Free software · 100% in your browser · no data sent

Flat roof parapet thermal bridge: three-side insulation

Calculate the flat roof parapet thermal bridge in 2D. Analyse three-side insulation, Psi and fRsi values online for free directly in your web browser.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

The flat roof parapet: a cold concrete fin above the insulation

On a flat roof, the reinforced concrete parapet constitutes a critical point for the building's thermal envelope. When it directly extends the roof slab or facade wall without a thermal break, this protruding element acts as a genuine cooling fin. Internal heat escapes through the edge of the slab and rises into the mass of concrete exposed to wind and external temperatures.

The 2D Thermal Bridges Studio models this section using four-node rectangular finite elements on a non-uniform grid. In its initial version, the tool offers the geometry of a bare parapet versus a treated parapet. The two-dimensional heat conduction calculation runs directly in your browser. You immediately visualise the heat flows in the form of vectors and colour maps reminiscent of an infrared camera. You can thus observe the path of the energy bypassing the main roof insulation layer to dissipate through the unprotected upstand head.

Three-side insulation: exterior, top and interior upstand

To limit linear heat loss, the usual construction detail consists of wrapping the concrete upstand on its three free sides: the exterior facing in continuity with the facade, the capping beneath the metal flashing, and the interior face receiving the waterproofing upstand. In the studio, the facade insulation (adjustable thickness and material) extends onto the parapet; the top and interior upstand receive fixed-thickness insulation.

The calculation produces the linear coefficient Ψ at the external dimensions (Ψe) and internal dimensions (Ψi) according to the formula Ψ = L2D − Σ U·l. The U-values and reference lengths of the adjacent standard walls are displayed on the screen to allow you to check the calculations by hand. You compare the bare parapet and the parapet insulated on three sides; the facade insulation is chosen from the list of materials. The studio then compares Ψe with the entered target and limit values, taken from the studio booklet and to be checked against the standard, simply indicating whether the result is lower than or equal to, or higher than the target.

Roof insulation thickness and parapet height

The exact geometry of the wall head directly influences the linear coefficient. The higher the parapet is relative to the finished floor, the greater the surface area of concrete exposed to the open air. Conversely, very thick roof thermal insulation reduces surface heat loss but accentuates the thermal contrast at the junction if the interior upstand is not adequately clad.

In the studio, each dimension can be adjusted to the nearest millimetre. You can modify the total height of the concrete upstand, the thickness of the roof insulation package and the thickness of the load-bearing wall. The mesh adapts without delay and launches two successive resolutions: an energy pass with an internal surface resistance of 0.13 m²·K/W, followed by a moisture pass with 0.25 m²·K/W. The isotherms drawn every 2 °C highlight the thermal constriction according to the thicknesses chosen for the project.

Parapet insulation take-off: quantities without prices

In addition to the thermal resolution, the studio establishes the quantity take-off for the corrective solution. For a parapet insulated on three sides, it gives a single line: the length of insulated parapet, equal to the length of the detail entered, in metres, with its visible formula. This take-off provides quantities without any prices or ACIP base codes.

Use is free, without registration and without creating an account. Nothing is sent to a server and nothing is saved on your drive; if you close or reload the tab, all inputs are erased. The printing of the technical sheet includes an Art Construction watermark and the CSV export mentions the free version. To go further in construction site management, online backup, complete pricing with the ACIP price base and sharing between collaborators are offered in the Tenders, ERP and Portal modules from Art Construction.

Ceiling edge mould: reading the cold spot

The costly mistake on site concerns forgetting the interior insulation upstand under the pretext of facilitating the waterproofing installation. We often see parapets insulated only on the facade and on top. The internal corner located between the ceiling of the top heated floor and the facade then cools down by conduction. During periods of severe cold, the warm and humid indoor air comes into contact with this unprotected cold zone, creating an environment conducive to mould.

The studio calculates the surface temperature factor fRsi and places a pin on the coldest point of the interior facing. Depending on the selected climatic station (Geneva, Zurich, La Chaux-de-Fonds or St. Moritz) and internal relative humidity, the software traces the critical isotherm in red. A three-level verdict indicates whether the surface temperature remains above the threshold, whether it presents a risk of mould according to the principles of SIA 180 standard, or whether it reaches the dew point leading to direct condensation.

Waterproofing and contractor liability

The results provided by the studio constitute a decision-making aid for the site manager, trade contractor or quantity surveyor. They do not replace the calculations of a building physicist or the decisions of the competent authority. The calculation remains stationary in two dimensions and does not deal with three-dimensional singular points such as parapet corners or penetrating fixings. Furthermore, the solver is verified against analytical solutions and a second independent solver, without having re-run the cases in the appendix of the EN ISO 10211 standard, and Art Construction is independent of SIA, CRB and suva.

Contractually in Switzerland, the appearance of mould constitutes a construction defect according to the Code of Obligations (CO) and, when agreed between the parties, according to SIA 118 standard. The contractor who identifies a design flaw during the preparation of their tender or execution on the construction site has a duty to notify the client in writing. By simulating the effect of insulation on three sides, the company supports its duty to notify and anticipates the risks of dispute prior to the installation of the multilayer system.

Frequently asked questions

How does the studio model the fixing of the metal flashing at the parapet head?

The calculation is carried out in two dimensions on a standard cross-section. The screws, fixing brackets or discontinuous plugs that pass through the head insulation to anchor the metal flashing constitute three-dimensional point thermal bridges not integrated into this plane model. However, you can integrate a timber batten or a continuous sheet metal in the block editor.

Why insulate the interior face of the parapet if the roof is already insulated?

Concrete strongly conducts heat. Without insulation on the interior upstand, heat passes under the waterproofing and escapes laterally through the parapet to the outside. This thermal leak cools the interior ceiling corner and increases the value of the linear coefficient Ψe, creating a risk of surface condensation.

Are the limit values of the SIA 380/1 standard integrated automatically?

The studio offers indicative starting values for the target and limit values of Ψe, taken from the studio booklet. These data remain modifiable by the user according to the project requirements. The studio compares your geometry with these parameters and simply indicates whether your value is lower than or equal to, or higher.

Is my input data retained after closing the browser?

No. In this free version, all calculation runs in your browser without local memory or transfer to an external server. If you close the window or reload the page, your geometric modifications and material choices are erased. Remember to print the summary sheet before leaving.

How can I modify the thermal conductivity of the insulation used on the upstand?

The studio offers eighteen starting materials with usual lambda values. You can select the parapet insulation layer and directly replace its value with that mentioned on the technical sheet provided by the manufacturer of your material, whether it is PIR, mineral wool or aerogel.

What is the difference between Ψe and Ψi in the displayed results?

The coefficient Ψe relates to the external dimensions of the facade and roof, and Ψi to the internal dimensions of the heated rooms. The studio displays both values, along with the U-value and reference lengths of each adjacent wall, so that the calculation can be redone by hand.

How can I estimate the financial cost of heat losses from the parapet?

The studio calculates the annual loss in kilowatt-hours according to the formula linking Ψe, the length of the detail, degree-days and the hourly factor. You can enter the unit price of your energy as well as the total length of the parapet to obtain an estimate of the expense generated by this thermal bridge.