Free software · 100% in your browser · no data sent

Plot feasibility in the Grisons: ÖREB cadastre, KRG and municipal building law

In the mountains, altitude, slope and natural hazards weigh as much as the index: gather these data before buying land or submitting a bid.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In the Grisons, planning falls under the cantonal spatial planning act (Raumplanungsgesetz für den Kanton Graubünden, KRG) and its ordinance (KRVO). In 2006 the canton joined the intercantonal agreement harmonising building terms (IVHB / AIHC); the KRVO requires municipalities to adapt their municipal building law (Baugesetz) to this terminology. Municipalities were able to keep the Ausnützungsziffer (AZ, floor area ratio): depending on the municipality, you therefore find the AZ or other measures, with definitions that vary.

The Geo-Scanner locates the plot by address, number and municipality, EGRID or coordinates. Its sheet gives the area calculated from the geometry, the status of the Grisons ÖREB cadastre (public-law restrictions on landownership), kept by the Office for Agriculture and Geoinformation (ALG), with the link to the extract when it is published, the harmonised building zone, the altitude, the avalanche and rockfall hazard indications, the seismic zones and the foundation soil class. The slope profile shows in a few clicks what the terrain imposes on earthworks and access.

Worked example: sloping plot in a mountain municipality in the Grisons

A 750 m² plot in a residential zone of a mountain municipality, at 1,250 m above sea level. The municipal building law applies an Ausnützungsziffer (AZ) with an example value of 0.60. The profile drawn in the Geo-Scanner follows the line of steepest slope of the plot over 50 m.

Analysis of a mountain plot, canton of the Grisons (example values)
ItemSource or calculationValue
Plot areaGeo-Scanner, indicative750 m²
Ausnützungsziffer (AZ)municipal law, example0.60
Chargeable floor area750 × 0.60450 m²
Altitude of the pointGeo-Scanner1,250 m a.s.l.
Height difference on the profile50 m profile12 m
Average slope12 ÷ 5024 % (13.5°)

The example index gives 750 × 0.60 = 450 m² of chargeable floor area, provided that the definition of the relevant area in the municipal law matches the official plot area. The profile shows 12 m of height difference over 50 m: 12 ÷ 50 = 24 %, i.e. about 13.5°. Such a slope requires retaining walls, temporary embankments and well-planned machine access.

The 1,250 m altitude affects site organisation (frost period, snow cover); snow loads are determined under SIA standard 261 by the engineer, and the Geo-Scanner does not calculate them. The share of second homes in the municipality, governed by federal law, may also limit the use of the future dwelling: check this before any purchase.

The plot offers 450 m² of chargeable area with the example index, but a 24 % slope at 1,250 m weighs heavily on earthworks and the schedule.

3 frequent pitfalls before buying or costing a plot in the Grisons

Ignoring hazard zones

Avalanches, landslides and rockfall are frequent. The Geo-Scanner’s SilvaProtect layers are indicative; the hazard zones in the municipal zoning plan and in the ÖREB cadastre decide the conditions, or even a ban on building.

Forgetting the second-home rule

In municipalities where second homes exceed the limit set by federal law, new holiday homes are in principle no longer authorised. Land bought for a holiday chalet may not allow that project.

Transposing one municipality’s index to another

Municipal building laws are being adapted to the IVHB terminology and definitions vary. An AZ of 0.60 does not have the same effect in two municipalities: read the municipal law in force.

How to use it in 3 steps for a plot in the canton of the Grisons

  1. Locate the plot and read its sheet
    Search for the plot by address, number with the municipality or EGRID. Note the indicative area, the altitude, the harmonised zone and the ÖREB cadastre status.
  2. Read the hazards and the soil
    Turn on the avalanche, rockfall, seismic zone and foundation soil class layers, with their official legend. Then open the canton’s ÖREB extract.
  3. Draw the profile and export
    Draw a profile along the steepest slope, note height difference and average slope, then copy the report or export the CSV for your study file.

Open the free studio →

What the Geo-Scanner does not do for a plot in the Grisons

The Geo-Scanner does not read the content of the ÖREB restrictions and does not show municipal hazard zones, groundwater protection zones, the noise sensitivity level or easements. It calculates no index, no snow load and no structural sizing. Searches go to the public swisstopo API and nothing is stored.

For the next stage of the project, Portail chantier gathers the file (extracts, plans, permits) and shares it with the client. ERP Art Construction costs bids, tracks the site and the invoicing, and opens each site with its own sheet.

Frequently asked questions

Which act governs building in the Grisons?

The cantonal spatial planning act (KRG) and its ordinance (KRVO), completed by each municipality’s building law and zoning plan.

Does the Grisons apply the IVHB?

Yes, the canton joined the agreement in 2006. Municipalities are adapting their building law to this terminology; some have kept the Ausnützungsziffer (AZ).

Does the Geo-Scanner give the exact altitude of a plot?

It gives the altitude of the chosen point from the swisstopo terrain model. It is an indicative value; the surveyor’s plan is binding for the project.

Can the snow load be calculated with the Geo-Scanner?

No. The altitude helps prepare the study, but snow and wind loads are determined under SIA standard 261 by the civil engineer.