Free software · 100% in your browser · no data sent

Plot feasibility in Basel-Country: ÖREB, RBG, RBV and Zonenreglement

In Basel-Country, the municipality’s Zonenreglement Siedlung sets the measure of use: locate the plot, open its ÖREB extract and quantify the permitted footprint.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

The canton of Basel-Country governs planning through the spatial planning and building act (Raumplanungs- und Baugesetz, RBG, SGS 400) and its ordinance (RBV, SGS 400.11), both from 1998. The canton joined the intercantonal agreement harmonising building terms (IVHB, in French AIHC) in 2009 and transferred its definitions mainly into the RBV, following a revision adopted by the cantonal parliament. Each municipality issues a zoning plan and zone regulations for the built-up area (Zonenplan and Zonenreglement Siedlung), where the measure of use per zone is found.

The canton’s ÖREB cadastre (public-law restrictions on landownership), kept by the cantonal geoinformation office, opens from the GeoView BL geoportal through a dedicated client; for each restriction it brings together the plan, the regulations and the legal basis. The Geo-Scanner prepares this reading: plot, EGRID, indicative area, ARE harmonised building zone, ÖREB status with a link to the cadastre, then noise, water and indicative hazard layers.

Worked example: permitted site coverage in Basel-Country

A 600 m² plot in a two-storey residential zone, at about 450 m above sea level, along a cantonal road. We assume that the Zonenreglement Siedlung limits the footprint through a Bebauungsziffer of 30 % (example value, to be checked in the municipality’s regulations). The project has a footprint of 12.00 m by 13.50 m.

Site coverage and slope of the plot (example values)
DataSourceCalculationResult
Plot areaGeo-Scanner (indicative)geometry600 m²
BebauungszifferZonenreglement (example)zone value30 %
Permitted footprintcalculation600 × 0.30180 m²
Project footprintplans12.00 × 13.50162 m²
Footprint reservecalculation180 − 16218 m²
Height difference on profile A-BGeo-Scanner35.0 m × 8.0 %2.80 m

With 600 m² and an example Bebauungsziffer of 30 %, the permitted footprint is 180 m². The 12.00 × 13.50 m project covers 162 m²: 18 m² remain, just enough for a carport or a shed. The regulations may also set a number of storeys, heights and a second measure of use: read all the values for the zone.

The 35.0 m profile gives an average slope of 8.0 %, i.e. 2.80 m of height difference, to be built into the access from the road. A cantonal building line (Baulinie) may run along the road: it appears in the ÖREB cadastre and reduces the footprint actually available, regardless of the index.

With an example Bebauungsziffer of 30 %, the 600 m² plot allows a 180 m² footprint; the 162 m² project leaves an 18 m² reserve, before the effect of building lines.

3 frequent pitfalls on a plot in Basel-Country

Reading the zoning plan without the regulations

The Zonenplan says which zone applies; the Zonenreglement Siedlung says what may be built in it. The Basel-Country ÖREB extract links the two: open the linked regulations, not only the map.

Ignoring building lines along cantonal roads

The canton keeps its own building lines along cantonal roads. They are not on the Geo-Scanner zone map but in the ÖREB cadastre; they can make a strip along the street frontage unusable.

Underestimating natural hazards on the Jura slopes

Landslides, rockfall and surface runoff affect part of the canton. The Geo-Scanner’s federal layers are indicative: the cantonal hazard map is binding for siting and building requirements.

How to use it in 3 steps in Basel-Country

  1. Locate the plot
    Enter the address, the number and the municipality or the EGRID in the Geo-Scanner, then check the plot on the orthophoto and the cadastral map.
  2. Go to the ÖREB cadastre
    Note the harmonised zone and the ÖREB status, then open the Basel-Country cadastre through the link: download the extract and the municipality’s Zonenreglement Siedlung.
  3. Measure and document
    Draw a profile from the road, display the noise and hazard layers, then export the CSV or copy the report for your analysis file.

Open the free studio →

What the free Geo-Scanner does not do in Basel-Country

The Geo-Scanner does not calculate any measure of use and does not read the Zonenreglement. It does not show building lines, the cantonal hazard map, groundwater protection zones, the noise sensitivity level or easements. It shows the status of the ÖREB cadastre without reading its content, and does no structural calculation.

Portail chantier stores the ÖREB extract, the regulations and the plans in a file per site shared with the client. ERP Art Construction is used for costing, tracking and invoicing in your SME, with a site opening sheet. The legal reading of the regulations remains to be done.

Frequently asked questions

Which laws apply in Basel-Country?

The cantonal RBG act and its RBV ordinance, which take over the IVHB definitions, then the municipality’s zoning plan and Zonenreglement Siedlung.

How do I open the Basel-Country ÖREB cadastre?

From the GeoView BL geoportal, a button switches to the canton’s ÖREB client. The Geo-Scanner shows the cadastre status for the chosen point and offers the link to the cantonal cadastre.

Is the Bebauungsziffer the only limit?

No. The municipality’s regulations may also set the number of storeys, heights, distances and other measures. Building lines and easements come on top of these rules.

Does the Geo-Scanner show the canton’s hazard map?

No. It shows indicative federal layers (surface runoff, rockfall, avalanches). The cantonal hazard map is consulted in the canton’s geoportal.