Construction Site Crane Radius, Boom Tip Load and Swing Zone

Check your construction site crane radius, boom tip load, and swing zone. Free online simulator with no registration required.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

What a crane radius shows on a construction site plan

Positioning a lifting machine on a plot dictates the entire organization of structural work. When a site manager or quantity surveyor places a tower crane or a self-erecting crane on a site installation plan, the primary concern is the hook's working area. The boom circle determines the maximum reach available for unloading a truck, supplying a concrete batching plant, or placing prefabricated elements on the slab.

On the plan, the action radius is not just a simple compass line from the mast axis. The online studio places two distinct machines on a work surface right away: a long-reach self-erecting crane and a tower crane offering superior outreach. Added to this are the site boundaries, the footprint of the building under construction, and a heavy piece placed on the ground between the two machines.

Each represented machine has three concentric circles essential for geometric tracking:

  • The maximum reach circle that outlines the machine's boom tip;
  • The minimum reach circle that marks the distance closest to the mast where the trolley can drop a load;
  • The counter-jib circle that depicts the rear bulk of the structure and its counterweight during rotation.

All these geometric dimensions, as well as the dead weights of the machines, remain editable in the tool. They must be adjusted with the technical data provided by the manufacturer or the machine rental company to reflect the actual situation of the construction site.

The load chart: why the load decreases with reach

A crane's lifting capacity varies continuously along its boom. The further the trolley moves from the mast, the greater the overturning moment exerted on the structure. To preserve the mechanical balance of the machine, the permissible load decreases as the reach increases. The boom tip load thus represents the device's lowest capacity.

The studio applies a theoretical curve based on a constant lifting moment. This mathematical relationship links the horizontal distance and the lifted mass. Near the mast, the curve is clipped so as never to exceed the maximum permissible load by the hoist and the lifting reeving. As soon as the trolley crosses this critical distance, the authorized mass drops continuously to the tip of the boom.

The tool displays this net allowable value in real time when hovering the cursor over the plan. An integrated load chart graph also positions the site elements relative to this theoretical curve. It should be noted that Art Construction is independent of the SIA, CRB, and CFST. The profile calculated by the tool remains a simplified approximation and does not reproduce the technical data sheet of a machinery manufacturer. Only the calculation note provided by the equipment supplier is authentic during crane installation.

Comparing a load placed on the plan to what the crane can lift

The costly mistake on the ground often occurs when pouring a distant wall or dropping a prefabricated staircase. A team is frequently seen ordering a full concrete skip without checking whether the reach at the pouring point allows for this mass. The crane operator gets blocked by the machine's overload safety devices, the concrete starts to set in the skip, and the mixer truck waits in queue on the access road.

To avoid this situation, the studio offers a direct comparison on the installation plan. In the basic configuration, a load is placed between the two modeled cranes. The tool calculates the exact distance between the element to be lifted and the center of each mast, then checks the corresponding lifting curve.

In our demonstration case, the heavy piece exceeds the capacity of the self-erecting crane at this precise distance, but falls within the lifting capacities of the tower crane. The system does not display any legal verdict or administrative validation. It reports a precise technical state:

  • "Reached" or "Not reached" mention depending on the available capacity;
  • Clear reporting of overloads compared to the calculated threshold;
  • Explicit alert in the event of dropping outside the boom reach.

The site manager immediately visualizes which machine can handle each piece of equipment without putting the team in operational difficulty.

Pads, distribution plates, and ground pressure

A crane's stability relies on transmitting vertical forces and tipping couples to the foundation soil. Whether the machine rests on a quick-setting outrigger chassis or on articulated pads, each support concentrates significant forces. Poorly evaluated bearing capacity leads to differential settlements capable of deflecting the mast from its verticality.

The studio makes it possible to estimate the maximum reaction transmitted under a support pad. This value stems from the dead weight of the device, the base ballast, and the theoretical overturning moment entered by the user. Facing this downward load, the resistance of the foundation soil must be entered. The interface offers several common ground contexts or direct entry:

  • Backfilled earth platform;
  • Asphalt coating or roadway;
  • Custom permissible value from the geotechnical report.

Based on these parameters, the studio determines the minimum surface area of the distribution plate to be placed under each pad to spread the pressure. This sizing aid in no way replaces civil engineering calculations. The tool does not integrate out-of-service wind calculations, foundation block verification, or the overall crane stability calculation. The company must entrust the final analysis to the engineering office or the installation supplier.

Swing zone, counter-jib, and crossing of two cranes

The placement of two cranes on the same plot raises the issue of interference management. When the booms overlap, the hook trajectories can cross during routine maneuvers. On the installation plan, the overlap zone of the two boom circles appears distinctly to warn the quantity surveyor and site manager.

The view offered by the studio is from above. Consequently, the hook heights entered in the interface are not used to deactivate the geometric crossing alert: as soon as the circles intersect on the horizontal plane, the superposition remains flagged. It is up to the trade contractors to study the actual level differences and electronic zone limitation systems.

The swing over neighboring plots constitutes a second point of attention. The maximum reach circle makes it immediately possible to identify the property boundaries crossed by the boom. Similarly, the counterweight trajectory must not be neglected: the counter-jib circle highlights the risks of collision with an existing building, a facade scaffolding, or an overhead line during free out-of-service slewing.

What the free version does not do

This page gives free and open access to the crane placement studio. Use requires no registration or prior account creation. The application runs entirely within your internet browser: nothing is sent to remote servers and nothing is kept in external memory. As soon as you close your navigation tab, all entered and modified data disappears.

This free version was designed as a visual and geometric aid tool, which implies several transparent technical limits:

  • It integrates no unit price and no data from the ACIP database for pricing installations;
  • It issues no official regulatory or safety feasibility verdict;
  • It relies on a constant theoretical moment lifting curve and not on a complete manufacturer chart;
  • It does not handle dynamic stability calculation against overturning, out-of-service storm winds, or deep foundations;
  • It does not allow saving work variants or archiving a file over several days.

The estimates obtained help prepare site organization, without substituting for the validation of a civil engineer or the administrative authorizations of communal or cantonal authorities.

Switch to Tenders to price the crane

The preparation of a building site systematically leads to the financial valuation of general installations. Cranes mobilize substantial budget items including transport, exceptional convoys, assembly by mobile crane, technical visits, monthly rental, and final dismantling. These expenses must fit into the right bill of quantities items or tender addenda.

Switching to the paid version of this tool is done within the Tenders software. No other paid software is involved in this process. The export generated by the drawing studio to Tenders takes the form of a draft quote without prices. It takes over the quantitative list of drawn equipment: crane type, boom length, and main layout accessories.

In the Tenders module, you can complete this framework with the ACIP price database to build a detailed commercial offer. You will find the advanced features essential for construction management teams:

  • Permanent cloud project backup with successive version management;
  • Reopening and subsequent modification of your installation plans;
  • Editing clean plans without watermarks, customized to the company's colors and logo;
  • File sharing and collaborative work thanks to Team Mode.

This direct link between the layout diagram and the budget estimate makes it possible to evaluate the cost of a crane before sending the final tender to the client.

Frequently asked questions

How does the studio calculate the lifting capacity along the boom?

The calculation applies a theoretical relationship at a constant lifting moment between reach and mass. The capacity obtained is limited by the hoist for the maximum permissible load. This plot provides a technical order of magnitude but does not replace the crane manufacturer's load chart.

Does the free version save my installation plans?

No. The free simulator runs locally in your internet browser. No information is transmitted or saved on a server. When you leave or refresh the page, all entered dimensions and positions are permanently erased.

Why does a crossing alert appear if my booms are at different heights?

The studio handles a top-down two-dimensional geometric view. The mast heights entered in the parameters are not used to lift the interference alert. As soon as two boom circles intersect horizontally, the tool warns the user of zone overlap.

How to size the shimming plates under the support pads?

The software divides the estimated maximum support reaction by the allowable ground stress you choose (asphalt, backfill, or manual value). The minimum surface area obtained guides the choice of wood or steel plates, subject to a complete soil investigation.

Can the result be used to obtain a swing authorization?

The plotting of the boom radius makes it possible to visualize the swing over neighboring plots to put together your file. On the other hand, the result remains an internal technical aid and does not constitute an admissible administrative document without the validation of the competent authority.

Which crane elements can be priced with the paid version?

By transferring the project to Tenders, you transform the sketch volumes into priceable items with the ACIP database: crane rental, assembly, dismantling, transport, and special foundations. The studio sends an unpriced draft to be valued.

Does the tool take into account the out-of-service wind force on the crane?

No. The studio does not perform any dynamic stability calculations, out-of-service storm winds, or foundation slab reinforcement. The overturning moment is only used to approximate the reaction under a pad under normal operating conditions.