Loading...
About this tool
What you need to provide for hygiene and breaks on a construction site
Organising site logistics requires anticipating team needs right from the installation phase. Sanitary facilities, rest areas and waste storage zones form the foundation of everyday life for trade contractors. A lack of space or equipment slows down work rates and creates tension on the ground.
On the construction site, you must coordinate the successive arrivals of the trades. Between structural work, installers and finishing work, the number of people present varies every week. Planning toilet cabins, canteens and metal containers requires knowing peak staffing levels. The site logistics calculator helps you position these elements on your plan before work begins.
The studio starts directly in your web browser with a concrete example: a deconstruction or renovation construction site with eighteen people present at the same time. The starting configuration includes two site toilets, two twenty-foot changing room containers and four sorting skips. The studio immediately compares what is installed with the theoretical needs calculated for this workforce.
A visual checklist indicates the status of your setup:
- Orange colour: no equipment has been installed yet in the selected zone.
- Red colour: the installed equipment is insufficient for the entered workforce.
- Green colour: the volume or number of necessary items has been reached.
Use is free and without registration. No data is sent or saved on a remote server: if you close your browser tab, the modifications made are erased immediately.
Site toilets: how many for your workforce
The sizing of sanitary facilities depends directly on the maximum number of workers present on the site. To determine the actual number of site toilets, the studio applies a starting rule from its technical handbook: one toilet for fifteen people present. These values remain entirely modifiable in the tool to adapt to cantonal guidelines or your project's constraints.
In the starting example with eighteen collaborators, a single toilet cabin is not enough. The calculation indicates that two units are needed to cover requirements. With two cabins installed, the studio displays the green indicator to signal that the minimum threshold has been reached.
| Simultaneously present workforce | Calculated number of toilets | Installation status |
|---|---|---|
| 1 to 15 people | 1 toilet | Reached from 1 cabin installed |
| 16 to 30 people | 2 toilets | Reached from 2 cabins installed |
| 31 to 45 people | 3 toilets | Reached from 3 cabins installed |
The duration of facilities also counts in administrative tracking. In the studio, the duration of availability of mobile toilets is expressed in measured weeks. This duration makes it possible to quantify rental and regular maintenance over the entire duration of the construction site.
The costly mistake on the ground
We often see facilities planned only for the initial masonry team. When building services subcontractors arrive as reinforcements at the same time, the workforce doubles without notice. Existing cabins quickly become unsanitary and the labour inspectorate flags the shortcoming. The right reflex is to review the general work schedule to align the number of sanitary cabins with the month when the cumulative number of workers is highest.
Changing rooms and break rooms: surface area per person
Providing a clean shelter for meals and changing clothes is mandatory on construction sites. To determine the site facility surface area per person, the studio handbook uses a calculation base of 1.2 m² of break room and changing room per person, with a minimum total surface area set at 6 m². This data remains configurable in the studio options according to your own habits or the client's requirements.
To meet these space needs, companies commonly use modular containers. The studio incorporates a standard twenty-foot container offering a usable surface area of 14.8 m². When calculating for a group of eighteen workers:
- The calculated gross requirement reaches 21.6 m² of changing room and canteen (18 people multiplied by 1.2 m²).
- A single twenty-foot container (14.8 m²) displays a red indicator because the usable surface area remains below the requirement.
- Adding a second module brings the usable surface area to 29.6 m², turning the indicator green.
As with sanitary facilities, the measurement of site huts is established in rental weeks. You thus precisely track the volume of facilities to maintain on the ground. The generated layout plan can be exported directly as a PNG image for your construction files.
Remember that the values integrated into the tool are modifiable proposals: they must be confirmed by checking the federal ordinances applicable to construction sites as well as the guidelines of the competent cantonal authority.
Sorting skips: streams and renovation
Management of residual materials on construction sites is governed by the Ordinance on the Prevention and Disposal of Waste. The general principle requires separating recoverable materials directly at the source. To help your logistics, the studio suggests a set of construction waste sorting skips adapted to the declared activity.
In standard new construction, the studio offers three separate collection streams:
- Inert mineral materials (concrete, bricks, mortars).
- Untreated waste wood or wood from formwork.
- Mixed combustible waste (packaging plastics, composite materials).
When you tick the "deconstruction or renovation" box, metal materials become much more present. The studio then automatically adds a fourth stream to recover scrap metal and non-ferrous metals (piping, profiles, dismantled radiators). In the test configuration of eighteen people in renovation, four distinct skips are planned to cover these flows.
Source sorting avoids mixing clean rubble with combustible materials. Methodical separation reduces the volume of mixed skips and simplifies drop-offs at regional sorting centres. The studio gives you a global overview of the number of containers to order from the trade contractor in charge of evacuation upon initial setup.
What the free version does not do
The free version of the logistics studio has been designed to quickly prepare your facilities from your web browser. It has transparent technical limits:
- No unit price or data from the ACIP base is included in this freely accessible tool.
- The studio issues no regulatory verdict: it compares your data with modifiable parameters and only indicates "reached" or "not reached".
- Ratios come from the studio's internal handbook: they are not reviewed against each cantonal directive, with the labour inspectorate always taking precedence.
- The system suggests standard streams but ignores the availability of regional landfills and the clauses of your evacuation contracts.
- Potentially potable water networks, electrical connections and heating capacities for site facilities are not calculated.
- The tool constitutes preparatory assistance and replaces neither the safety and health plan nor local authority permits.
Furthermore, the free tool saves nothing on a server. To keep your files without starting from a blank slate, you can upgrade to Art Construction's Tenders software.
Switching to Tenders
To go further than the simple graphical view, the work prepared in the studio can be linked to our software solution. Transfer to the paid version of this tool is carried out exclusively within the Tenders software. No other product is concerned by this gateway.
The studio then transmits the list of quantities (number of toilet cabins, changing room containers in weeks, sorting skips) in the form of a draft quote without prices. You retake this measurement in the software to apply your company's rates or cost using the ACIP price base.
The Pro version offers tools designed for technical teams:
- Saving projects on a cloud space with version history of successive updates.
- Ability to load a registered construction site at any time to adapt logistics.
- Direct costing of installation items with the ACIP price base.
- Team Mode facilitating collaboration between the site manager and the quantity surveyor.
- Export of the plan image without watermark, in your company's colours and header.
Art Construction is independent of SIA, CRB and CFST. Our tools help you structure your measurements and tenders on a daily basis on construction sites in French-speaking Switzerland.
Frequently asked questions
What is the default ratio for the number of toilets on a construction site?
The studio handbook uses a basic ratio of one toilet cabin for fifteen people present at the same time. For eighteen people, the tool recommends two toilets. This ratio remains modifiable in the studio settings to match the cantonal guidelines of your work zone.
How is the minimum surface area for changing rooms calculated?
The calculation is based on a starting rule of 1.2 m² of canteen and changing room per person, with a floor threshold of 6 m². For eighteen workers, the requirement reaches 21.6 m², which requires two standard twenty-foot containers each offering 14.8 m² of usable space.
Why does an additional skip appear during renovation?
In new construction, the studio plans three streams: inert minerals, wood and combustible waste. When you activate the deconstruction or renovation option, the studio adds a fourth skip dedicated to scrap metal to separate metal elements resulting from the removal of installations.
Is my entered data kept after closing the browser?
No. In the free version, the studio operates entirely within your web browser. No file is sent or saved on a server. If you close your tab or reload the page, the data and modifications made are permanently erased.
Does the studio issue an official regulatory certificate?
No. The studio does not produce any regulatory verdict or official document. It is limited to comparing elements placed on the plan with configurable thresholds by displaying the mention reached or not reached. Decisions of the cantonal labour inspectorate remain the only contractual references.
How to export the created layout plan?
You can export the graphic result as a PNG image file directly from the browser. In the free version, the image includes a watermark, while the version linked to Tenders allows export without a watermark with your company logo.
How to cost the calculated construction site facilities?
The free studio contains no unit price. To value the items, the measured quantities (units and rental weeks) are transmitted as a price-free draft to the Tenders software, where you apply your own scale or the positions of the ACIP base.