolding uprights extend above the eaves to support the nets or retaining elements. The facade takeoff surface calculated by the studio takes this extra height above the gutter line into account. In parallel, the retaining wall itself is accounted for linearly, per meter of scaffolding length.
This distinction in the takeoff avoids billing disputes at the time of invoicing between the general contractor and the surveyor: the scaffolding surface encompasses the complete vertical development of the uprights, while the specific roof protection item follows the effective length of the protected eaves according to the project description.
Guardrail near the edge: the one-meter extension case
The horizontal distance between the scaffolding structure and the edge of the roof modifies the minimum dimensions of the upper guardrail. The construction work ordinance provides a strict rule: the top rail must extend by at least one meter if the guardrail is installed less than sixty centimeters from the edge of the fall zone. If the distance is equal to or greater than sixty centimeters, the minimum extension remains fixed at eighty centimeters.
The studio directly integrates this working situation. A checkbox titled « guardrail less than 60 cm from the edge » is available to you. As soon as this box is checked, the software automatically changes the minimum extension value from eighty centimeters to a full meter. The dimensioned elevation and cross-section update to reflect this raising of the upper uprights.
On renovation sites of houses or buildings with a narrow eaves, this one-meter extension is frequent because the facade brings the scaffolding closer to the fall edge. Failing to anticipate this meter of extension forces the scaffolder to return to the site to install post extensions, which blocks the intervention of waterproofers or plumbers.
Top platform, stairs, and uprights above the eaves
The technical drawing provided by the studio displays a detailed dimensioned elevation as well as a cross-section of the structure. This section highlights the exact dimension of the extension above the roof edge, allowing visualization of the alignment between the extended uprights, the top working floor, and the roof slope. This graphic clarity helps the site manager verify the adaptation of the equipment to the building's constraints prior to assembly.
Another material benchmark concerns access to high workstations. In the studio, an access stair tower is provided as soon as the top platform exceeds a height of five meters. Access via internal ladders integrated into hatches is no longer suitable beyond this elevation for regular flows of workers and materials according to standard construction site safety practices.
The joint representation of the access tower and the extension of the uprights ensures complete preparation of the site installation. You visualize all the retaining elements, the exact altitude of the top working level relative to the gutter, and the vertical circulations essential for structural and finishing work personnel.
What the free version does not do
The free version of the studio runs entirely in your web browser. No account is necessary and no registration is requested. The technical principle is transparent: nothing is sent to an external server and nothing is saved. As soon as you close the browser tab, all data entered for your installation is permanently erased from local memory.
This free version contains no unit price and no data from the ACIP database. It does not integrate online saving functions, does not allow reopening a closed file later, and produces documents with a standard watermark, without personalization with your company logo. Furthermore, it does not handle alternative roof protection measures such as independent plumber bridges or guardrails fixed to flat roof parapets.
Nor does the studio replace the text of the construction work ordinance, the current version of which should be consulted. The results provided constitute an aid to preparation and takeoff, but never replace the site safety and health plan or the decisions of the competent authority in case of complex geometric situations or steep roof pitches.
Switching to Tenders
To transform an installation sketch into a complete commercial proposal, switching to the paid version is done within the Tenders software. No other paid tool intervenes in this workflow. The studio generates a takeoff statement which is transmitted in the form of an unpriced raw bill of quantities, ready to be valued.
In Tenders, you can directly attach your takeoff to the ACIP price base to establish your quote by CFC, save the file on a cloud-hosted construction site, keep successive versions of your variants, and work in team mode on the same projects. Graphic and takeoff exports are then produced without any watermark, using your company's colors and letterhead.
Frequently asked questions
From what height is a facade scaffolding required?
According to the construction work ordinance, a facade scaffolding is required as soon as the fall height exceeds three meters. This threshold is a modifiable benchmark in the studio checklist. Below this value, the tool signals it; above, it recalls the obligation to install peripheral protection for the construction site.
How much must the retaining wall extend beyond the roof edge?
The top rail of the retaining wall for roof work must extend beyond the fall edge by at least eighty centimeters. If the guardrail is placed less than sixty centimeters from the roof edge, this minimum extension increases to one meter. The studio allows selecting this distance to immediately update the takeoff.
How is the roofer retaining wall measured in the studio?
The roofer retaining wall is calculated along two axes. On the one hand, the facade surface takes into account the additional height of the uprights extending beyond the eaves. On the other hand, the supply and installation of the retaining wall are quantified in linear meters along the entire length of the protected facade.
When is it necessary to integrate a stair tower on the scaffolding?
The studio provides an access stair tower as soon as the level of the top platform exceeds five meters in height. This device replaces internal access ladders to secure the ascent and descent of teams on the upper levels of the scaffolding.
Is my entered data kept in the free tool?
No. The free version operates solely within your web browser, without account creation. Nothing is sent to a server and nothing is saved in permanent memory. When you close your browser tab, all entered data and dimensions are erased.
Does the studio validate the legal value of my scaffolding?
No. The software does not issue any regulatory verdict and does not replace the text of the construction work ordinance. It compares entered dimensions to modifiable parameters and displays « reached » or « not reached ». It is up to the company to apply the texts in force.
How to get a costing with unit prices?
The free studio provides no amounts or ACIP prices. To cost the structure, you export the takeoff to the Tenders software. You apply your ACIP price base or your price breakdowns there to generate a quote structured by CFC with your company letterheads.