Plot feasibility in the canton of Vaud: PLR cadastre (RDPPF), LATC, RLATC, IUS and IOS

Before signing a promise to buy or submitting a bid for earthworks in Vaud, locate the plot and prepare the right questions about the municipal land-use plan.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In the canton of Vaud, spatial planning and building control are governed by the Spatial Planning and Building Act (loi sur l'aménagement du territoire et les constructions, LATC) and its implementing regulations (RLATC). Each municipality sets the detailed rules in its municipal land-use plan and regulations, often still called the general land-use plan (plan général d'affectation, PGA) in municipalities that have not completed their revision. According to the cantonal glossary, the land-use ratio (indice d'utilisation du sol, IUS) has replaced the former land-use coefficient (coefficient d'utilisation du sol, CUS), with the definition from the intercantonal AIHC agreement; many municipal regulations refer to the SIA 421 standard (or SIA 504 421) for its calculation. The footprint is governed by a site coverage ratio (indice d'occupation du sol, IOS) or by other siting rules depending on the municipality.

The Art Construction Geo-Scanner prepares this reading in the browser. You find the plot by address, number and municipality, EGRID or coordinates; the card shows the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the Vaud PLR cadastre (RDPPF), with the link to the cantonal cadastre and to the PDF extract when it is published. The altitude, the slope profile and the federal noise, water and hazard layers complete the card. The cantonal Vaud map portal remains the reference for the land-use plan, the hazard maps and the groundwater protection areas.

Worked example: plot in a low-density residential zone in the canton of Vaud

A 1,100 m² plot in a low-density residential zone, on a hillside, alongside a cantonal road. The IUS and IOS are example values: the actual value and the reference area are in the municipal regulations.

Reading the plot and calculating the permitted areas (example values)
ItemValueCalculation or source
Plot area1,100 m²Geometry read in the Geo-Scanner, indicative
Land-use ratio IUS (example)0.4Example value from the municipal regulations
Maximum relevant floor area440 m²1,100 × 0.4
Site coverage ratio IOS (example)0.2Example value from the municipal regulations
Maximum footprint220 m²1,100 × 0.2
Slope profile over 50 m8 %Difference in height of 4.00 m ÷ 50 m

With an example IUS of 0.4, the permitted relevant floor area is 1,100 × 0.4 = 440 m². With an example IOS of 0.2, the footprint is limited to 1,100 × 0.2 = 220 m²: two full storeys of 220 m² reach the 440 m². The areas to count (basements, attics, garages) depend on the definition adopted by the municipal regulations: it decides whether a converted basement counts in the calculation or not.

The Geo-Scanner shows modelled day and night road noise exposure along the road: the sensitivity level assigned to the zone, however, is set by the land-use plan, and measures may be required for noise-sensitive rooms. The profile gives a 4.00 m difference in height over 50 m, or 8 %: a moderate slope, but one that weighs on the access, the garage ramp and the volume of soil to remove.

With the example ratios, the 1,100 m² plot allows 440 m² of relevant floor area and 220 m² of footprint, on ground with an 8 % slope exposed to road noise.

3 common pitfalls before buying or costing a plot in the canton of Vaud

Relying on an old PGA under revision

Many Vaud municipalities are revising their plans to resize their building zones. Land that is buildable under the old plan may be affected by a plan under public consultation or by a reserved zone: ask the municipality about the state of planning before buying.

Confusing the PLR extract with easements

The PLR extract lists public-law restrictions. Rights of way, rights of view and building restrictions are private-law easements: they appear in the land register, not in the PLR cadastre or the Geo-Scanner. They can block a building position that the regulations otherwise allow.

Forgetting heritage and trees

Cantonal architectural inventory, ISOS in old centres, trees protected by municipal regulations: these constraints are not in the studio's layers and may require a different project. Find out before fixing the brief.

How to use it in 3 steps: analysing a Vaud plot with the Geo-Scanner

  1. Find the plot
    Enter the address, the plot number with the municipality, the EGRID or the LV95 coordinates. Choose the right result: the card shows the number, the EGRID and the indicative area.
  2. Read PLR, zone, noise and slope
    Open the PLR, cadastre and zone section, then the link to the canton's PDF extract when it exists. Display the road and rail noise, water and hazard layers, then draw a slope profile across the plot.
  3. Recalculate with the municipal regulations
    Copy the report or export the CSV, ask the municipality for the land-use plan, the regulations and the state of revisions, then recalculate the IUS and IOS with the real values and the correct definition of areas.

Open the free studio →

What the free Geo-Scanner does not do for a plot in the canton of Vaud

The studio does not read the content of PLR restrictions: it refers you to the Vaud cadastre. It does not display groundwater protection areas and zones, the cantonal hazard maps, the noise sensitivity level, the architectural inventory, ISOS, easements or building lines. It calculates neither the IUS nor the IOS, carries out no structural calculation and gives no prices.

Portail chantier is then used to gather the project file (extract, plans, building permit) and share it with the client. The Art Construction ERP costs the bid, tracks the site and the SME's invoicing and prepares the site opening sheet. Neither replaces the opinion of the municipality, an architect or a lawyer.

Frequently asked questions

Which law applies to building in the canton of Vaud?

The Spatial Planning and Building Act (LATC) and its implementing regulations (RLATC). The rules specific to each site are in the municipal land-use plan and its regulations.

IUS or CUS: what is the difference?

According to the cantonal glossary, the IUS replaced the CUS with a definition taken from the intercantonal AIHC agreement, considered equivalent. In older regulations you may still read CUS: check the definition and the calculation standard cited by the municipality.

Has the canton of Vaud joined the AIHC?

The cantonal government has proposed joining several times, in 2011 and then during the revision of the LATC. The current status is to be checked in the official collection of Vaud laws; for your calculation, the definition in the municipal regulations applies.

Is the plot area in the Geo-Scanner binding?

No. It is calculated from the official survey geometry, for guidance only. The land register extract is binding for the purchase and the permit application.