Plot feasibility in Aargau: ÖREB cadastre, BauG and AZ index

Before a purchase or a bid in Aargau, locate the plot, read its ÖREB status and its zone, then check the Ausnützungsziffer set by the municipality’s BNO.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Aargau, building rules are read at three levels: the cantonal building act (Baugesetz, BauG) and its ordinance (Bauverordnung, BauV), then each municipality’s Bau- und Nutzungsordnung (BNO, building and land-use regulations) and zoning plan. The canton has kept the Ausnützungsziffer (AZ, floor area ratio) as the usual measure of use: it is the figure most BNOs set zone by zone. The canton’s position on the intercantonal agreement harmonising building terms (IVHB, in French AIHC) should be checked in the current BauV before relying on a definition of floor area.

The Geo-Scanner is for the first check. You search for the plot by address, number and municipality, EGRID or LV95 coordinates; the sheet shows its number, its EGRID, an area calculated from the geometry, the ARE harmonised building zone and the status of the Aargau ÖREB cadastre (cadastre of public-law restrictions on landownership), with the link to the PDF extract when the canton publishes it. The AGIS Geoportal and the cantonal ÖREB cadastre remain the reference: according to the cantonal documentation, only the paper plan and the BNO are legally binding.

Worked example: feasibility of a plot in an Aargau residential zone

A 720 m² plot in a two-storey residential zone (W2), along a cantonal road. The municipality’s BNO sets an AZ of 0.45 for this zone (example value). A building line (Baulinie) runs along the road for 24.00 m, 4.00 m inside the plot. The ground rises towards the back.

Plot data and feasibility calculation (example values)
DataSourceCalculationResult
Plot areaGeo-Scanner (indicative)geometry720 m²
Ausnützungsziffer AZmunicipal BNO (example)zone value0.45
Max. chargeable floor areacalculation720 × 0.45324 m²
Strip affected by the BaulinieÖREB extract24.00 × 4.0096 m²
Area outside the building linecalculation720 − 96624 m²
Height difference on profile A-BGeo-Scanner30.0 m × 6.0 %1.80 m

The area given by the Geo-Scanner, 720 m², multiplied by the example AZ of 0.45, gives at most 324 m² of chargeable floor area. The Baulinie does not reduce the area used for the AZ, but it removes 96 m² from the possible footprint: 624 m² remain for siting the building, before the boundary distances set by the BNO.

The profile drawn from the road to the back of the plot, over 30.0 m, shows an average slope of 6.0 %, i.e. 1.80 m of height difference: enough to plan a gentle ramp access and light earthworks. The exact definition of chargeable floor area and the real AZ value are found in the BauV and the municipality’s BNO; the official ÖREB extract is binding for the plot area.

With an example AZ of 0.45, the 720 m² plot allows at most 324 m² of chargeable floor area, on a footprint reduced to 624 m² by the building line.

3 frequent pitfalls on an Aargau plot before a purchase or a bid

Taking the AZ of a neighbouring municipality

In Aargau, each municipality sets its AZ values in its BNO, zone by zone. Two neighbouring municipalities can give different values for a W2 zone with the same name. Read the BNO of the plot’s municipality, in the version approved by the canton.

Forgetting the Baulinien along roads

Building lines along cantonal and municipal roads appear in the land-use plans and in the ÖREB cadastre, not on the zone map. They cut into the buildable footprint without changing the plot area.

Relying on the area shown on the map

The area calculated from the geometry is indicative. For a purchase contract or a structural works bid, use the area from the land register extract and check the registered easements, which do not appear in the ÖREB cadastre.

How to use it in 3 steps for a plot in Aargau

  1. Find the plot
    Enter the address, the plot number with the municipality or the EGRID in the Geo-Scanner. Check on the orthophoto and the cadastral map that the right plot is highlighted.
  2. Read the sheet and open the ÖREB extract
    Note the EGRID, the indicative area and the harmonised building zone. Follow the link to the Aargau ÖREB cadastre to get the PDF extract, then open the municipality’s BNO for the AZ and the distances.
  3. Draw the profile and export
    Draw a profile from the road to the back of the plot to read slope and height difference, look at the noise and hazard layers, then copy the report or export the CSV for your file.

Open the free studio →

What the free Geo-Scanner does not do for an Aargau plot

The Geo-Scanner does not read the content of the ÖREB restrictions: it shows the status of the cadastre and refers you to the canton. It does not show building lines, boundary distances, cantonal groundwater protection zones, detailed Aargau hazard maps or the noise sensitivity level. It does not calculate any AZ: the calculation above is done by hand. No structural calculation and no snow or wind loads: that is the engineer’s job under SIA standard 261.

As the project moves on, Portail chantier gathers the ÖREB extract, the plans and the building permit in a file shared with the client. ERP Art Construction handles costing, site tracking and invoicing for your SME, with a site opening sheet. Neither replaces reading the BNO.

Frequently asked questions

Where can I find the ÖREB extract for a plot in Aargau?

The canton of Aargau’s ÖREB cadastre is available from the AGIS Geoportal. The Geo-Scanner shows the cadastre status for the chosen point and, when the canton publishes it, a direct link to the plot’s PDF extract.

Does Aargau still use the Ausnützungsziffer?

Yes, the AZ remains the most common measure of use in Aargau BNOs. Its definition and values are found in the BauV and in the BNO of the municipality concerned, which may also set other rules per zone.

Is the zone shown by the Geo-Scanner enough?

No. It is the building zone harmonised at Swiss level by the ARE, and it is indicative. The municipality’s zoning plan and BNO are binding, with their detailed zones and any special land-use plans.

Are my searches stored?

No. The address, number or EGRID you search for goes to the public swisstopo API to display the map; nothing is sent to Art Construction and nothing is kept once the page is closed.