The canton of Lucerne governs planning and building through the planning and building act (Planungs- und Baugesetz, PBG) and its ordinance (Planungs- und Bauverordnung, PBV). It joined the intercantonal agreement harmonising building terms (IVHB) on 1 January 2014. On that occasion, the Ausnützungsziffer (AZ, floor area ratio), which the IVHB does not include, was abandoned: it was replaced by the site coverage index (Überbauungsziffer, ÜZ), redefined according to the IVHB. Municipalities set its values in their building and zoning regulations (Bau- und Zonenreglement, BZR) and zoning plan, together with the permitted heights.
The Geo-Scanner locates the plot by address, number and municipality, EGRID or coordinates. Its sheet gives the area calculated from the geometry, the status of the Lucerne ÖREB cadastre (public-law restrictions on landownership) with the link to the extract when it is published, the ARE harmonised building zone, modelled exposure to road and rail noise, the nearest watercourse, the altitude and the slope profile. The canton of Lucerne’s geoportal then gives access to the official zoning plans.
Worked example: checking the site coverage index of a house in Lucerne
An 800 m² plot in a residential zone. The municipal regulations set a site coverage index (ÜZ) with an example value of 0.30. The client plans a 15.00 m by 14.00 m house; a 30 m² carport is being considered. How small annex buildings are counted is checked in the BZR and the PBV.
| Item | Calculation | Value |
|---|---|---|
| Plot area | Geo-Scanner, indicative | 800 m² |
| Permitted building area (ÜZ 0.30) | 800 × 0.30 | 240 m² |
| House footprint | 15.00 × 14.00 | 210 m² |
| Footprint reserve | 240 − 210 | 30 m² |
| Footprint with the carport, if it counts | 210 + 30 | 240 m² |
| Average ground slope | 3 m over 30 m | 10 % (5.7°) |
The example site coverage index allows 800 × 0.30 = 240 m² of chargeable building area. The house covers 15.00 × 14.00 = 210 m²: 30 m² remain. If the 30 m² carport counts in the footprint, the project reaches exactly 240 m², with no margin for a canopy or an extension. If it is treated as a small non-chargeable building, the reserve stays at 30 m²: the applicable rule changes the design of the project.
The profile drawn over 30 m shows 3 m of height difference: 3 ÷ 30 = 10 %, about 5.7°, with an altitude of 520 m at the centre of the plot. The official plot area, the permitted heights and the treatment of annexes are confirmed with the official extract and the municipality’s BZR.
With an example site coverage index of 0.30, the 210 m² house leaves a 30 m² reserve, which the carport may use up entirely depending on the municipal rule.
3 frequent pitfalls before buying or costing a plot in Lucerne
Still reasoning with the old floor area ratio
Adverts or old files sometimes quote an AZ. Since joining the IVHB, the canton measures the footprint (ÜZ) and the heights: an old floor area calculation no longer tells you what can be built.
Forgetting municipal transitional provisions
Municipalities adapted their BZR at different dates; some old provisions remained applicable for a while. Check which version of the regulations applies to the plot on the day of the permit application.
Underestimating noise and easements
Along main roads and railway lines, noise exposure may require measures. The Geo-Scanner shows modelled exposure, not the sensitivity level of the zone. Easements in the land register do not appear in the ÖREB cadastre.
How to use it in 3 steps for a plot in the canton of Lucerne
- Locate the plot and read its sheet
Search for the plot by address, number with the municipality or EGRID. Note the indicative area, the harmonised zone and the ÖREB cadastre status. - Read noise and constraints
Turn on the road and rail noise layers, check the nearest watercourse, then open the ÖREB extract and the municipal zoning plan on the canton’s geoportal. - Measure the slope and export
Draw a profile between the road and the furthest point, note altitude and slope, then copy the report or export the CSV for your file.
What the Geo-Scanner does not do for a plot in Lucerne
The Geo-Scanner does not read the content of the ÖREB restrictions and does not show groundwater protection zones, the cantonal hazard map, the noise sensitivity level or easements. It does not calculate the site coverage index: the check is done by hand with the BZR. Searches go to the public swisstopo API and nothing is stored.
For the next stage of the project, Portail chantier gathers the file (extracts, plans, permits) and shares it with the client. ERP Art Construction costs bids, tracks the site and the invoicing, and opens each site with its own sheet.
Frequently asked questions
Which act governs building in the canton of Lucerne?
The planning and building act (PBG) and its ordinance (PBV), completed by each municipality’s building and zoning regulations (BZR) and zoning plan.
Why does Lucerne no longer use the floor area ratio?
By joining the IVHB on 1 January 2014, the canton abandoned the floor area ratio, which the agreement does not include. It replaced it with the site coverage index (ÜZ), combined with the permitted heights.
Where can I find the canton of Lucerne’s ÖREB cadastre?
The Geo-Scanner shows the status of the Lucerne ÖREB cadastre and offers the link to the plot’s extract when it is published. The canton’s geoportal also gives access to the zoning plans.
Is the area shown by the Geo-Scanner enough for the calculation?
No. It is calculated from the geometry and remains indicative. The site coverage index is calculated on the official area and according to the definitions of the PBV and the BZR.