The canton of Nidwalden governs planning and building through its Planning and Building Act (Planungs- und Baugesetz, PBG) of 21 May 2014 and its ordinance (Planungs- und Bauverordnung, PBV) of 25 November 2014. The PBG adopts the terms and measuring methods of the intercantonal agreement on harmonising building terminology (IVHB); its annex lists in particular the site coverage ratio (Überbauungsziffer), based on the countable building footprint, and the green-space ratio (Grünflächenziffer). Each municipality sets the values in its building and zoning regulations (Bau- und Zonenreglement) and its zoning plan; some amendments come into force municipality by municipality.
The Geo-Scanner locates the plot by address, number and municipality, EGRID or coordinates. Its result card shows the area calculated from the geometry, the status of the Nidwalden ÖREB cadastre, which is kept by GIS Daten AG, with the link to the extract when it is published, the harmonised building zone, the nearest watercourse, the surface run-off hazard and the avalanche and rockfall hazard indications. Nidwalden was the first canton to include ÖREB restrictions in electronic land register enquiries through Terravis.
Worked example: coverage and green space on a Nidwalden plot
A 700 m² plot in a residential zone, on a slope. The municipal regulations set, as example values, a site coverage ratio of 0.28 and a green-space ratio of 0.40. The slope profile is drawn over 60 m between the access road and the top of the plot.
| Item | Calculation | Value |
|---|---|---|
| Plot area | Geo-Scanner, indicative | 700 m² |
| Countable building footprint (0.28) | 700 × 0.28 | 196 m² |
| Minimum green space (0.40) | 700 × 0.40 | 280 m² |
| Remainder for access, parking and terraces | 700 − 196 − 280 | 224 m² |
| Average ground slope | 9 m over 60 m | 15 % (8.5°) |
The example coverage ratio allows 700 × 0.28 = 196 m² of countable building footprint. The green-space ratio requires 700 × 0.40 = 280 m² of green areas. That leaves 700 − 196 − 280 = 224 m² for the access, parking spaces, terraces and walls: on a slope, ramps and retaining structures use up this reserve quickly.
The 60 m profile shows a 9 m difference in height: 9 ÷ 60 = 15 %, about 8.5°, with an altitude of 450 m at the bottom of the plot. A 15 % access ramp has to be discussed with the municipality and the fire service; earthworks and retaining walls are costed with the engineer. The official area and the actual ratio values are confirmed with the extract and the municipal regulations.
With the example values, the plot allows 196 m² of footprint and requires 280 m² of green space, leaving only 224 m² for access on ground with a 15 % slope.
3 common pitfalls before buying or costing a plot in Nidwalden
Forgetting the green-space ratio
Coverage alone is not enough: the green-space ratio reduces the room left for access and parking. On a small sloping plot, it is often this ratio that blocks the project.
Applying a municipal rule that is not yet in force
Amendments to align with the IVHB come into force municipality by municipality. Check which version of the building and zoning regulations actually applies to the plot.
Underestimating the lake and slope hazards
Floods, debris flows, avalanches and rockfall affect part of the canton. The Geo-Scanner layers are indicative; the hazard zones of the zoning plan and the ÖREB extract set the conditions for building.
How to use it in 3 steps for a plot in the canton of Nidwalden
- Locate the plot and read its card
Search for the plot by address, number with the municipality, or EGRID. Note the indicative area, the harmonised zone and the status of the ÖREB cadastre. - Read the hazards and open the extract
Switch on the run-off, avalanche and rockfall layers with their legend, then open the ÖREB extract for the plot when it is published. - Draw the profile and export
Draw a profile between the road and the top of the plot, note the altitude and slope, then copy the report or export the CSV for your file.
What the Geo-Scanner does not do for a Nidwalden plot
The Geo-Scanner does not read the content of ÖREB restrictions and does not display municipal hazard zones, groundwater protection zones, the noise sensitivity level or easements. It calculates neither the coverage ratio nor the green-space ratio: that calculation is done by hand. Searches go to the public swisstopo API and nothing is stored.
For the next stage of the project, Portail chantier brings the file together (extracts, plans, permits) and shares it with the client. ERP Art Construction costs the bids, tracks the site and the invoicing, and opens each site with its own sheet.
Frequently asked questions
Which law governs building in the canton of Nidwalden?
The Planning and Building Act (PBG) of 21 May 2014 and its ordinance (PBV), supplemented by each municipality's building and zoning regulations and zoning plan.
Does Nidwalden apply the IVHB terminology?
Yes, the PBG adopts the IVHB terms and measuring methods, including the site coverage ratio and the green-space ratio. The values are set by the municipalities.
Who keeps the ÖREB cadastre in Nidwalden?
The ÖREB cadastre is kept by GIS Daten AG. The Geo-Scanner shows its status and offers the link to the plot extract when it is published.
Is the Geo-Scanner enough to judge an access ramp?
It gives the average slope along a profile, for guidance only. Whether a ramp is feasible is confirmed with a surveyor's plan, the municipality and the engineer.