Free software · 100% in your browser · no data sent

Internal Insulation Thermal Bridge: Slab, Partition Wall and Insulation Return Strip

Calculate the thermal bridge of a slab or interior wall with internal insulation. Evaluate the insulation return strip with our free online tool.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Insulating from the inside: slab and partition wall crossing the insulation

During renovation work, when the facade retains its mouldings or the building is protected, installing internal thermal insulation is often the only viable option. This approach alters the thermal balance of the existing masonry. The original exterior wall becomes significantly colder in winter because it no longer receives heat from the heated volume. Massive interior elements in direct contact with this exterior wall, primarily the reinforced concrete slab or masonry partition wall, thus create major heat loss.

The slab crosses the thickness of the internal insulation to rest against the cold facade. Heat from the heated room escapes via direct conduction through the concrete to the outside. The 2D Thermal Bridges Studio models this exact junction in two dimensions: old masonry lined with internal insulation (such as graphite EPS, mineral wool, PIR or aerogel) and a slab interrupting this continuous insulating layer.

The calculation runs in your browser using four-node rectangular finite elements on a non-uniform grid. It solves thermal conduction in two successive passes over the same mesh:

  • An energy pass with an interior surface resistance of 0.13 m²·K/W to calculate heat flows and linear thermal transmittance.
  • A moisture pass with an interior surface resistance of 0.25 m²·K/W (while the window maintains 0.13 m²·K/W) to evaluate surface temperatures.

The solver checks the energy balance at each iteration and calculates the linear thermal transmittance at external dimensions (Ψe) and internal dimensions (Ψi) according to the formula Ψ = L2D − Σ U·l. Thermal transmittance values U and reference lengths are displayed so you can perform the check manually.

Return strip under the slab: what it corrects

To limit heat loss along the slab, a common intervention involves installing an insulation return strip on the underside of the slab. This strip extends the thermal path that heat flow must travel through the concrete before reaching the cold zone of the exterior facade.

The studio allows you to compare the detail live before and after adding this return strip, for which you can freely adjust the width and thickness in millimeters. The comparator displays variations in three essential indicators:

  • The linear thermal transmittance Ψe, compared to the limit value and target value you enter. The studio simply indicates whether the result is "less than or equal to" or "greater than".
  • The surface temperature factor fRsi and the minimum surface temperature.
  • The annual loss in kilowatt-hours (kWh), obtained through the calculation: Ψe × length of detail × degree-days × 24 / 1000.

With the initial values, adding a return strip under the slab reduces the value of Ψe; also check fRsi: since the strip is only installed under the slab, the cold spot shifts to the top of the slab. To refine your study, eighteen starting materials are integrated (reinforced concrete, old masonry, bricks, various insulants), but you must replace their thermal conductivity with the values provided on the manufacturer's technical datasheet for the specific construction site.

The cold spot shifts: reading both corners of the slab

A costly mistake in the field is observing only the visible corner where the slab meets the facade without checking the end of the insulation return strip. Internal thermal insulation shifts the cold spot. When applying an insulation strip under the ceiling, the concrete surface directly above the end of this strip becomes a new critical point where the temperature drops if the strip is too short.

On screen, the thermal camera-style color temperature map shows the actual distribution of heat flows:

  • Isotherms are plotted every 2 °C.
  • The critical isotherm linked to the risk of mold appears in a distinct red.
  • A pin automatically indicates the coldest point of the interior detail.
  • An interactive probe displays the exact temperature and flux density under the mouse.

The studio calculates three surface thermal thresholds: maintenance above the critical temperature, risk of mold (defined at the entered surface relative humidity), and surface condensation (dew point). Four Swiss climate stations (Geneva, Zurich, La Chaux-de-Fonds, St. Moritz) serve as the starting point for the outside temperature, which can be modified according to your project's actual situation. Moving the probe along the entire slab, from the facade corner to the nose of the return strip, is the key step to prevent issues and identify any residual condensation risk prior to execution on the construction site.

Renovation of a building where external insulation is impossible

On an urban residential building or a historical structure where the profile and facades must remain intact, internal insulation is required. However, each reinforced concrete floor crossing creates a continuous line of heat loss. If the partition wall is also made of heavy material linked to the facade, the same thermal phenomenon develops vertically.

To address these situations, the studio offers eight common junctions adjustable in millimeters:

  • Slab with internal insulation.
  • Cantilevered balcony.
  • Window reveal and sill.
  • Lintel and roller shutter box.
  • Base of wall on unheated basement.
  • Flat roof parapet.
  • Facade and pitched roof.
  • Outward corner or reinforced concrete pillar.

A free editor composed of rectangular blocks on a 5 mm grid also allows you to draw a specific connection, such as a masonry partition wall of varying thickness. The tool runs 100% in your web browser: no files are sent, nothing is saved on a remote server, and no memory is kept in the browser. Closing or reloading the tab erases all your entries.

Return strip take-off: quantities without prices

The free version of the studio generates the take-off for the corrective solution without prices or amounts. For a slab insulated from the inside, it provides a single line: the internal insulation return strip, equal to the length of the detail multiplied by the width of the strip and by 1.05, in square meters, with its formula visible. Results can be printed (datasheet with cross-section, map and values, bearing an Art Construction watermark) or exported as a CSV mentioning the free version; no ACIP code or description appears.

For foremen and construction managers wishing to integrate these quantities into a company quote, the paid version within our tenders, ERP and portal software allows you to save the file per construction site, price the intervention items using the server-processed ACIP price database, and edit a watermark-free report with export to the commercial offer via the link our Pro offer.

Liability and duty to notify in renovation

The calculation provided by this studio constitutes technical decision support. It in no way replaces a complete thermal study prepared by a building physicist or decisions from competent authorities. The tool is based on a two-dimensional steady-state calculation: it analyzes a cross-section perpendicular to a linear thermal bridge, without addressing three-dimensional critical points such as three-wall corners or the effect of through-fixings.

The solver has been verified against analytical solutions and a second independent solver, but the test cases from the appendix of standard EN ISO 10211 have not been re-run, and no external body has validated the studio. Art Construction is independent of SIA, CRB and suva. Limit or target values associated with standards SIA 380/1 and SIA 180 are indicative starting values that the user must verify at the source.

From a contractual and legal perspective in Switzerland, the appearance of mold or hygrometric failure constitutes a construction defect under the Code of Obligations (CO) and, when agreed upon by the parties, under standard SIA 118. The contractor or foreman who identifies a condensation risk or design flaw linked to an uninsulated slab crossing has a duty to formally notify the client in writing before carrying out the work.

Frequently asked questions

How does the insulation return strip affect the slab?

The return strip installed under the slab covers the concrete near the facade: it reduces heat flow from the slab to the outside and lowers Ψe. It also shifts the cold spot: the studio displays fRsi and locates the cold spot so you can see where it lies after correction.

Does the studio validate the requirements of standard SIA 380/1?

No, the studio does not display any regulatory pass or fail verdict. It calculates the Ψe value and compares it to the limit and target values you freely enter. The tool simply indicates whether your result is "less than or equal to" or "greater than" these reference values.

What surface thermal resistances are applied during the calculation?

The solver applies two successive calculations to the mesh: an initial energy pass with an interior surface resistance of 0.13 m²·K/W for heat loss, followed by a moisture pass with 0.25 m²·K/W to evaluate the risk of surface mold, while window glazing remains fixed at 0.13 m²·K/W.

Is my project data saved by the online tool?

No. The free version runs 100% in your web browser. No files are transmitted to a server and no data is stored in local memory. If you close or reload your tab, all settings and results are permanently erased.

How is the risk of mold evaluated at the slab corner?

The studio determines the surface temperature factor fRsi and the critical mold temperature based on the entered surface relative humidity. It displays a three-tier result: condition above critical temperature, risk of mold, or surface condensation.

Can work pricing be obtained directly in the free version?

No. The free version calculates physical quantities only in the form of a take-off without prices. Access to standardized items and pricing with the ACIP price database are reserved for paid versions connected to our construction management software.

What is the artisan's liability in the event of post-work mold?

Under Swiss law, the presence of mold falls under the construction defect regime according to the Code of Obligations (CO) and standard SIA 118 if incorporated into the contract. If the artisan identifies a thermal risk on a plan or specification, they must formally issue a notice of defects to the client.