In Thurgau, the Planning and Building Act (Planungs- und Baugesetz, PBG) delegates the details to the cantonal government, which set them out in the Planning and Building Ordinance (PBV). The PBV applies the terms and measuring methods of the intercantonal agreement harmonising building terminology (IVHB in German, AIHC in French): they are binding on municipalities and cannot be changed in municipal regulations. The land-use measures are the floor area ratio (Geschossflächenziffer, GFZ), the building volume ratio (Baumassenziffer, BMZ) and the site coverage ratio (Überbauungsziffer, ÜZ). A useful feature: the PBV contains a conversion table from the old plot ratio (AZ) to the GFZ, and the new terms only apply once the municipality's building regulations and zoning plan have been adapted.
The Art Construction Geo-Scanner gives the first card for the plot: search by address, number and municipality, EGRID or coordinates, then number, EGRID, indicative area, harmonised ARE building zone and cantonal PLR cadastre status with its link. The Thurgau PLR cadastre and the cantonal ThurGIS geoportal then complete the reading, with the zoning plan and the municipal regulations.
Worked example: from the old plot ratio to the floor area ratio in Thurgau
A 700 m² plot in a residential zone, in a Thurgau municipality that has just adapted its regulations to the PBV. The old regulations set a plot ratio of 0.50; the PBV conversion table gives a corresponding GFZ of 0.80. Values to be checked in the version of the PBV and the municipal regulations in force.
| Item | Value | Calculation | Result |
|---|---|---|---|
| Plot area (Geo-Scanner, indicative) | 700 m² | plot geometry | 700 m² |
| Old plot ratio AZ | 0.50 | 700 × 0.50 | 350 m² |
| Floor area ratio GFZ (after conversion) | 0.80 | 700 × 0.80 | 560 m² |
| Site coverage ratio ÜZ (example) | 0.35 | 700 × 0.35 | 245 m² |
| Ground slope (Geo-Scanner profile) | 1.5 m over 50.0 m | 1.5 ÷ 50.0 | 3 % |
With the old plot ratio of 0.50, the 700 m² plot gave 350 m² of usable floor area. After adaptation, the GFZ of 0.80 gives 700 × 0.80 = 560 m². The difference does not mean you can build 60 % more: the GFZ counts areas the AZ did not count, such as the external walls. The example site coverage ratio of 0.35 limits the footprint to 245 m².
The profile gives a 1.5 m difference in height over 50.0 m, or 3 %: almost flat ground. In the Thur plains and along the lake, the Geo-Scanner flags the groundwater body; the groundwater protection zone is then read in the PLR cadastre before planning a basement.
On this example plot, the GFZ of 0.80 allows at most 560 m² of floor area and 245 m² of footprint, figures that cannot be compared directly with the 350 m² of the old AZ.
3 common mistakes before buying a plot in Thurgau
Applying the GFZ before the municipal plan has been adapted
The PBV terms only apply once the municipality's regulations and zoning plan have been adapted; until then, the old measuring rules remain valid. Ask the municipality which regulations apply to the plot.
Comparing an AZ and a GFZ as if they were the same
The two ratios do not measure the same areas. A seller quoting a buildable area calculated with the old AZ does not get the same result as an architect working with the GFZ: redo the calculation with the definition in force.
Neglecting groundwater and watercourses
The Thur, its tributaries and the lake impose reserved water areas and protection zones. The Geo-Scanner gives the distance to the nearest watercourse; the distances to respect are set by the canton or the municipality.
How to use it in 3 steps for a plot in Thurgau
- Locate the plot
Enter the address, the number and municipality, the EGRID or LV95 coordinates. Check the outline on the orthophoto and the cantonal cadastral map. - Read the PLR status and open ThurGIS
Note the indicative area, the harmonised zone, the groundwater body and the distance to the watercourse. Open the cantonal PLR cadastre from the card, then ThurGIS for the municipal zoning plan. - Measure the slope and calculate the ratio separately
Draw a profile between two points of the plot. Export the CSV, then calculate the GFZ, BMZ or ÜZ with the values from the municipal regulations.
What the free Geo-Scanner does not do in Thurgau
The Geo-Scanner does not read the content of PLR restrictions, does not know whether the municipality has adapted its regulations to the PBV and converts no ratio. It does not display groundwater protection zones, the cantonal hazard map, the noise sensitivity level, ISOS or easements. No structural calculation, no snow load.
Portail chantier brings the project file together and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME, with a site opening sheet. Neither of these tools replaces the opinion of the municipality.
Frequently asked questions
Which ratios apply in Thurgau?
The PBV applies the IVHB terms: floor area ratio (GFZ), building volume ratio (BMZ) and site coverage ratio (ÜZ). The municipality sets the values in its building regulations.
How do I convert an old plot ratio into a GFZ?
The PBV contains a conversion table; for example an AZ of 0.50 corresponds to a GFZ of 0.80. Check the table in the version of the ordinance in force.
Where can I consult the Thurgau PLR cadastre?
In the canton of Thurgau's PLR cadastre, which the Geo-Scanner opens from the plot card, and on the ThurGIS geoportal. The official extract is binding.
Does the Geo-Scanner calculate the buildable area?
No. It gives the indicative area, the harmonised zone, the altitude and the slope. The ratio calculation is done separately, with the value and definition from the municipal regulations.