Plot feasibility in St. Gallen: PLR cadastre (ÖREB), PBG and the building volume ratio

Before buying land in St. Gallen or submitting a bid, locate the plot, read its PLR status and check which ratio the municipality actually applies.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

The canton of St. Gallen replaced its former building act with the Planning and Building Act (Planungs- und Baugesetz, PBG). The PBG no longer governs the plot ratio (Ausnützungsziffer, AZ); it offers municipalities other measures, in particular the building volume ratio (Baumassenziffer, BMZ), the site coverage ratio (Überbauungsziffer) and the green-space ratio (Grünflächenziffer). A feature specific to the canton: as long as a municipality has not adapted its building regulations (Baureglement) and zoning plan to the PBG, cantonal case law accepts that the old regulations and the old AZ remain applicable. For a given plot, the first question is therefore whether the municipality has already completed this adaptation.

The Art Construction Geo-Scanner prepares this check. You search for the plot by address, by number and municipality, by EGRID or by coordinates. The result card shows the number, the EGRID, an indicative area, the harmonised ARE building zone and the status of the cantonal PLR cadastre, kept by the Office for Spatial Development and Geoinformation (AREG), with a link to the cantonal cadastre. The canton of St. Gallen geoportal then completes the reading with the municipal zoning plan.

Worked example: analysing a plot with a volume ratio in St. Gallen

A 1,050 m² plot in a low-density residential zone, on a plateau in St. Gallen, in a municipality whose regulations have already been adapted to the PBG. The ratio values are examples: the actual value and the definition of the relevant areas and volumes are in the municipal regulations and the PBG.

Analysis of a St. Gallen plot with a building volume ratio (example values)
ItemValueCalculationResult
Plot area (Geo-Scanner, indicative)1,050 m²plot geometry1,050 m²
Building volume ratio BMZ (example)2.4 m³/m²1,050 × 2.42,520 m³
Green-space ratio (example)0.301,050 × 0.30315 m²
Volume of one storey (footprint 220 m², height 3.00 m)660 m³220 × 3.003 storeys = 1,980 m³
Ground slope (Geo-Scanner profile)3.6 m over 60.0 m3.6 ÷ 60.06 %

The indicative area of 1,050 m² multiplied by an example building volume ratio of 2.4 m³/m² gives at most 2,520 m³ of built volume above ground. An example green-space ratio of 0.30 reserves 1,050 × 0.30 = 315 m² of planted areas. A building with a 220 m² footprint and 3.00 m per storey represents 660 m³ per storey: 2,520 ÷ 660 = 3.8, so three full storeys (1,980 m³) stay within the ratio, to be checked against the heights and distances in the municipal regulations.

The slope profile shows a 3.6 m difference in height over 60.0 m, an average of 6 %: gently sloping ground, where the volume above the relevant ground level is calculated without a large gap between the uphill and downhill sides. If the municipality still applies the old regulations, the same plot would be calculated with an AZ: the result changes, and so does the estimate in the bid.

On this example plot, the volume ratio allows at most 2,520 m³, or three storeys of 220 m², with 315 m² of green space: to be confirmed according to the regulations in force in the municipality.

3 common mistakes before buying a plot in St. Gallen

Applying the PBG when the municipality has not yet adapted its regulations

During the transition period, the old Baureglement and the old AZ can remain applicable. Ask the municipality which regulations apply to the plot and on what date they were approved, before calculating any volume.

Reading a volume ratio as a floor area

The BMZ is expressed in cubic metres per square metre of plot: it counts the volume above the relevant ground level, not the floor areas. A generous storey height uses up the ratio faster than you might think.

Forgetting the noise of main roads and the groundwater

Motorways, railway lines and alluvial valleys cross the canton. The Geo-Scanner shows the modelled noise exposure and the groundwater body; the OPB noise sensitivity level and the groundwater protection zones are read in the cantonal and municipal documents.

How to use it in 3 steps for a plot in St. Gallen

  1. Locate the plot
    Enter the address, the number and municipality, the EGRID or LV95 or WGS84 coordinates. Check the outline on the orthophoto and on the cantonal cadastral map.
  2. Read the PLR status and the zone
    Note the indicative area, the harmonised building zone and the PLR status. Open the cantonal cadastre from the card, then the canton's geoportal for the zoning plan and the applicable municipal regulations.
  3. Measure the slope and document
    Draw a profile between two points of the plot to get the difference in height and the average slope. Copy the report or export the CSV, then calculate the ratio with the values from the municipal regulations.

Open the free studio →

What the free Geo-Scanner does not do in St. Gallen

The Geo-Scanner does not read the content of PLR restrictions and does not know whether the municipality has already adapted its regulations to the PBG. It does not display the cantonal hazard map, groundwater protection zones, the noise sensitivity level, ISOS or easements. It calculates no ratio, no snow load and no structural sizing.

Portail chantier brings the project file together and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME, with a site opening sheet. Neither replaces the opinion of the municipality or a specialist.

Frequently asked questions

Does the plot ratio (AZ) still exist in St. Gallen?

The PBG no longer governs it. But as long as the municipality has not adapted its regulations, the old regulations and their AZ can remain applicable. The municipality will tell you which one applies to your plot.

What is the building volume ratio (Baumassenziffer)?

It is the ratio between the volume of the building above the relevant ground level and the relevant plot area, in m³ per m². The value is set by the municipal regulations.

Who keeps the PLR cadastre in St. Gallen?

The cantonal Office for Spatial Development and Geoinformation (AREG). The Geo-Scanner shows the PLR status and opens the cantonal cadastre; the official extract is binding.

Does the Geo-Scanner replace the canton's geoportal?

No. It gives a quick first card for the plot with federal data. The municipal zoning plan and the detailed restrictions are consulted on the canton's geoportal and PLR cadastre.