Free software · 100% in your browser · no data sent

Plot feasibility in Valais: PLR cadastre (RDPPF), LC, OC, IBUS and second homes

Between the Rhône plain and the mountain resorts, a plot in Valais is judged on three questions: the municipal ratio, the natural hazards and the second homes rules.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Valais, building is governed by the cantonal Building Act (loi sur les constructions, LC) of 15 December 2016 and the Building Ordinance (ordonnance sur les constructions, OC), in force since 1 January 2018 and amended since: check the version in force in the cantonal collection of laws. With this reform, the canton joined the intercantonal agreement harmonising building terminology (AIHC). The gross land-use ratio (indice brut d'utilisation du sol, IBUS) is defined there as the sum of the floor areas divided by the relevant land area. The specific values are in the municipal building and zoning regulations (RCCZ) and the zoning plan (PAZ).

The Art Construction Geo-Scanner prepares this reading in the browser. You find the plot by address, number and municipality, EGRID or coordinates; the card shows the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the Valais PLR cadastre (RDPPF), with the link to the cantonal cadastre and to the PDF extract when it is published. In Valais, the altitude, the slope profile and the federal avalanche, rockfall and run-off layers are often decisive. The canton of Valais geoportal remains the reference for the PAZ and the cantonal hazard maps.

Worked example: plot in a mixed zone of a mountain municipality in Valais

An 800 m² plot in a mixed residential zone, on a slope above the plain, at an altitude of 1,250 m. The IBUS is an example value: the actual value and any possible increases are in the RCCZ and the OC.

Reading the plot and calculating the permitted floor area (example values)
ItemValueCalculation or source
Relevant land area800 m²Geometry read in the Geo-Scanner, indicative
IBUS (example)0.5Example value from the RCCZ
Maximum floor area400 m²800 × 0.5
Planned dwellings4Example brief of 100 m² each
Altitude of the point1,250 m a.s.l.Read in the Geo-Scanner
Slope profile over 75 m18 %Difference in height of 13.50 m ÷ 75 m

With an example IBUS of 0.5, the permitted sum of floor areas is 800 × 0.5 = 400 m², or four dwellings of 100 m² in this example brief. The OC provides for increases in certain cases; they cannot be assumed and are checked with the municipality. In a municipality where the share of second homes exceeds 20 %, the federal Second Homes Act limits new dwellings to main residences or specific categories: the municipality's status therefore changes the value of the project.

The profile drawn in the studio gives a 13.50 m difference in height over 75 m, an 18 % slope. At 1,250 m, snow and frost shorten the building season; snow loads are determined by the engineer under the SIA 261 standard, and the studio does not calculate them. The indicative avalanche and rockfall layers are read with their legend; the cantonal hazard map decides.

With the example IBUS, the 800 m² plot allows 400 m² of floor area, on an 18 % slope at 1,250 m, subject to the municipality's second homes rules.

3 common pitfalls before buying or costing a plot in Valais

Forgetting the second homes rules

In municipalities with more than 20 % second homes, a new dwelling cannot, with some exceptions, be sold as a second home. Ask for the municipality's status and the conditions recorded in the land register before buying or building a scheme.

Underestimating natural hazards

Floods, debris flows, landslides, avalanches: the cantonal hazard maps can make a plot unbuildable or require reinforcements. The studio's federal layers are indicative; the decision is taken with the cantonal map and, where needed, a specialist.

Reading old municipal regulations

After the 2018 reform, municipalities had to adapt their RCCZ to the AIHC terms. An old land-use ratio does not necessarily have the same basis as the IBUS: check that the regulations you are reading are the ones in force.

How to use it in 3 steps: analysing a plot in Valais with the Geo-Scanner

  1. Find the plot
    Enter the address, the plot number with the municipality, the EGRID or the LV95 coordinates. The card shows the number, the EGRID, the indicative area and the altitude of the point.
  2. Read the terrain and the hazards
    Display the avalanche, rockfall and run-off layers and the foundation soil class, then draw a slope profile across the plot. Note the nearest watercourse and the access road.
  3. Confirm with the municipality and the canton
    Open the link to the PLR cadastre and the PDF extract, copy the report or export the CSV, then ask for the PAZ, the RCCZ, the hazard map and the municipality's second homes status.

Open the free studio →

What the free Geo-Scanner does not do for a plot in Valais

The studio does not read the content of PLR restrictions and does not display the cantonal hazard maps, groundwater protection zones, the noise sensitivity level, easements or the municipality's second homes status. It does not calculate the IBUS, determines no snow load and no structural sizing, and gives no prices.

Portail chantier then gathers the project file (extract, plans, building permit) and shares it with the client. The Art Construction ERP costs the bid, tracks the site, the season and the SME's invoicing, and prepares the site opening sheet. Neither replaces the opinion of the municipality or a specialist.

Frequently asked questions

Which law governs building in Valais?

The cantonal Building Act (LC) of 15 December 2016 and the Building Ordinance (OC), in force since 2018 and amended since. The rules for each site are in the municipality's RCCZ and PAZ.

How is the IBUS calculated?

Under the AIHC definition adopted by Valais, the IBUS is the sum of the floor areas divided by the relevant land area. The maximum value and any possible increases are read in the RCCZ and the OC.

Does the Geo-Scanner show whether the municipality is restricted on second homes?

No. This status is published by the Confederation and the municipality; ask for it before any housing project, as it determines the permitted use of new dwellings.

Why is the altitude useful before a bid?

It tells you about the building season, frost and winter access. Snow loads are determined by the engineer under the SIA 261 standard; the studio's altitude is a reference point, not a calculation.