In Solothurn, planning and building are governed by the Planning and Building Act (Planungs- und Baugesetz, PBG) and the cantonal building ordinance (Kantonale Bauverordnung, KBV). The canton joined the intercantonal agreement harmonising building terminology (IVHB in German, AIHC in French) and adapted the KBV accordingly. The revision of the KBV replaced the former plot ratio (Ausnützungsziffer) with the floor area ratio (Geschossflächenziffer, GFZ); the site coverage ratio (Überbauungsziffer, ÜZ) and the green-space ratio complete the rules. The values are in the municipality's zoning regulations (Zonenreglement) and zoning plan.
The Art Construction Geo-Scanner gives the first card for the plot: search by address, number and municipality, EGRID or coordinates, then number, EGRID, indicative area, harmonised ARE building zone and PLR cadastre status with its link. Solothurn publishes its restrictions in the canton's Web GIS Client, where each PLR topic can be displayed and a PDF extract for the plot can be downloaded; the Geo-Scanner links to it when the canton publishes it.
Worked example: analysing a plot with a floor area ratio in Solothurn
A 750 m² plot in a two-storey residential zone, at the foot of the Solothurn Jura. The values are examples: the actual value and the definition of the relevant plot area are in the municipality's zoning regulations and in the KBV.
| Item | Value | Calculation | Result |
|---|---|---|---|
| Plot area (Geo-Scanner, indicative) | 750 m² | plot geometry | 750 m² |
| Floor area ratio GFZ (example) | 0.55 | 750 × 0.55 | 412.5 m² |
| Site coverage ratio ÜZ (example) | 0.30 | 750 × 0.30 | 225 m² |
| Green-space ratio (example) | 0.40 | 750 × 0.40 | 300 m² |
| Ground slope (Geo-Scanner profile) | 2.5 m over 50.0 m | 2.5 ÷ 50.0 | 5 % |
With 750 m² of indicative area, an example floor area ratio of 0.55 gives at most 750 × 0.55 = 412.5 m² of floor area. The example site coverage ratio of 0.30 limits the footprint to 225 m², and the green-space ratio of 0.40 reserves 300 m² of planted areas. Two storeys of 206 m² (412 m²) meet all three example ratios.
The profile gives a 2.5 m difference in height over 50.0 m, or 5 %: gently sloping ground. Before the bid, the PDF extract from the cantonal Web GIS Client lists the restrictions in force on the plot, for example a groundwater protection zone or a building line, which the calculation must take into account.
On this example plot, you can aim for at most 412.5 m² of floor area, 225 m² of footprint and 300 m² of green space: to be confirmed according to the zoning regulations and the PLR extract.
3 common mistakes before buying a plot in Solothurn
Calculating with the old plot ratio
The KBV replaced the Ausnützungsziffer with the Geschossflächenziffer, whose definition is different. An old estimate based on the AZ cannot be carried over as it is: check in the zoning regulations whether the municipality has already adapted its values, and from what date.
Relying on the card without downloading the PDF extract
The canton's Web GIS Client lets you download the extract of all the restrictions on the plot. It is this document that is binding for a permit or a loan, not a screenshot or the indicative card in the Geo-Scanner.
Forgetting easements in the land register
Rights of way, contractual building restrictions and registered pipelines do not appear in the PLR cadastre. Ask for the land register extract before approving a building position or a site access.
How to use it in 3 steps for a plot in Solothurn
- Locate the plot
Enter the address, the number and municipality, the EGRID or coordinates. Check the outline on the orthophoto and the cantonal cadastral map. - Read the card, then the PLR extract
Note the indicative area, the harmonised building zone and the PLR status. Follow the link to the cantonal cadastre and download the PDF extract for the plot. - Measure the slope and calculate separately
Draw a profile between two points to get the difference in height and the average slope. Export the CSV, then calculate the ratios with the values from the municipal zoning regulations.
What the free Geo-Scanner does not do in Solothurn
The Geo-Scanner does not read the content of PLR restrictions: it opens the canton's cadastre and extract. It does not display groundwater protection zones, the cantonal hazard map, the noise sensitivity level, ISOS or easements. It calculates no ratio, no snow load and no structural sizing.
Portail chantier brings the project file together (PLR extract, plans, permits) and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME. Neither replaces the opinion of the municipality.
Frequently asked questions
Which land-use ratio applies in Solothurn?
The KBV provides for the floor area ratio (GFZ), which replaced the former plot ratio, as well as the site coverage ratio and the green-space ratio. The values are in the municipal zoning regulations.
Where can I get the PLR extract for a Solothurn plot?
In the canton of Solothurn's Web GIS Client, which displays the PLR topics and lets you download a PDF extract for the plot. The Geo-Scanner links to it from the card.
Does Solothurn apply the IVHB (AIHC)?
Yes, the canton joined the agreement and adapted the KBV to its definitions. Municipalities apply the new terms as they revise their plans: check the status of the municipality concerned.
Does the Geo-Scanner calculate the permitted floor area?
No. It provides the indicative area, the harmonised zone, the altitude and the slope. The ratio calculation is done separately, with the value and definition from the zoning regulations.