The bilingual canton of Bern governs building through the building act (Baugesetz, BauG, in French LC) and the building ordinance (Bauverordnung, BauV, in French OC). In 2008 it joined the intercantonal agreement harmonising building terms (IVHB, in French AIHC) and applies it through the ordinance on building terms and measuring methods (BMBV, in French ONMC), in force since 2011. Municipalities set the measure of use in their building regulations (Baureglement) and zoning plan; the usual index is the Geschossflächenziffer oberirdisch (GFZo, above-ground floor area ratio), which replaced the former Ausnützungsziffer in revised regulations.
The Geo-Scanner prepares the reading of these rules. It shows the plot, its EGRID, its indicative area, the ARE harmonised building zone and the status of the Bern PLR cadastre (ÖREB, public-law restrictions on landownership), kept by the cantonal office for geoinformation and available in the canton’s geoportal, with the link to the PDF extract when it is published. The noise, indicative hazard and water layers complete the first check.
Worked example: above-ground floor area with the Bern GFZo
A 900 m² plot in a two-storey residential zone, at about 560 m above sea level. The municipality’s building regulations set a GFZo of 0.60 (example value). The project has two storeys of 13.00 m by 11.00 m and a 90 m² top-floor attic.
| Data | Source | Calculation | Result |
|---|---|---|---|
| Relevant land area | Geo-Scanner (indicative) | geometry | 900 m² |
| GFZo | building regulations (example) | zone value | 0.60 |
| Max. above-ground floor area | calculation | 900 × 0.60 | 540 m² |
| Two storeys of the project | plans | 13.00 × 11.00 × 2 | 286 m² |
| Top-floor attic | plans | measured area | 90 m² |
| Floor area reserve | calculation | 540 − 286 − 90 | 164 m² |
The 900 m² area multiplied by the example GFZo of 0.60 gives at most 540 m² of above-ground floor area. The project’s two storeys total 286 m² and the attic 90 m², i.e. 376 m²: 164 m² remain, enough to enlarge the attic or add an annex if the distances allow.
Basement levels do not count in the GFZo, but the line between above-ground level and basement follows the BMBV measuring methods, based on the reference ground level. The real GFZo value, the small and large boundary distances and the heights are found in the municipality’s building regulations.
With an example GFZo of 0.60, the 900 m² plot allows 540 m² of above-ground floor area; the project uses 376 m² and leaves a 164 m² reserve.
3 frequent pitfalls on a plot in the canton of Bern
Applying an old Ausnützungsziffer
Some municipalities have revised their building regulations after the BMBV, others not yet. An old document quoted in an advert may give an AZ that no longer applies: check the version of the regulations in force.
Forgetting the small and large boundary distances
Bern building regulations often set a small boundary distance and a large distance on the main façade side. The possible footprint shrinks more than the map suggests.
Overlooking the noise sensitivity level
The Geo-Scanner shows modelled exposure to road and rail noise, not the sensitivity level of the zone. Near a busy route, protection measures may be required: the level is found in the zoning plan.
How to use it in 3 steps in the canton of Bern
- Locate the plot
Enter the address, the number and the municipality, the EGRID or the LV95 coordinates. Check the highlighted plot on the orthophoto. - Open the PLR extract
Note the harmonised zone and the PLR status, then follow the link to the Bern cadastre for the PDF extract. At the same time, download the municipality’s building regulations. - Complete and export
Display the noise and indicative hazard layers, draw a slope profile, then copy the report or export the CSV for your file.
What the free Geo-Scanner does not do in the canton of Bern
The Geo-Scanner does not calculate the GFZo, does not read the building regulations and does not apply the BMBV measuring methods. It does not show boundary distances, the noise sensitivity level, detailed cantonal hazard maps, groundwater protection zones or easements. No structural calculation and no snow or wind load.
Portail chantier then gathers the PLR extract, the plans and the permit in a file shared with the client. ERP Art Construction costs the work, tracks the site and the invoicing, and prints a site opening sheet. Neither calculates an index of use.
Frequently asked questions
Does the canton of Bern apply the IVHB?
Yes. The canton joined in 2008 and applies it through the BMBV (ONMC), in force since 2011. Municipalities adapt their building regulations as they revise them.
What does the GFZo measure?
The Geschossflächenziffer oberirdisch relates the sum of above-ground floor areas to the relevant land area. Basement levels are not included; the value per zone is found in the building regulations.
Where can I find the Bern PLR cadastre?
In the canton of Bern’s geoportal. The Geo-Scanner shows the cadastre status for the chosen plot and offers a link to the cantonal cadastre and, if published, to the PDF extract.
Does the Geo-Scanner work in the Bernese Jura?
Yes, it covers the whole of Switzerland. The applicable rules remain those of the canton of Bern and of the municipality’s building regulations, whether French- or German-speaking.