Free software · 100% in your browser · no data sent

Plot feasibility in Schwyz: PLR cadastre (ÖREB), PBG and the plot ratio

Before buying land in Schwyz or submitting a bid, locate the plot, read its PLR status and identify the slope and the natural hazards.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Schwyz, planning and building are governed by the Planning and Building Act (Planungs- und Baugesetz, PBG) and its implementing ordinance, renamed in 2023 the Planning and Building Ordinance (PBV). The canton joined the intercantonal agreement harmonising building terminology (IVHB in German, AIHC in French) with a reservation: municipalities may continue to use the plot ratio (Ausnützungsziffer, AZ), and a majority of them do. The exact extent to which the IVHB definitions have been written into cantonal law is to be checked in the version of the PBG in force. Each municipality sets its rules in its building regulations (Baureglement) and its zoning plan (Zonenplan).

The Art Construction Geo-Scanner gives the first card: search by address, number and municipality, EGRID or coordinates, then number, EGRID, indicative area, harmonised ARE building zone and cantonal PLR cadastre status with its link. In a canton of lakes, mountain streams and alpine slopes, the federal avalanche, rockfall and run-off layers, the altitude and the slope profile give first markers before the cantonal hazard map.

Worked example: analysing a sloping plot with a plot ratio in Schwyz

A 680 m² plot in a residential zone, on a slope in Schwyz above a lake. The municipality applies the plot ratio. The values are examples: the actual value and the definition of the relevant areas are in the municipal Baureglement and the PBG.

Analysis of a sloping plot in Schwyz (example values)
ItemValueCalculationResult
Plot area (Geo-Scanner, indicative)680 m²plot geometry680 m²
Plot ratio AZ (example)0.50680 × 0.50340 m²
Part to check on the hazard map (example)120 m²680 − 120560 m² outside the area
Altitude of the point (Geo-Scanner)560 mreading at the centre of the plot560 m a.s.l.
Ground slope (Geo-Scanner profile)10.8 m over 60.0 m10.8 ÷ 60.018 %

With 680 m² of indicative area and an example plot ratio of 0.50, the maximum usable floor area is 680 × 0.50 = 340 m². If 120 m² of the plot, on the stream side, lie in an area to be checked on the cantonal hazard map, the building position is sought in the remaining 560 m², without changing the basis of the ratio, to be confirmed with the municipality.

The profile gives a 10.8 m difference in height over 60.0 m, an average of 18 %. On such a slope, lorry access, retaining walls and spoil weigh on the bid: the surveyor's survey and a geotechnical engineer's opinion refine this first order of magnitude.

On this example plot, the plot ratio allows at most 340 m² of floor area, to be placed outside the hazard area to be checked, on ground with an 18 % slope.

3 common mistakes before buying a plot in Schwyz

Believing the IVHB abolished the plot ratio

Schwyz joined the IVHB while reserving the plot ratio, which most municipalities still apply. Read the municipality's Baureglement: depending on the case, it is the AZ or another ratio that limits the floor area.

Relying on the federal layers for natural hazards

The SilvaProtect indications and the run-off shown by the Geo-Scanner remain indicative. Stream floods, landslides and avalanches are read on the canton's hazard map, which determines the building permit.

Underestimating site access on a slope

A narrow road, a steep ramp or a weight limit change the lifting and transport equipment. The Geo-Scanner shows the nearest road; local restrictions are checked on site and with the municipality.

How to use it in 3 steps for a plot in Schwyz

  1. Locate the plot
    Enter the address, the number and municipality, the EGRID or LV95 coordinates. Check the outline on the orthophoto and the cantonal cadastral map.
  2. Read the PLR status and the hazard layers
    Note the indicative area, the harmonised zone and the PLR status, and open the cantonal cadastre. Display avalanches, rockfall and run-off with their legend, then consult the cantonal hazard map.
  3. Measure the slope and export
    Draw a profile between the bottom and the top of the plot: length, difference in height and average slope are displayed. Export the CSV or copy the report for the bid file.

Open the free studio →

What the free Geo-Scanner does not do in Schwyz

The Geo-Scanner does not read the content of PLR restrictions and does not display the cantonal hazard map, groundwater protection zones, the noise sensitivity level, ISOS or easements. It calculates no ratio, no snow load and no structural sizing: these matters are for the municipality, the canton and the engineer.

Portail chantier brings the project file together and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME, with a site opening sheet. Neither of these tools carries out a legal analysis.

Frequently asked questions

Does the plot ratio (AZ) still apply in Schwyz?

Yes, in many municipalities: the canton joined the IVHB while allowing municipalities to keep the AZ. The municipal Baureglement states the applicable ratio and its value.

What are the building act and ordinance in Schwyz?

The Planning and Building Act (PBG) and the Planning and Building Ordinance (PBV). Check the version in force in the canton's collection of laws.

Where can I see whether my plot is in a hazard zone in Schwyz?

On the canton's hazard map and in the PLR cadastre. The Geo-Scanner displays federal indications, useful as a first marker but not sufficient.

Are my searches sent to Art Construction?

No. Addresses, plots and clicked points go to the public swisstopo API to obtain maps and data; nothing is sent to Art Construction or stored.