Plot feasibility in Schaffhausen: PLR cadastre (ÖREB), BauG and land-use ratios

Before buying land in Schaffhausen or submitting a bid, locate the plot, read its PLR status and check the ratio provided for by the municipality.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Schaffhausen, building is governed by the Building Act (Baugesetz, BauG) and its implementing ordinance (Verordnung zum Baugesetz, BauV). A partial revision that came into force on 1 January 2011 took over the terms and measuring methods of the intercantonal agreement (IVHB in German, AIHC in French). A feature of the canton: the plot ratio (Ausnützungsziffer, AZ), which does not exist in the IVHB, is still allowed by cantonal law, and a majority of municipalities still use it in their building and land-use regulations (Bau- und Nutzungsordnung). Other municipalities work with the floor area ratio (Geschossflächenziffer). The PLR cadastre is kept by the cantonal geoinformation office.

The Art Construction Geo-Scanner prepares the analysis. You search for the plot by address, by number and municipality, by EGRID or by coordinates. The result card shows the number, the EGRID, an indicative area, the harmonised ARE building zone, the status of the cantonal PLR cadastre with its link, as well as the federal noise, hazard and groundwater layers. In a canton shaped by the Rhine, its alluvial aquifers and many historic centres, these markers guide the questions to put to the municipality.

Worked example: analysing a plot with a plot ratio in Schaffhausen

A square plot of 30.00 m by 30.00 m, or 900 m², in a residential zone of a Schaffhausen municipality that still applies the plot ratio. The values are examples: the actual value and the definition of the relevant areas are in the Bau- und Nutzungsordnung and the BauV.

Analysis of a Schaffhausen plot with a plot ratio (example values)
ItemValueCalculationResult
Plot area (Geo-Scanner, indicative)30.00 × 30.00 m30.00 × 30.00900 m²
Plot ratio AZ (example)0.45900 × 0.45405 m²
Boundary distance (example)4.00 m on each side(30.00 − 8.00) × (30.00 − 8.00)484 m²
Altitude of the point (Geo-Scanner)450 mreading at the centre of the plot450 m a.s.l.
Ground slope (Geo-Scanner profile)1.2 m over 30.0 m1.2 ÷ 30.04 %

The indicative area is 30.00 × 30.00 = 900 m². With an example plot ratio of 0.45, the maximum usable floor area is 900 × 0.45 = 405 m². An example boundary distance of 4.00 m on each side leaves a building envelope of 22.00 × 22.00 = 484 m², more than enough for a two-storey footprint of 202.5 m² per storey.

The slope profile gives 1.2 m over 30.0 m, or 4 %: almost flat ground, where the question of the basement is mainly about the groundwater. The Geo-Scanner shows the groundwater body; the groundwater protection zone and area are read in the cantonal cadastre before planning a basement or a deep excavation.

On this example plot, the plot ratio allows at most 405 m² of floor area, within a building envelope of 484 m²: to be confirmed according to the municipality's Bau- und Nutzungsordnung.

3 common mistakes before buying a plot in Schaffhausen

Assuming every municipality uses the same ratio

The canton allows the plot ratio but does not impose it: some municipalities apply it, others use the floor area ratio. Read the municipality's Bau- und Nutzungsordnung before comparing two sites.

Underestimating the protection of historic centres

Several places in Schaffhausen are listed in the federal inventory of sites (ISOS). In a centre zone, volumes, roofs and materials are regulated: a project or a bid for alterations is prepared with the opinion of the municipality and the monuments office.

Ignoring the aquifer and the groundwater protection zones

The alluvial terraces hold groundwater that is in use. An excavation, a basement or a geothermal borehole may be restricted there: the Geo-Scanner flags the groundwater body, the cantonal cadastre shows the protection zone.

How to use it in 3 steps for a plot in Schaffhausen

  1. Locate the plot
    Enter the address, the number and municipality, the EGRID or LV95 coordinates. Check the outline on the orthophoto and on the cantonal cadastral map.
  2. Read the card and the PLR cadastre
    Note the indicative area, the altitude, the harmonised building zone and the PLR status. Open the cantonal cadastre from the card and display the noise and groundwater layers with their legend.
  3. Measure the slope and export
    Draw a profile between two points of the plot. Copy the report or export the CSV, then do the calculation with the ratio and the distances from the Bau- und Nutzungsordnung.

Open the free studio →

What the free Geo-Scanner does not do in Schaffhausen

The Geo-Scanner does not read the content of PLR restrictions: it refers you to the cantonal cadastre. It does not display groundwater protection zones, the cantonal hazard map, the noise sensitivity level, ISOS, easements or building lines. It calculates no ratio and no structural sizing, and keeps nothing.

Portail chantier brings the project file together and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME, with a site opening sheet. Neither of these tools carries out a legal analysis.

Frequently asked questions

Is the plot ratio (AZ) still allowed in Schaffhausen?

Yes, cantonal law still allows it, even though the IVHB does not include it. Each municipality chooses in its Bau- und Nutzungsordnung the ratio it applies: check it for the plot concerned.

What are the building act and ordinance in Schaffhausen?

The Building Act (Baugesetz, BauG) and the ordinance on the Building Act (BauV). Consult the version in force in the canton's collection of laws.

Who issues the PLR extract in Schaffhausen?

The cantonal geoinformation office keeps the PLR cadastre. The Geo-Scanner shows the status and opens the cantonal cadastre; the official extract is binding.

Does the Geo-Scanner show groundwater protection zones?

No: they are cantonal. It shows the groundwater body and the regional vulnerability of aquifers. The protection zone is read in the PLR cadastre or on the canton's geoportal.