Plot feasibility in Ticino: PLR cadastre (RDPP), LST, utilisation ratio and coverage ratio

Before buying land in Ticino or submitting a bid for earthworks, locate the plot, its federal constraints and the piano regolatore ratios to ask the municipality for.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Ticino, planning law rests on the Spatial Development Act (Legge sullo sviluppo territoriale, LST) of 21 June 2011, in force since 1 January 2012, and its implementing regulations (RLst). The building rules themselves are in the cantonal building act (Legge edilizia, LE) and its regulations (RLE). In each municipality, the piano regolatore (local land-use plan) and its implementing rules (NAPR) set the zone, distances, heights and ratios: that is where you find the utilisation ratio (indice di sfruttamento, IS) and the coverage ratio (indice di occupazione, IO), with the definition of the reference area.

The Art Construction Geo-Scanner prepares this work with nothing to install. You search for the plot by address, by number and municipality, by EGRID or by LV95 coordinates; the card shows the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the cantonal PLR cadastre (RDPP), with the link to the Ticino cadastre and, when published, to the PDF extract for the plot. The studio also gives the altitude, a slope profile and the federal hazard and noise layers. The cantonal Ticino geoportal remains the reference for the piano regolatore and the cantonal hazard maps.

Worked example: analysing a plot in a residential zone in Ticino

An undeveloped 900 m² plot in a semi-intensive residential zone, sloping towards the lake, in a Ticino municipality. The ratios below are example values: the actual value and the reference area are in the municipality's NAPR.

Reading the plot and calculating the permitted areas (example values)
ItemValueCalculation or source
Plot area900 m²Geometry read in the Geo-Scanner, indicative
Utilisation ratio IS (example)0.6Example value from the municipal NAPR
Maximum gross usable area (SUL)540 m²900 × 0.6
Coverage ratio IO (example)30 %Example value from the municipal NAPR
Maximum built area270 m²900 × 0.30
Slope profile over 40 m14 %Difference in height of 5.60 m ÷ 40 m

The 900 m² area comes from the official survey geometry: it is used to prepare the calculation, but the land register extract is binding. With an example IS of 0.6, the permitted gross usable area is 900 × 0.6 = 540 m². With an example IO of 30 %, the building footprint is limited to 900 × 0.30 = 270 m². The project must respect both limits at the same time: two storeys of 270 m² give exactly 540 m².

The profile drawn in the Geo-Scanner between the bottom and the top of the land shows a 5.60 m difference in height over 40 m, an average slope of 14 %. For the contractor, this means retaining walls, a site access to be studied and spoil to be removed. For the buyer, it is a reminder that the definition of the reference ground level and of heights is read in the NAPR: sloping ground changes the number of storeys actually possible.

With the example ratios, the 900 m² plot allows at most 540 m² of gross usable area and 270 m² of footprint, on ground with a 14 % slope.

3 common pitfalls before buying or costing a plot in Ticino

Confusing the harmonised zone with the piano regolatore

The zone shown by the Geo-Scanner comes from the harmonised ARE data: it tells you whether the point is in a building zone, not which municipal zone applies or which ratios. Only the piano regolatore and its NAPR set the IS, the IO, the distances and the heights.

Forgetting the cantonal natural hazards

The federal avalanche, rockfall and run-off layers are indicative. The cantonal hazard maps, which determine the building permit and sometimes costly protection measures, are consulted on the cantonal geoportal or with the municipality.

Ignoring shorelines and nuisances

Near a lake or a watercourse, the reserved water area reduces the buildable area; along roads and railways, the noise sensitivity level set by the municipal plan may require measures. The studio shows the distance to the watercourse and the modelled noise, not these rules.

How to use it in 3 steps: analysing a Ticino plot with the Geo-Scanner

  1. Find the plot
    Enter the address, the plot number with the name of the municipality, the EGRID or the LV95 coordinates. Choose the right result: the map centres and the card shows the number, the EGRID and the indicative area.
  2. Read the federal constraints
    Open the PLR, cadastre and zone section: status of the cantonal PLR cadastre (RDPP), link to the PDF extract when it exists, harmonised building zone. Then display the hazard, noise and water layers, and draw a slope profile between two points.
  3. Complete with the municipality
    Copy the report or export the CSV, then ask the municipality for the piano regolatore and the NAPR: zone, IS, IO, distances, heights. Redo the calculation with the real values before any purchase decision or bid.

Open the free studio →

What the free Geo-Scanner does not do for a plot in Ticino

The studio does not read the content of the restrictions recorded in the PLR cadastre (RDPP): it refers you to the cantonal cadastre and the PDF extract. It does not display groundwater protection zones, detailed cantonal hazard maps, the noise sensitivity level, ISOS or easements in the land register. It calculates no ratio: the calculation above is done by hand. It carries out no structural calculation or sizing, and gives no prices.

Portail chantier then brings the project file together (extracts, plans, permits) and shares it with the client. The Art Construction ERP is used to cost the bid, track the site and the invoicing, and open the site with its sheet. Neither calculates ratios or replaces the opinion of the municipality or a professional.

Frequently asked questions

Which law applies to building in Ticino?

Planning falls under the Spatial Development Act (LST) and its regulations (RLst); building rules fall under the cantonal building act (LE) and its regulations (RLE). The detailed rules for each site are in the municipality's piano regolatore and NAPR.

What do IS and IO mean in a piano regolatore?

The utilisation ratio (IS) limits the gross usable area in relation to the plot area; the coverage ratio (IO) limits the footprint. The values and the way areas are counted are set by the municipal rules: check them before any calculation.

Does Ticino apply the intercantonal agreement on building terminology?

The canton's position on this agreement (AIHC, CIAE in Italian) is to be checked in the cantonal law in force. In practice, it is the definitions in the municipality's piano regolatore and NAPR that apply to your calculation.

Does the Geo-Scanner give the official PLR extract?

No. It shows whether the cantonal PLR cadastre (RDPP) has been introduced and offers the link to the plot's PDF extract when the canton publishes it. The official extract is requested from the canton and is binding; the studio helps you prepare the question.