Plot feasibility in the canton of Neuchâtel: PLR cadastre, IBUS, IOS and green area index

Neuchâtel has adopted the IVHB (AIHC) terminology: a plot is read with several indices at once. Calculate them together before buying or costing.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In the canton of Neuchâtel, planning falls under the cantonal spatial planning act (LCAT) and its implementing regulations (RELCAT); building falls under the building act (LConstr.) and its implementing regulations (RELConstr.). The canton joined the intercantonal agreement harmonising building terminology (AIHC, in German IVHB) by decree in 2010: the former utilisation index became the gross land-use index (IBUS, indice brut d’utilisation du sol) and the former coverage rate the site coverage index (IOS, indice d’occupation du sol). The RELCAT allows the measure of land use to be expressed by the IBUS, the mass index (IM), the IOS or the green area index (IVer), whose values are in each municipality’s planning regulations.

The Geo-Scanner locates the plot by address, number and municipality, EGRID or coordinates. Its sheet gives the area calculated from the geometry, the status of the Neuchâtel PLR cadastre (RDPPF, public-law restrictions on landownership) with the link to the extract when it is published, the ARE harmonised building zone, the groundwater body, the altitude and the slope profile. The official data are then consulted on the SITN geoportal (Système d’information du territoire neuchâtelois).

Worked example: three indices on the same plot in Neuchâtel

A 950 m² plot in a residential zone, at 1,000 m above sea level. The municipal planning regulations set, as example values, an IBUS of 0.50, an IOS of 0.25 and an IVer of 0.30. The slope profile is drawn over 50 m along the fall of the ground.

IVHB indices on a plot, canton of Neuchâtel (example values)
IndexExample valueCalculationResult
Relevant land areaassumptionwhole plot950 m²
IBUS: floor areas0.50950 × 0.50475 m²
IOS: building ground area0.25950 × 0.25237.5 m²
IVer: minimum green areas0.30950 × 0.30285 m²
Average ground slope50 m profile8 ÷ 5016 % (9.1°)

The example IBUS allows 950 × 0.50 = 475 m² of floor area. The IOS limits the ground footprint to 950 × 0.25 = 237.5 m²: to reach the 475 m² of floor area, the project must therefore have at least two storeys. The IVer requires 950 × 0.30 = 285 m² of green areas: access, parking spaces and terraces must fit in the rest of the unbuilt plot.

The 50 m profile shows 8 m of height difference: 8 ÷ 50 = 16 %, about 9.1°. At 1,000 m above sea level, the frost period and snow cover weigh on the schedule; snow loads are determined under SIA standard 261 by the engineer. The exact relevant land area is taken from the official extract and the IVHB definitions.

With the example values, the plot allows 475 m² of floor area on a footprint of at most 237.5 m², while keeping 285 m² of green areas.

3 frequent pitfalls before buying or costing a plot in Neuchâtel

Checking only one index

A project can meet the IBUS and exceed the IOS, or leave too little green area. Calculate all the indices set by the municipal regulations for the zone, from the sketch stage.

Reusing an old coverage rate calculation

Since joining the IVHB, definitions have changed: floor areas, relevant land area, building area. An old file calculated under the former law cannot be transposed as it is.

Overlooking groundwater and hazards

The limestone subsoil makes groundwater vulnerable, and some slopes are exposed to landslides. The Geo-Scanner gives national indications; groundwater protection zones and the hazard map are read in the PLR cadastre and on the SITN.

How to use it in 3 steps for a plot in the canton of Neuchâtel

  1. Locate the plot and read its sheet
    Search for the plot by address, number with the municipality or EGRID. Note the indicative area, the harmonised zone and the PLR cadastre status.
  2. Open the PLR extract and the SITN
    Follow the link to the PLR extract when it is published, then consult the SITN and the municipal planning regulations for the IBUS, IOS and IVer values.
  3. Measure the slope and export
    Draw a profile along the fall of the ground, note altitude and height difference, then copy the report or export the CSV for your file.

Open the free studio →

What the Geo-Scanner does not do for a plot in Neuchâtel

The Geo-Scanner does not read the content of the PLR restrictions and does not show cantonal groundwater protection zones, the detailed hazard map, the noise sensitivity level or easements. It calculates neither the IBUS, nor the IOS, nor the IVer: the calculation is done by hand. Searches go to the public swisstopo API and nothing is stored.

For the next stage of the project, Portail chantier gathers the file (extracts, plans, permits) and shares it with the client. ERP Art Construction costs bids, tracks the site and the invoicing, and opens each site with its own sheet.

Frequently asked questions

Which acts apply to building in Neuchâtel?

The cantonal spatial planning act (LCAT) and its regulations (RELCAT), the building act (LConstr.) and its regulations (RELConstr.), completed by each municipality’s land-use plan and planning regulations.

What is the difference between the IBUS and the IOS?

The IBUS relates floor areas to the relevant land area; the IOS relates the building ground area to the same area. The first measures density, the second the footprint.

Where can I consult the official Neuchâtel data?

On the SITN geoportal. The Geo-Scanner also shows the status of the canton’s PLR cadastre and offers the link to the plot’s extract when it is published.

Does the Geo-Scanner calculate the IVHB indices?

No. It provides the indicative area, the altitude and the slope. The indices are calculated by hand on the official area, with the values of the municipal regulations.