The canton of Fribourg governs planning through the spatial planning and building act (LATeC, from 2008) and its implementing regulations (ReLATeC). With the LATeC, the canton replaced the former utilisation coefficient with the gross land-use index (IBUS, indice brut d’utilisation du sol), which relates the relevant floor area to the relevant land area, and uses the site coverage index (IOS, indice d’occupation du sol) for the footprint: two notions of the harmonised IVHB (AIHC) terminology. Each municipality sets the values per zone in its local land-use plan (PAL) and its municipal planning regulations (RCU), sometimes completed by a detailed development plan (PAD).
The LATeC also provides for the transfer of indices: owners can agree to transfer part of the IBUS or IOS to a neighbouring plot in the same zone, with entry in the land register. The Geo-Scanner prepares the analysis: plot, EGRID, indicative area, harmonised zone and status of the Fribourg PLR cadastre (RDPPF, public-law restrictions on landownership), kept by the cantonal geoinformation service and available from the canton’s map portal, with the link to the PDF extract when it is published.
Worked example: IBUS and IOS of a plot in Fribourg
A 1,000 m² plot in a low-density residential zone, at about 650 m above sea level. The municipality’s RCU sets an IBUS of 0.80 and an IOS of 0.35 (example values). The project: a 15.00 m by 18.00 m footprint, two full storeys and 120 m² of floor area in the roof space.
| Data | Source | Calculation | Result |
|---|---|---|---|
| Relevant land area | Geo-Scanner (indicative) | geometry | 1,000 m² |
| IBUS | RCU (example) | zone value | 0.80 |
| Max. floor area | calculation | 1,000 × 0.80 | 800 m² |
| Max. footprint (IOS 0.35) | calculation | 1,000 × 0.35 | 350 m² |
| Project footprint | plans | 15.00 × 18.00 | 270 m² |
| Project floor area | plans | 270 × 2 + 120 | 660 m² |
| Floor area reserve | calculation | 800 − 660 | 140 m² |
The example IBUS of 0.80 on 1,000 m² allows 800 m² of floor area; the IOS of 0.35 limits the footprint to 350 m². The project covers 270 m² of ground and totals 660 m² of floor area: both indices are met, with a 140 m² floor area reserve and an 80 m² footprint reserve.
The relevant floor area is counted according to the LATeC and ReLATeC rules, including certain secondary usable areas: the share of the roof space that enters the IBUS is checked in these texts and in the RCU. If a transfer of indices has been entered in the land register, it changes the calculation: ask for the land register extract before concluding.
With an example IBUS of 0.80 and IOS of 0.35, the 1,000 m² plot allows 800 m² of floor area and a 350 m² footprint; the project uses 660 m² and 270 m².
3 frequent pitfalls on a plot in the canton of Fribourg
Checking only the IBUS
A project can meet the IBUS and exceed the IOS, or the other way round. Calculate both, then the boundary distances and the height set by the RCU.
Ignoring a registered transfer of indices
A former owner may have transferred part of the IBUS or IOS to a neighbouring plot. This transfer appears in the land register, not on the zone map or in the Geo-Scanner: the index available may be lower than the RCU value.
Forgetting a mandatory PAD
Some sectors of the PAL require a detailed development plan before any building. The RCU and the PLR extract say so; without an approved PAD, a permit can take a long time.
How to use it in 3 steps in the canton of Fribourg
- Locate the plot
Enter the address, the number and the municipality or the EGRID. Check the highlighted plot on the orthophoto and note the indicative area. - Read the PLR extract and the RCU
Follow the link to the Fribourg PLR cadastre for the extract, then open the municipality’s PAL and RCU for the IBUS, the IOS and any PAD. - Complete the terrain data and export
Draw a slope profile, display the water and indicative hazard layers, then export the CSV or copy the report for your file.
What the free Geo-Scanner does not do in the canton of Fribourg
The Geo-Scanner calculates neither the IBUS nor the IOS, does not read the RCU and does not see transfers of indices in the land register. It does not show PADs, groundwater protection zones, the cantonal hazard map, the noise sensitivity level or easements. It shows the status of the PLR cadastre without reading its content, and does no structural calculation.
Portail chantier gathers the PLR extract, the RCU, the plans and the permit in a file shared with the client. ERP Art Construction costs the work, tracks the site and the invoicing, and prints a site opening sheet. Checking the indices remains to be done on the plans.
Frequently asked questions
What is the difference between the IBUS and the IOS?
The IBUS limits the relevant floor area in relation to the land area; the IOS limits the ground area covered by buildings. The municipality’s RCU sets both values per zone.
What is a transfer of indices?
The LATeC allows owners to transfer part of the IBUS or IOS between neighbouring plots in the same zone. The transfer is entered in the land register: ask for the extract before buying.
Where can I find the Fribourg PLR cadastre?
It is published by the cantonal geoinformation service and available from the canton’s map portal. The Geo-Scanner offers the link to the cantonal cadastre for the chosen plot.
Does the Geo-Scanner say whether a PAD is required?
No. The obligation to draw up a detailed development plan is found in the PAL, the RCU and the plot’s PLR extract.