Plot feasibility in Basel-City: ÖREB cadastre, BPG and numbered zones

In Basel-City, the cantonal act itself sets the zones and their number of storeys: locate the plot, open its ÖREB extract and read what its zone allows.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

Basel-City is a city canton: the building and planning act (Bau- und Planungsgesetz, BPG, of 17 November 1999, SG 730.100) itself sets most zone rules. Building zones are numbered and the zone number corresponds to the number of full above-ground storeys allowed. The BPG also provides an Ausnützungsziffer (AZ, floor area ratio) for the small zones, for example 0.7 in zone 2 and 0.6 in zone 2a according to the version consulted, to be checked in the official collection of laws in force. According to the cantonal working aid, a comparison project often gives a higher value than this AZ in practice.

The cantonal ÖREB cadastre (public-law restrictions on landownership) is free; for a permit application, the canton asks for the ÖREB extract with its annex of additional information for building applications, downloadable as a PDF from the portal. The MapBS geoportal shows the zoning plan. The Geo-Scanner prepares this step: plot, EGRID, indicative area, harmonised zone and ÖREB status, plus modelled exposure to road and rail noise, central in a dense urban setting.

Worked example: permitted floor area in zone 2 in Basel-City

A 380 m² plot in zone 2, at about 270 m above sea level, near a railway line. We apply the 0.7 Ausnützungsziffer of zone 2 read in the BPG (version to be checked) and the two full storeys corresponding to the zone.

Zone 2: floor area and storeys (values to be checked)
DataSourceCalculationResult
Plot areaGeo-Scanner (indicative)geometry380 m²
Ausnützungsziffer zone 2BPG (to be checked)zone value0.7
Max. gross floor areacalculation380 × 0.7266 m²
Full above-ground storeysBPG, zone numberzone 22
Average area per storeycalculation266 ÷ 2133 m²
Height difference on profile A-BGeo-Scanner20.0 m × 1.0 %0.20 m

The 380 m² plot multiplied by the 0.7 AZ gives 266 m² of gross floor area. Spread over the two full storeys of zone 2, that is 133 m² per storey on average. A comparison project drawn up under the BPG rules may lead to another value: the cantonal building office decides.

The ground is almost flat: 1.0 % over 20.0 m, i.e. 0.20 m. The main constraint lies elsewhere: the Geo-Scanner shows high modelled exposure to night-time rail noise. The sensitivity level of the zone and the measures required are found in the zoning plan and the ÖREB extract, not in the noise layer.

In zone 2, the 380 m² plot allows about 266 m² of floor area over two full storeys, subject to the BPG version in force and any comparison project.

3 frequent pitfalls on a plot in Basel-City

Looking for the index in municipal regulations

In a city canton, most zone rules are in the BPG itself and in the cantonal zoning plan. For the canton’s municipalities outside the city, check whether local rules apply on top.

Filing an application without the ÖREB extract annex

For a permit application, the canton asks for the ÖREB extract with its annex of additional information. Prepare it at the analysis stage: it avoids a round trip with the building office.

Overlooking noise and urban heritage

In a dense setting, road and rail noise and the protection of built heritage weigh on the project. The Geo-Scanner shows noise exposure; heritage protection and the ISOS are checked with the canton.

How to use it in 3 steps in Basel-City

  1. Find the plot
    Enter the address or the EGRID; in the city, the address is usually enough. Check the highlighted plot on the cadastral map.
  2. Read zone, ÖREB and noise
    Note the harmonised zone and the ÖREB status, display the day and night road and rail noise layers, then open the ÖREB cadastre for the extract and its annex.
  3. Export for the file
    Copy the report or export the CSV with the LV95 coordinates and the altitude, then compare the zone with the MapBS zoning plan and the BPG.

Open the free studio →

What the free Geo-Scanner does not do in Basel-City

The Geo-Scanner does not show the detailed cantonal zoning plan, building lines, heritage protection, the noise sensitivity level or easements. It does not calculate the Ausnützungsziffer and does not draw up any comparison project. It shows the status of the ÖREB cadastre without reading its content.

Portail chantier keeps the ÖREB extract, its annex and the plans in a file shared with the client. ERP Art Construction costs the work, tracks the site and the invoicing, and provides a site opening sheet. Neither replaces the opinion of the cantonal building office.

Frequently asked questions

What does a zone number mean in Basel-City?

Under the BPG, the zone number corresponds to the number of full above-ground storeys allowed: zone 2 allows two full storeys, zone 3 three, and so on, with specific rules for roof spaces and top-floor attics.

Does the Ausnützungsziffer apply everywhere?

The BPG provides it for certain zones, such as zones 2 and 2a. A comparison project may give another value. Check the version of the act in force and ask the building office for its opinion.

Where can I get the Basel-City ÖREB extract?

On the canton’s ÖREB portal, free of charge. For a permit application, add the annex of additional information offered before downloading the PDF.

Does the Geo-Scanner show the Basel-City zones?

It shows the building zone harmonised at Swiss level by the ARE, which is indicative. The cantonal zoning plan, available in MapBS, is binding.