The canton of Appenzell Inner Rhodes has one particular feature: it is divided into districts (Bezirke), not political municipalities. The cantonal building act (Baugesetz, BauG, of 2012) and its ordinance (Bauverordnung, BauV) set the framework; the districts issue their zoning plan and building regulations, where the measure of use and the distances are found. The Ausnützungsziffer (AZ, floor area ratio) is the traditional measure there; a revision of the BauV on building terms was put out for consultation, and the possible introduction of other indices, such as a Geschossflächenziffer, should be checked in the version in force.
The Geo-Scanner helps prepare this file in a canton of hills and many watercourses. The plot sheet shows number, EGRID, indicative area, ARE harmonised building zone and the status of the ÖREB cadastre (cadastre of public-law restrictions on landownership), which the canton publishes in the land information section of its website. The nearest watercourse and its distance are also shown, useful for the question of the space reserved for waters.
Worked example: sloping plot near a stream in Appenzell Inner Rhodes
A 650 m² plot in a residential zone, at about 820 m above sea level. The district regulations set an AZ of 0.50 (example value). The Geo-Scanner shows a stream 18 m from the boundary; we assume that a strip of 8.00 m by 22.00 m of the plot must stay free of building as space reserved for waters.
| Data | Source | Calculation | Result |
|---|---|---|---|
| Plot area | Geo-Scanner (indicative) | geometry | 650 m² |
| Ausnützungsziffer AZ | district regulations (example) | zone value | 0.50 |
| Max. chargeable floor area | calculation | 650 × 0.50 | 325 m² |
| Free strip near the stream | assumption to check | 22.00 × 8.00 | 176 m² |
| Remaining buildable area | calculation | 650 − 176 | 474 m² |
| Height difference on profile A-B | Geo-Scanner | 25.0 m × 12.0 % | 3.00 m |
The 650 m² area multiplied by the example AZ of 0.50 gives at most 325 m² of chargeable floor area. The 176 m² strip along the stream does not change this calculation but reduces the footprint to 474 m², before the boundary distances of the district regulations. The real width of the space reserved for waters is set by the canton: check it in the ÖREB cadastre and with the cantonal office.
The 25.0 m profile drawn down the slope gives an average of 12.0 %, i.e. 3.00 m of height difference: plan for a partly buried level or a platform, and for lorry access in winter. At 820 m, snow loads matter; they are determined by the engineer under SIA standard 261, not in the tool.
With an example AZ of 0.50, the plot allows at most 325 m² of floor area, on a footprint reduced to 474 m² by the free strip near the stream.
3 frequent pitfalls on a plot in Appenzell Inner Rhodes
Looking for municipal regulations
There is no political municipality: the zoning plan and building regulations are those of the district. Ask the district and the cantonal building office for the version in force, with any recent amendments.
Overlooking the distance to watercourses
Streams are numerous in the canton’s hills. A plot that looks free can be burdened by the space reserved for waters. The Geo-Scanner gives the distance to the nearest watercourse; the width to respect comes from the canton.
Building outside the building zone without a special permit
Scattered settlement is typical of the Appenzell landscape. If the Geo-Scanner shows no harmonised building zone at the chosen point, the plot is probably outside the zone: a project there falls under a special cantonal procedure, to be checked before any bid.
How to use it in 3 steps in Appenzell Inner Rhodes
- Locate the plot
Search for the address, the plot number with the district, or the EGRID. Check on the orthophoto that the highlighted plot is the right one. - Read the point sheet
Note the harmonised building zone, the ÖREB status, the distance to the nearest watercourse and the indicative hazard layers (landslides, rockfall, surface runoff), then open the canton’s ÖREB cadastre. - Measure the slope and keep a record
Draw a profile along the steepest slope, note altitude and height difference, then copy the report or export the CSV before contacting the district.
What the free Geo-Scanner does not do in Appenzell Inner Rhodes
The Geo-Scanner does not show the district regulations, the space reserved for waters set by the canton, groundwater protection zones, detailed cantonal hazard maps or easements. It does not calculate any AZ and does not read the content of the ÖREB restrictions: it refers you to the cantonal cadastre. It does no structural calculation and no snow load.
For the next stage, Portail chantier stores the ÖREB extract, the plans and the exchanges with the client in one file per site. ERP Art Construction handles costing, tracking and invoicing, and produces a site opening sheet. The analysis of the district regulations remains for you or a specialist to do.
Frequently asked questions
Who sets the index of use in Appenzell Inner Rhodes?
The framework is cantonal (BauG and BauV); the values per zone are found in the district’s zoning plan and building regulations. Ask the district concerned for the version in force.
Does the canton have an ÖREB cadastre?
Yes. The canton publishes its ÖREB cadastre in the land information section of its website. The Geo-Scanner shows the status for the chosen point and offers the link to the cantonal cadastre.
How can I tell whether a stream limits building?
The Geo-Scanner gives the distance to the nearest watercourse. The width of the space reserved for waters and the distances to respect are set by the canton: check them in the ÖREB cadastre and with the cantonal office.
Does the Geo-Scanner calculate the snow load?
No. It shows the altitude of the point, which is an input. Snow and wind loads are determined by the engineer under SIA standard 261.