About this tool
What a thermal bridge results sheet contains
The results sheet summarizes the thermal data of a construction junction. For a site manager, architect or façade engineer, this technical document brings together the section geometry, the physical properties of the chosen materials and the distribution of heat flows. The tool directly opens the case of a balcony with a high-performance 120 mm thermal break, with the comparative mode active.
On the printable document, you will find the detailed geometry of the junction, the calculated linear thermal transmittance values, the surface temperature factor and the complete thermal map. The studio includes eight standard junctions adjustable to the millimetre:
- Cantilevered balcony with insulating thermal break
- Window embrasure and sill
- Lintel and roller shutter box
- Wall base on unheated basement
- Flat roof parapet
- Slab on interior insulation with return strip
- Façade and inclined roof junction along a rafter axis
- Outer corner or reinforced concrete pillar
A free editor on a 5 mm grid also allows you to draw custom rectangular block assemblies. The sheet also mentions the adjacent standard walls, their U-values and the associated lengths to verify the calculation manually.
Ψe, Ψi and fRsi: values to report
The calculation using four-node rectangular finite elements runs on a non-uniform grid directly in your browser. Two successive passes take place on the same mesh: the first energy pass applies an interior surface thermal resistance of 0.13 m²·K/W. The second moisture pass uses 0.25 m²·K/W on opaque walls, while the window frame remains at 0.13 m²·K/W. Temperatures are solved from 0 to 20 °C then scaled to the chosen climatic conditions.
The linear thermal coefficient is expressed according to the formula Ψ = L2D − Σ U·l. The sheet displays the coefficient at exterior dimensions (Ψe) and interior dimensions (Ψi). The studio never caps a negative Ψe result unless you manually enable the option. The Ψe value is compared to a limit value and a target value entered by the user, initially taken from specifications for SIA 380/1 standard requirements. The programme indicates whether the obtained value is lower than, equal to, or higher than these benchmarks.
The surface temperature factor fRsi is used to assess hygrothermal behavior at the coldest point. The studio calculates the critical mold formation temperature according to the desired surface relative humidity, as well as the dew point. The diagnosis is established according to three states: temperature above the critical threshold, risk of mold, or surface condensation. The fRsi threshold is adjusted based on the retained outdoor temperature.
The temperature map in the report
The two-dimensional temperature map offers a visual reading similar to an infrared camera inspection. It illustrates the path of flows through the layers of materials and the geometric or structural thermal bridges.
The display incorporates several visual markers:
- Isotherms plotted every 2 °C to read the decrease in heat
- The critical mold formation isotherm highlighted in red
- Flow vectors oriented according to the heat leakage
- The complete mesh of the finite element modelling
- An automatic pin pointing to the coldest location on the internal face
By moving the mouse cursor over the section, an active probe reads the exact temperature and local flux density. The thermal comparator compares the initial section with the treated variant: thermal break, insulation return in the embrasure, wall base block or shutter box lining. It calculates the difference in Ψe, fRsi and the difference in annual energy loss in kilowatt-hours over the length of the detailed information provided, based on degree-days and the energy cost indicated by you.
Free sheet and supporting document: what is left for the building physicist to do
Access to the studio is free, without registration and without creating an account. The entire calculation is carried out within the browser: no files or data are sent to an external server. No local memory is retained. If you close or reload the page, all entered elements are immediately erased. Paper or PDF printing of the sheet features an Art Construction watermark, and CSV export specifies the mention of the free version.
This rapid analysis document does not replace a file signed by a building physicist nor the final decision of control authorities. Several calculation limits must be taken into account on the construction site:
- Two-dimensional stationary resolution does not handle three-dimensional junctions, such as the corner of three walls or the penetration of a through-anchor.
- The solver has been checked against analytical solutions, but the test cases in the appendix of standard EN ISO 10211 have not been re-run.
- Unheated spaces are assimilated to outside air without simulation of natural ground.
- The window profile and its glazing form a simplified homogeneous assembly, and the shutter box is simulated by an equivalent air layer with lining.
The eighteen basic materials (reinforced concrete, clay bricks, EPS insulation, stone wool, XPS, PIR, aerogel or cellular glass) provide starting values. The manufacturer's technical data sheet data remains the reference for the actual project.
Pro Report without watermark and ACIP pricing
On site, the frequent mistake consists in ordering insulating material with a thermal conductivity different from the calculation assumption, degrading the fRsi value below the threshold without prior verification. In the free studio, a quantity take-off of corrective components indicates the calculated quantities: linear meters of balcony thermal break, wall base block, embrasure insulation, aluminum sill or insulated parapet, and surface area of shutter box lining or return strip. This free version offers no prices and contains no codes or descriptions from the ACIP database.
To integrate these studies into your daily management, advanced versions of our software provide complementary tools:
- Saving calculations and thermal bridge variants per construction site with online archiving
- Generation of a PDF report without watermark, customized with your company letterhead
- Pricing variants with ACIP database items processed on server
- Direct sending of take-off lines to your quote preparation
- Collaborative team work on the same execution files
Discover these management and pricing functions in our tenders module or via the centralized management modules on our company portal.
Liability: energy dossier and construction defects
Envelope thermal control is not limited to submitting the building permit application. Provisions relating to thermal bridges also concern the preservation of structures and indoor health regarding condensation and mold, falling under SIA 380/1 and SIA 180 standards.
In Swiss construction law, the appearance of moisture damage or mold on interior finishes constitutes a construction defect. Compensation and repair rules fall under the Code of Obligations (CO) and adopted contractual clauses, such as SIA standard 118 if agreed between the parties. The general contractor, trade master or site manager has a duty to report any manifest defect in insulation design or risk of condensation before carrying out their work.
The use of this technical sheet constitutes an aid to preparation and technical decision-making. Starting climatic data based on Geneva, Zurich, La Chaux-de-Fonds or St. Moritz, just like target requirements, remain indicative data that the user must check according to the geographical situation of the structure.
Frequently asked questions
What is the difference between the Ψe value and the Ψi value?
The Ψ coefficient expresses the linear thermal transmittance added by the thermal bridge. Ψe refers to the exterior geometric dimensions of the building, whereas Ψi is based on interior measurements. The sheet presents both calculated values as well as the U-value and lengths of adjacent standard walls.
Does the result of this calculation constitute an official supporting document?
No. The sheet printed from the free version serves as a technical study aid. It does not replace the expert report validated and signed by a building physicist nor the decision of the competent authority examining the building permit application.
Why does the free sheet include a watermark?
Free printing incorporates an Art Construction watermark to mark its preliminary study use without account creation. Printing a technical report without a watermark with your company logo is part of the features of paid Tenders, ERP and Portal software.
How are calculation temperatures determined?
The studio loads by default climate data from stations such as Geneva, Zurich, La Chaux-de-Fonds or St. Moritz. You can freely modify the outside temperature, indoor setpoint as well as the surface relative humidity rate to adapt the analysis to your local situation.
Does my data remain saved on your servers?
No. The calculation runs 100% in your web browser. No geometric or thermal data is transmitted or stored on a server. As soon as you close or reload your tab, all entered information is immediately erased.
Is the studio affiliated with SIA or CRB?
No. Art Construction is entirely independent of SIA, CRB and CFST. The target and limit values proposed in the settings are working benchmarks that the user must verify with technical sources and specifications.
How to price insulation solutions with ACIP prices?
The free version calculates only physical quantities without financial amounts. Price calculation with the ACIP database and direct integration of items into your company quotes are provided on server within our paid tender management software.