What a fire service access route checks on a site plan
On a construction site, emergency vehicle access cannot be improvised between deliveries. From the moment you open the studio, you work directly on a representative construction site access case. This template includes a plot of land, a building under construction, a fire route with a change of direction, a parking area for an aerial ladder, a fire hydrant and a sorting skip placed nearby. On this starting example, the passage is deliberately too narrow in its curve: the studio immediately highlights it with a red line.
The organization of heavy traffic prevents blockages during an urgent intervention. You must identify usable routes as soon as the site facilities are installed. The rescue route layout makes it possible to check the space available between material storage areas, site accommodations and work areas of trade contractors. The tool compares the indicated dimensions to editable starting values from the studio booklet. It displays a clear status: "reached" or "not reached". It does not issue any regulatory verdict. You retain control over the parameters to adjust your project according to the project description and requirements transmitted by local intervention services.
This visual check serves as a coordination support between the site manager, the construction supervisor and the safety officer. By visualizing the traffic envelope on your plan, you spot bottlenecks before earthworks begin or protective site fences are installed.
Straight sections: clear width, clear height and slope
For each rectilinear section, you draw the central traffic axis directly on your construction site plan. The studio then invites you to enter the clear width measured between fixed elements of the site. It also takes into account two essential vertical data points that you enter manually: the clear height under high obstacles and the slope of the natural terrain or fitted track.
On site, a passage that seems wide enough on the surface may prove impassable due to a suspended temporary pipe, a site accommodation awning, a crane power supply line or a marked difference in level. These parameters are compared to the starting values recorded in the studio. If the clear width on the straight section is less than the target value, the system indicates that the dimension is not reached and turns the section red.
| Section parameter | Studio input | Tool verification |
|---|---|---|
| Clear width | Axis layout and measurement between obstacles | Comparison with studio booklet value |
| Clear height | Numeric value entered manually | Warning if the vertical template is too low |
| Route slope | Percentage entered manually | Alert if the slope exceeds the limit value |
The check is carried out in real time. This verification helps the quantity surveyor and the construction manager correctly size temporary crushed-stone access tracks or reinforced rolling areas right from the site preparation stage.
Turns: outer radius and required width
Emergency vehicles require a track width significantly larger in curves than on straight lines to compensate for the body sweep. In the studio, each turn is represented as a circular arc tangent to the axis of the straight sections, respecting the scale of your master plan.
For each turn, you enter the outer radius of the curve. The tool's operation relies on two precise geometric steps:
- Below a predefined minimum radius, the turn is rejected by the studio and displayed in red, as the rescue truck cannot negotiate too tight a curve.
- Above this minimum radius, the required clear width decreases as the radius increases, gradually merging with the minimum width of a straight section on very large curves.
The costly mistake on site consists in laying a temporary track with an outer radius deemed sufficient by eye, then blocking traffic with construction site barriers on the inner edge of the turn. In practice, the rear of a heavy vehicle cuts the trajectory inwards while its front sweeps outwards. The action that avoids this mistake consists in drawing tangent arcs in the studio, checking that the widened width remains green along the entire length of the turn, and then transferring this dimension to the ground by materializing the footprint before installing any fence or guardrail.
Obstacles in the envelope: skips, fences and crane bases
Daily management of a construction site puts emergency access to the test. Unforeseen deliveries, moving waste skips and the expansion of storage areas frequently reduce available space. The studio calculates the safety envelope around the route: this clearance strip appears green when the template is completely clear.
As soon as an element installed on the plan encroaches on this envelope, the concerned area turns red. The studio precisely identifies conflicts with:
- Rubbish or sorting skips overflowing onto the route;
- Mobile construction site fences moved to expand a work area;
- Concrete blocks and tower crane bases positioned too close to traffic tracks;
- Site accommodations, temporary electrical cabinets or pallet depots.
The studio provides a clear checklist listing each geometric alert. By clicking on an alert in the list, the view centers directly on the incriminated obstacle. This allows you to correct the location of the equipment before finalizing your site installation plan.
Aerial ladder platform and fire hydrant
Access to the base of facades and water supply constitute two absolute priorities for rescue services. The studio integrates dedicated tools to reserve these strategic spaces without encroaching on current traffic.
The setup area for an aerial ladder is materialized by a modifiable starting rectangle. You can adapt its dimensions according to project data and position it facing building facades requiring rescue or external fire attack. This space must strictly remain free of any storage, shack, scaffolding or parked vehicle. The studio checks that the area is clear and that it communicates with the access route.
Concerning water supply, the tool proposes drawing a circular clear zone around each fire hydrant present on site or in the immediate surroundings of the construction site. This clearance circle allows responders to connect their supply hoses without being hindered by fences, hoardings or earthmoving machinery. Clickable alerts immediately signal if a temporary installation encroaches on this maneuvering perimeter.
What the free version does not do
This online studio is completely free, usable without registration and without account creation. Its operation takes place entirely in your web browser: nothing is sent to a server and nothing is saved. As soon as you close your browser tab, all drawn data is erased. The tool allows you to export an image of your plan in PNG format with a standard watermark.
It is important to keep in mind the technical limitations of the system:
- The tool does not simulate the kinematics or dynamic trajectory of an articulated vehicle: it is a verification of entered geometric values.
- The view remains a two-dimensional top-down representation: the route slope and clear height under obstacles are not calculated automatically but must be entered manually.
- Widths, radii, heights, slopes and area dimensions are starting values from the studio booklet. They are not reviewed against the directives of the association of cantonal fire insurance establishments nor those of the local fire service.
- The obtained result constitutes a simple aid for site preparation. It in no way replaces the official opinion of the fire service nor the final decision of the competent authority regarding fire prevention.
- The free version does not integrate any price or data from the ACIP database.
Switching to Tenders
To go further in managing your construction site, switching to the paid version takes place in our Tenders software. No other paid software is concerned by this gateway. The quote generated by the studio is a quantitative draft without price, directly transferred to your workspace.
In the Tenders software, you will find advanced features to finalize your technical and financial files:
- Save your projects on a cloud space with management of successive versions as work progresses;
- Load a previously saved project at any time to update it during a new earthworks or structural work phase;
- Cost the actual needs of the construction site (temporary signage, rolling plates for soft ground, guiding barriers) thanks to the integrated ACIP price database;
- Work in team mode with your construction supervisors and quantity surveyors on the same site installation;
- Export your access plans in high-definition image format, without watermark, in your company's colors.
Frequently asked questions
Does the studio validate access according to local fire service requirements?
No. The studio only compares entered dimensions with indicative starting values. It displays whether a dimension is reached or not reached. This geometric aid does not replace the review of the local fire service or the authorization of the competent authority.
Are my site layouts saved if I close my browser?
No. In the free version, the calculation is carried out entirely within your web browser. No file is sent to a remote server and no data is stored. Closing the tab immediately erases all your work.
How does the studio handle clear height under scaffolding?
Since the tool operates in top-down view, it does not automatically detect height obstacles. You must measure the height under the scaffolding or walkway, then enter this value manually in the control panel of the concerned section.
Can the minimum required width for the route be modified?
Yes. The width, height, slope and radius values written in the studio booklet are modifiable parameters. You can adapt them according to the project description or requests made by your sector's rescue services.
Does the software calculate the exact rotation of the truck axles?
No. The studio does not perform dynamic steering maneuver simulation. It draws tangent arcs and applies a geometric envelope widening formula based on the outer radius you indicated for the turn.
How to export the access plan created with the free version?
You can export an image of your installation plan in PNG format directly from the tool. In this free version, the generated image includes a standard watermark and does not contain your company's custom graphic elements.
How to price the cost of rolling plates and fences?
The studio transmits equipment quantities in the form of a price-free quote draft to the paid Tenders software. You apply the rates of the ACIP database there to integrate these installation expenses into your offers or change orders.