Free software · 100% in your browser · no data sent

Balcony slab thermal bridge: comparing continuous slab and thermal break

Assess balcony slab thermal bridges with or without thermal breaks. Free online browser software to compute psi values and detect mould risks effectively.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Why the balcony slab is the most prominent thermal bridge of an insulated facade

On a construction site, the cantilevered balcony slab represents a major thermal leak when it penetrates the insulated envelope. Reinforced concrete strongly conducts heat from the heated interior to the exterior. The slab acts as a continuous cooling fin along the entire length of the facade.

In an externally insulated concrete facade, the interruption of the insulation at the slab creates significant linear heat loss. This heat flow lowers the surface temperature at the interior corner between the floor and the wall. In practice, this phenomenon promotes condensation and degradation of interior finishes.

The 2D Thermal Bridges Studio directly opens the balcony slab example. It calculates two-dimensional heat conduction using four-node rectangular finite elements on a non-uniform grid. The energy balance is checked with each calculation and the result is displayed immediately in your browser.

Continuous slab or thermal break: what 2D calculation compares

The studio allows you to directly compare two situations: the continuous reinforced concrete slab without insulating element and the detail equipped with a thermal break. You immediately visualize the impact of each variant on energy flows.

The engine performs two successive resolutions on the same mesh: an energy pass with an interior surface resistance of 0.13 m²·K/W and a moisture pass with 0.25 m²·K/W. Temperatures are calculated from 0 to 20 °C then scaled according to your project's temperatures.

The tool displays the linear coefficient Ψ at exterior dimensions (Ψe) and interior dimensions (Ψi) according to the formula Ψ = L2D − Σ U·l. The U-values and reference lengths of adjacent walls remain visible to recheck the calculation by hand. The studio compares Ψe to the limit value and target value entered by the user, simply indicating "less than or equal" or "greater". It also displays an estimate of the annual loss in kWh calculated according to the entered length, degree-days and the formula Ψe × length × degree-days × 24 / 1000.

Insulation and thermal break thickness: what changes the result

The geometry of the detail directly modifies thermal performance. In the studio, you can adjust in millimeters the thickness of the concrete wall, that of the facade insulation, the slab thickness as well as the reach of the exterior balcony.

The choice of the insulating component is decisive: you can select an 80 mm thermal break or a high-performance 120 mm model. The library integrates eighteen starting materials (reinforced concrete, bricks, graphitized EPS, rock wool, XPS, PIR, balcony thermal breaks). Their thermal conductivities are starting values that can be modified according to the manufacturer's technical data sheet.

An infrared camera-style color temperature map displays isotherms every 2 °C as well as flux vectors. A probe reads the temperature and flux density under the mouse, which makes it possible to check the exact influence of the thermal break thickness on the thermal gradient.

Cold spot on the room ceiling: mold and fRsi factor

The most vulnerable point is located at the interior junction between the lower room ceiling and the facade. When the continuous slab evacuates heat to the outside, the surface temperature of this corner drops rapidly.

The studio places a pin on this cold point and calculates the surface temperature factor fRsi. Depending on the interior and surface relative humidity entered, the software determines the critical mold temperature as well as the dew point. A red critical isotherm materializes this risk zone on the section.

The verdict is expressed according to three states: above critical temperature, mold risk or surface condensation. The fRsi threshold depends on the chosen outside temperature. Four climate stations are offered initially (Geneva, Zurich, La Chaux-de-Fonds, St. Moritz) with modifiable values.

Thermal break takeoff: quantities without prices, ACIP pricing in Pro version

The free tool includes an automatic takeoff of corrective solutions. It provides the length of the balcony thermal break in the form of gross quantities, without prices or item codes. You can export this data in CSV format or print a technical sheet bearing an Art Construction watermark.

Use of the free version is unrestricted, without an account and without registration. The calculation runs entirely in your browser. No data is sent to a server or stored in memory: closing or refreshing the page resets the input.

To integrate these elements into a complete quote, the paid modules Tenders, ERP and Portal allow you to save construction sites on the cloud with version management, price using the ACIP base on server, work in a team and edit reports without watermarks.

Contractor liability for a balcony without a thermal break

On the construction site, creating a through balcony slab without a thermal break exposes to serious disputes once the work is delivered. The appearance of mold or cold air infiltration on interior finishes constitutes a recurring defect.

In Switzerland, construction defects fall under the Code of Obligations (CO) and, when agreed in the contract, the rules of SIA standard 118. The contractor and site management remain bound by a duty to notify: facing an execution plan providing for a continuous slab without a thermal break, the trade contractor must report in writing the risk of condensation to the client or site management.

This 2D studio constitutes technical decision-making support to evaluate variants. It does not replace justifications established by a building physicist or decisions of local authorities. The starting limit and target values are inspired by the principles of SIA standards 380/1 and SIA 180, and must be verified according to the contractual requirements of the project.

Frequently asked questions

How does the thermal bridge calculation work in the browser?

The calculation is based on the two-dimensional finite element method with a four-node rectangular mesh. The analysis runs locally in the web browser without data transfer to an external server. The energy balance is checked at each resolution.

What climate data is taken into account for the balcony?

The studio offers four modifiable starting climate stations: Geneva, Zurich, La Chaux-de-Fonds and St. Moritz. The user freely adjusts the outside temperature, inside temperature, degree-days and surface relative humidity according to the construction site.

What is the difference between the displayed Ψe and Ψi values?

The linear coefficient Ψe relates to the exterior dimensions of the building, while Ψi uses the interior dimensions. The calculation applies the formula Ψ = L2D − Σ U·l. The Ψe value is never clipped by default unless explicitly requested by the user.

What are the technical limits of 2D modeling?

The modeling deals with a stationary section perpendicular to the linear thermal bridge. It does not integrate three-dimensional singular points such as facade corners or point reinforcements. The test cases in the appendix of standard EN ISO 10211 have not been replayed.

Do my calculation data remain saved if I close the tab?

No. The free version operates without an account and without local memory. As soon as the browser tab is closed or reloaded, the geometry, parameters and calculation results are completely erased.

Can the provided thermal conductivities be used without verification?

The conductivities of the eighteen integrated materials are indicative starting values. To dimension a real structure, you must replace these figures with the values declared on the technical data sheet of the manufacturer of the selected product.

How to get the financial pricing of the measured thermal break?

The free version provides only the linear quantities of thermal break. To price tender items with the ACIP database and inject the amounts into a company quote, you must use the Pro version on the Art Construction servers.