Loading...
About this tool
Glazed façade opening: a load-bearing wall that also supports the roof
Opening a façade to install a patio door alters the overall structural equilibrium of the building. Unlike an internal spine wall that often only carries floor slabs, an external wall combines several types of actions. It bears the self-weight of the masonry from the upper storeys, the adjacent floor slabs and the roof. This roof transfers the permanent loads of the timber framework and roofing, as well as variable climatic actions.
On a renovation construction site, a typical opening of 3,20 m requires an accurate load takedown. In the representative example of Bulle, at an altitude of 771 m with an altitude adjustment of 200 m, the façade carries one upper floor and the roof pitch. The steel lintel receives all of these forces across two simple supports. To prevent differential settlement and damage on the upper storeys, the mason must identify each load takedown before wall sawing.
The static studio makes it possible to assess this load takedown for an opened wall. You enter the number of supported storeys, the span of the slabs to the left and right, as well as the share of the roof resting on the pier. The tool computes support reactions, bending moment and shear force according to a linear elastic model on two simple supports.
Snow according to altitude: the SIA 261 standard calculation for an elevated plateau municipality
In western Switzerland, snow actions vary considerably with the terrain. Standard SIA 261 defines the characteristic ground snow load via an equation linked to the reference altitude. The altitude taken into account adds the raw altitude of the site to the local adjustment value. For the municipality of Bulle, situated at an altitude of 771 m with an adjustment of 200 m, the reference altitude reaches 971 m.
The characteristic ground snow load is obtained by the formula:
s_k = max([1 + (h₀ / 350)²] · 0.4 ; 0.9)
with h₀ = h + Δh.
This ground load is then converted into a roof load using a shape coefficient. This coefficient depends on the roof pitch and the possible presence of snow guards. The studio loads the official list of localities from swisstopo: the altitude is retrieved from the selected postcode. The local adjustment Δh and the peak velocity pressure q_p0 are pre-filled for eight localities from the workbook (Lausanne, Genève, Sion, Verbier, Bulle, La Chaux-de-Fonds, Zürich and St. Moritz); for any other municipality, the quantity surveyor or site manager obtains them from the SIA 261 standard maps. An orange visual alert appears when the altitude exceeds 2000 m.
ULS and SLS combinations with snow and live load
Verifying a patio door lintel involves the principles of standard SIA 260. Actions are combined at the ultimate limit state for mechanical strength and at the serviceability limit state for operational deflections. The permanent load includes the self-weight of the steel beam, the upper wall, the slab and the roof.
Variable actions comprise the live load of the floors (depending on occupancy as residential, office or retail) and snow on the roof. Combination factors reduce the probability that maximum snow and maximum operational live load occur concurrently. The studio analyses the beam according to the Timoshenko model, accounting for both bending and shear deformations.
At the ultimate limit state, the studio checks bending capacity, shear force, moment-shear interaction and lateral-torsional buckling risk in accordance with standard SIA 263. The tool compares the design utilisation ratio to 100 % of the allowable design value. It indicates whether the value obtained is less than or equal to, or greater than this limit, without using any formal approval statement.
Steel lintel: section, bearings and EI30 fire protection
To span a 3,20 m opening beneath a loaded façade, hot-rolled steel sections in grades S235 or S355 are routinely selected. The studio compares the HEA, HEB, IPE and HEM series. The « Find minimum section » button scans the chosen family to identify the lightest profile whose utilisation ratio remains less than or equal to 95 %.
On the construction site, handling a heavy section introduces access challenges. The studio triggers an alert as soon as the element's mass exceeds 100 kg, suggesting the use of a beam lifter or hoist. Above 250 kg, the practical approach is to use twin sections installed through underpinning in two phases, which also simplifies supporting thick masonry walls.
Load transfer onto the existing masonry refers to standard SIA 266. Five masonry types are available with adjustable strength values. If the direct bearing stress exceeds 1,25 times the masonry strength, a C25/30 concrete padstone is dimensioned in length and height. If the padstone exceeds 600 mm or if the remaining pier is less than 40 cm wide, the model switches to a frame with steel columns. Finally, fire protection often dictates an EI30 or EI60 fire-rated encasement around the steel profile.
Watertightness and deflections: the deflection of a façade lintel
In a load-bearing façade housing external joinery, lintel deflection is a critical consideration. Excessive deflection compresses the patio door frame, jams sliding leaves, damages air- and water-tightness tapes, and causes cracking in upper renders or masonry.
For a load-bearing wall, the recommended deflection limit in the studio is set to L/500 with a strict ceiling at 10 mm. This value remains adjustable by the user. The calculation displays a wall elevation with a deflection diagram exaggerated by 50 times to visualise the impact of deformation under service loads.
The costly mistake on site consists in installing the lintel and removing props immediately without executing careful non-shrink dry-pack grouting between the top flange of the section and the existing masonry. Without this continuous, rigid contact, the wall relaxes during de-propping, causing immediate cracking in upper-floor partitions. The mason applies a non-shrink underpinning mortar and waits for full curing before releasing the temporary support props.
Liability and civil engineer for a load-bearing façade
This static studio serves as a preliminary sizing tool to prepare feasibility studies, estimate sections and compile the initial construction site bill of quantities. It runs entirely in the browser: no data is transmitted or stored on a server, and closing the tab resets all inputs. Free printing includes a watermark, and CSV exports indicate the free version.
The generated bill of quantities lists the required items: diamond wall sawing, heavy double-sided propping, demolition, concrete padstones, supply of the section, dry-pack grouting and fire-rated encasement. No pricing is included in the free version. To save your projects on a construction site, collaborate with team members and price your work items using cantonal ACIP databases, discover our enterprise solutions such as our tenders module, our Portail solution, and our comprehensive plans for the Pro version.
Preliminary sizing does not replace the statutory obligations of the Code of Obligations (CO) (Code des obligations) and standard SIA 118. Opening a load-bearing façade requires final structural calculations and execution drawings prepared and endorsed by a civil engineer prior to any sawing work.
Frequently asked questions
Can the studio be used to approve sawing a load-bearing wall without a civil engineer?
No. The studio provides preliminary sizing only to estimate sections and prepare the bill of quantities. Any modification affecting the load-bearing structure of a building requires structural calculation notes and execution drawings approved by a civil engineer before demolition works begin.
How does the calculation account for altitude when determining snow load?
The calculation applies the formula from standard SIA 261 by combining the site altitude with the local adjustment Δh. The altitude is retrieved from the official swisstopo locality list; for localities outside the eight workbook locations, Δh defaults to 0 m and the user inputs it from standard maps to determine the characteristic ground snow load s_k.
Why is the deflection of a lintel under a load-bearing wall capped at 10 mm?
Excessive deflection criteria cause damage to upper storeys, including masonry cracking and operational jamming of external joinery. The studio applies an L/500 limit capped at 10 mm to protect supported elements.
What is the purpose of checking bearing stress on the masonry?
The concentrated load transferred at the ends of the lintel can crush the existing masonry according to standard SIA 266. If the contact stress exceeds 1,25 times the allowable strength, the studio calculates the dimensions of a reinforced concrete padstone to distribute the pressure onto the pier.
What are the advantages of twin steel sections in refurbishment?
In thick walls, handling a single very heavy section proves difficult within an occupied building. Twin sections allow installation across half the wall thickness at a time, keeping the individual weight below 250 kg and reducing the extent of through-wall temporary propping.
Are my lintel calculation data stored on your servers?
In the free version, the tool runs 100 % in your web browser. No data is sent or recorded. Closing or refreshing the page clears all your inputs. The Pro version provides cloud saving directly linked to your construction site folders.
Is fire-rated encasement calculated for timber beams?
The sizing of the EI30 or EI60 fire-rated encasement built into the studio applies exclusively to steel sections. For solid timber or glulam beams, fire resistance verification is determined via residual cross-section analysis after charring.