How the surface of a facade scaffolding is measured
Calculating the surface area of a facade scaffolding to draw up a quote in French-speaking Switzerland is based on precise measurement rules. A measurement error directly alters the quantities listed in the tender of the trade contractor or the scaffolder. According to the logic of the SIA 118/222 standard, the measurement surface does not correspond to the simple projection of the masonry wall. The calculation takes the total length of the scaffolding and multiplies it by the height taken from the support ground up to one metre above the last decking level. If the construction site requires a roofer's safety parapet higher than this standard metre, the retained height goes up to the top of this protection.
The tool applies this starting logic as soon as it opens. It displays the measurement surface as well as the billed surface alongside, taking into account a standard minimum pricing. The gross surface obtained serves as a basis to define the items of the tender description. However, the project description and the contractual limitation periods in force take precedence on the construction site for the final billing. Art Construction remains independent of the SIA and the CRB. This tool serves as a technical support to check your surfaces visually and with figures before sending your quotes.
Bays, levels and height of the top decking
To build a reliable measurement, the site manager and the surveyor must break down the modular structure. As soon as it opens, the studio presents a preconfigured view with an average-length facade, a height corresponding to a three-story building eaves, and a load class 3. These parameters remain fully modifiable according to the project's needs.
The studio calculates the modular layout by bays. It takes the length of the facade, adds the necessary overhang at the corners to ensure the continuity of the guardrails, and then divides the whole by the unit length of a bay. This calculation method avoids forgetting end overhangs. The studio determines in parallel the number of floor levels, the exact height of the top working decking, and the total height of the vertical uprights. Knowing the altimetry of the top working floor makes it possible to check secure access to the eaves or roof edges without improvising on-site.
Addenda that change the billed surface
In the field, the base structure represents only part of the scaffolding file. The award includes additional services that modify quantities or add distinct lines in the tender. Forgetting these extras when submitting the price distorts the profitability of the intervention.
The studio integrates the breakdown of the main addenda encountered on construction sites in French-speaking Switzerland:
- Roofer's safety parapet: essential peripheral protection during roof interventions, with a height greater than the classic guardrail.
- External stair tower: attached access module, essential for personnel circulation and the routing of small tools.
- Protection net or tarp: installation of dust-proofing elements or weather protection creating additional wind resistance.
- Internal brackets: widening of the decking towards the facade to catch up with a masonry recess or a balcony.
- Long-term rental: extension of the provision of the structure beyond the initial four-week period.
These items are isolated in the measurement in order to prepare site administration records or addenda without dispute with the site management.
Elevation and cross-section: visually check heights
A frequent error consists of measuring the facade on a plan without checking the cross-section of the building. Terrain offsets, window wells, or the natural slope along a gable change the starting point of the scaffolding. A start on sloping terrain requires longer jacks or shoring uprights that modify the overall height taken into account.
The studio generates a scaled dimensioned elevation and a cross-section. This technical drawing makes it possible to immediately check the consistency between the decking levels and the facade openings, such as windows and balcony accesses. The user checks at a glance whether the top floor level arrives at the correct distance under the underside of the eaves. You can export a quantity table in CSV format to check the totals on your spreadsheets. An image in PNG format featuring the elevation and a checklist exports directly to document your construction site technical file.
What the free version does not do
The free version works without registration and without an account, directly in your web browser. It meets the needs of a quick surface check. Nothing is sent to an external server and nothing is kept: closing the tab deletes all entered data. The exported PNG image carries a watermark and the CSV file mentions the use of the free version.
This version presents operational limits that should be known:
- The studio does not automatically read architect plans: you manually enter the length or trace the dimensions on the screen.
- The tool does not provide any unit price or any data from the ACIP database: the result expresses only work quantities.
- The system does not render any regulatory verdict: it compares inputs to modifiable reference values and indicates whether the threshold is "reached" or "not reached".
- The results constitute sizing assistance and do not replace the scaffolder's structural stability calculation note or the official agreement of the competent authorities.
Switching to Tenders to price the scaffolding
To transform these surfaces into a quote ready for signature, work continues in the paid software Tenders. This studio communicates exclusively with this program. When you transfer the measurement from the studio, the data creates a draft quote without a price in your workspace. Financial pricing then takes place in Tenders thanks to the integration of the ACIP price database.
The Pro version removes browser restrictions. It allows you to save the file on a secure construction site with tracking of successive versions over the course of site addenda. You can reload an existing project to adjust a facade following a schedule change. Graphic exports are generated without a watermark, customized with your company's header and colors. Finally, Team mode allows collaborative work between the surveyor in the office and the site manager in the field.
Frequently asked questions
How is the measurement height stopped at the top of the scaffolding?
The SIA 118/222 logic measures the height from the support ground up to one metre above the last working floor level. If roof work requires a roofer's safety parapet exceeding this dimension, the calculation goes up to the top of this safety parapet.
Does the calculator take sloping terrain into account?
You can adjust starting levels on the cross-section and elevation. The entered length and height must incorporate the level differences of the support ground, as the studio does not automatically compensate for unentered slopes.
Why does the billed surface differ from the measurement surface?
The measurement surface represents the geometric dimension of the structure according to calculation rules. The billed surface may apply a standard minimum pricing provided by profession usages to cover fixed transport and assembly costs.
Is my construction site data kept after closing the browser?
In the free version, no file is sent to a server and nothing is saved. Closing the tab erases all your work. Durable backup with history requires the paid Tenders software.
Does the tool directly provide the total amount in Swiss francs?
No. The free version exclusively provides quantities in square metres or work units. To apply unit prices from the ACIP database and edit a financial quote, quantities must be switched to the Tenders software.
How are internal brackets counted in the measurement?
Internal widening brackets are the subject of a distinct linear or surface breakdown in the measurement addenda. They are added to the base service to reflect the assembly work and additional material.
Does this result dispense with a scaffolding calculation note?
No. The studio provides technical assistance for measurement and quote preparation. It does not replace the load transfer study, the specific anchorage plan, or the stability calculation note drawn up by the qualified scaffolding erector.