EI30 or EI60 fire-resistant encasement of a steel beam: VKF rules and board quantity take-off

Calculate EI30 or EI60 fire protection board quantities for steel beams following VKF rules. Free online browser-based tool without registration.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Why an unprotected steel beam is a critical weak point during a fire

On a renovation construction site or when opening a load-bearing wall, steel is popular for its high load-bearing capacity combined with a low structural depth. However, bare metal reacts very quickly to thermal increases during a blaze. As soon as the room temperature rises, the yield point of the steel drops and the section loses its stiffness under service load. An unprotected HEB, HEA, or IPE beam can deflect suddenly, leading to structural failures on upper floors long before adjacent masonry walls give way.

To preserve structural stability in line with VKF requirements (Vereinigung Kantonaler Feuerversicherungen), the steel section must be fitted with a thermal barrier. Steel does not burn, but its high thermal conductivity means the heating of the web and flanges must be delayed. Solid board encasement forms this physical barrier to maintain the beam's load-bearing capacity for the duration required by fire protection regulations.

EI30 or EI60: which rating applies to your building (detached house, condominium, public building)

The required standard depends on the building's use, the number of storeys, and the expected fire load. In a single-family house or low-rise home, EI30 protection is commonly specified for primary load-bearing elements. By contrast, for condominium apartment buildings (PPE) or public-access buildings, VKF regulations frequently mandate an EI60 fire resistance rating, using materials classified as RF1—meaning non-combustible with no contribution to fire.

The choice between EI30 and EI60 governs the total cladding thickness and the type of boards to install. An EI60 rating often requires double layers of specialist boards or increased thickness according to the protection system manufacturer's certificate. For contractors and construction site managers, this directly impacts the volume of panels to order, the dead weight suspended beneath the lintel, and the overall finished dimensions of the casing below the ceiling.

Three-sided encasement: boards, joints, and cladding

When opening a load-bearing wall or inserting a support beam below a concrete slab, the top flange of the steel section remains in direct contact with the retained masonry or non-shrink dry-pack mortar bed. Fire-resistant cladding is therefore applied to three sides: both vertical flanks and the underside of the beam. Glass-fibre reinforced plasterboards or calcium silicate boards are cut and mechanically fastened according to the technical approval sheet of the chosen system.

Continuity of the protective envelope remains the most critical installation factor. Board joints must be staggered and filled with the firestop compound specified in the manufacturer's test certificate. No air gap must remain along the junction between the upper board edge and the underside of the existing wall. Where ceiling hangers penetrate the encasement to support a suspended ceiling, every penetration requires intumescent sealant to prevent heat transfer to the steel flanges.

Fire encasement quantity take-off: developed perimeter and 10% allowance

A fire protection board quantity take-off involves more than just the beam length. For a steel beam, you calculate the developed perimeter across the three exposed faces: the left flank height, the bottom flange width, and the right flank height, taking into account board thicknesses at the corners. For an HEB section spanning a 3.50-metre opening, multiplying this developed perimeter by the span gives the theoretical net surface area.

On the construction site, mitre cuts, offcuts, returns onto masonry supports, and corner laps consume raw materials. Studio Statique applies a standard ten percent allowance to the calculated surface area. This ratio allows the estimator to calculate the precise square metres of boarding required when ordering supplies, avoiding shortages during the cladding phase.

What the studio does not calculate: timber fire resistance and manufacturer test data

This browser-based calculation tool restricts its thermal sizing strictly to hot-rolled steel sections. The fire resistance of solid timber or glulam beams relies on an inherent charring rate that is not calculated here: the fire resistance of timber must be checked independently. Furthermore, exact insulation values and board thicknesses depend on the manufacturer's official test certificate, which the contractor must consult to validate the proposed assembly.

Load-distribution calculations rely on simply supported static assumptions on two supports. Altitudes are sourced from the official swisstopo list of localities; snow adjustments Δh and wind peak velocity pressures q_p0 from standard SIA 261 are only prefilled for eight reference locations, defaulting to 0 m and 0.9 kN/m² for others, and must be verified. The tool runs without registration and transmits no data to external servers: reloading the page clears all inputs. To organise supporting documents and generate structured quotes without watermarks, explore the features in our Soumissions or business Portail modules.

Contractor liability and fire protection specialist sign-off

The pre-sizing provided by the studio is designed to assist with site preparation and material quantity estimation. It is never a substitute for on-site inspections, a structural engineer's calculation report complying with SIA 260 to 266 standards, or detailed execution drawings. Demolishing any load-bearing masonry remains the contractor's liability and requires prior validation of temporary propping before wall cutting begins.

Regarding fire safety, cantonal or municipal building authorities routinely require a fire protection certificate signed by an accredited specialist. This professional ensures that the system installed on the construction site complies with the manufacturer's test data and VKF requirements for the specific building use. Before ordering your steel sections and boards, discover our advanced solutions on our dedicated professional pricing page.

Frequently asked questions

What board thickness is required to achieve EI60 on a steel beam?

The required thickness depends on the section factor (A/V ratio) of the steel beam and the manufacturer's fire test reports. Depending on the chosen system, an EI60 rating generally requires between twenty and forty millimetres of specialist RF1-rated boards, installed in single or double staggered layers with fully sealed joints.

How does the studio account for cutting waste on protective boards?

The take-off module calculates the developed surface area across the three exposed faces of the beam and automatically adds a ten percent allowance. This factor accounts for losses caused by longitudinal cuts, corner overlaps, and returns against the bearing masonry on the construction site.

Why protect only three faces rather than boxing in the entire beam?

When installed below an existing wall or concrete floor slab, the top flange is clamped tight against the mineral substrate using non-shrink dry-pack mortar. Fire cannot attack this concealed face. Three-sided encasement is therefore sufficient to insulate the steel against direct flames and radiant heat.

Does the studio calculate the fire resistance of solid or glulam timber lintels?

No. The thermal encasement calculation only applies to hot-rolled steel beams such as HEA, HEB, or IPE sections. Timber resists fire through the gradual formation of a protective insulating char layer, which requires a separate residual cross-section check in accordance with standard SIA 265.

Are my construction site structural calculations stored in the browser?

The free version operates entirely client-side within your browser. No files are transferred to a server and no local cache is retained. Closing or refreshing the page immediately clears all entered data regarding spans, loads, and encasement quantities.

What is the difference between an RF1 classification and an EI60 rating?

RF1 designates the reaction to fire of the material, certifying that it does not contribute to the fire and generates no toxic smoke. An EI60 rating denotes the fire resistance of the complete building assembly, ensuring integrity against hot gases (E) and thermal insulation (I) for sixty minutes of exposure.

Can board encasement be replaced with intumescent paint?

Intumescent paint provides an alternative solution for protecting structural steel without increasing profile bulk, subject to application compliant with the manufacturer's test certification. It requires strict monitoring of wet and dry film thicknesses, whereas board encasement offers a robust, rigid barrier that is straightforward to inspect visually.