Free software · 100% in your browser · no data sent

Plot feasibility in the canton of Zurich: ÖREB cadastre, PBG, ABV, AZ, BMZ and ÜZ

In the canton of Zurich, density is governed, depending on the municipality, by an Ausnützungsziffer, a Baumassenziffer or an Überbauungsziffer. Knowing which one applies is the first question.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In the canton of Zurich, planning and building are governed by the Planning and Building Act (Planungs- und Baugesetz, PBG) and the General Building Ordinance (Allgemeine Bauverordnung, ABV). The canton has not joined the IVHB concordat, but it adopts its terms: according to the Building Directorate, 29 of the 30 formal terms have been taken over, without the floor area ratio (Geschossflächenziffer), and the plot ratio (Ausnützungsziffer, AZ) is kept. Municipalities adapt their building and zoning regulations (Bau- und Zonenordnung, BZO) to these terms according to a cantonal timetable; depending on the municipality, density is governed by the AZ, the building volume ratio (Baumassenziffer, BMZ), the site coverage ratio (Überbauungsziffer, ÜZ) and the open-space ratio (Freiflächenziffer).

The Art Construction Geo-Scanner prepares this reading in the browser. You find the plot by address, number and municipality, EGRID or coordinates; the card shows the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the Zurich ÖREB cadastre, with the link to the cantonal cadastre and to the PDF extract when it is published. The altitude, the slope profile and the federal noise, water and hazard layers complete the card. The canton of Zurich GIS-Browser remains the reference for the BZO, the inventories and the cantonal data.

Worked example: plot in a three-storey residential zone in the canton of Zurich

A 1,000 m² plot in a three-storey residential zone, near a main road. Two versions of the regulations are compared: a municipality that sets an AZ and a municipality that sets a BMZ. The values are examples: the actual value is in the municipality's BZO.

Reading the plot and capacity according to the municipal ratio (example values)
ItemValueCalculation or source
Plot area1,000 m²Geometry read in the Geo-Scanner, indicative
Version A: AZ (example)0.8Example value from the BZO
Countable floor area (version A)800 m²1,000 × 0.8
Version B: BMZ (example)2.4 m³/m²Example value from the BZO
Built volume above ground (version B)2,400 m³1,000 × 2.4
Slope profile over 50 m4 %Difference in height of 2.00 m ÷ 50 m

In version A, an example AZ of 0.8 gives 1,000 × 0.8 = 800 m² of countable floor area. In version B, an example BMZ of 2.4 m³ per m² gives 1,000 × 2.4 = 2,400 m³ of built volume above ground. With storeys of 3.00 m gross height, these 2,400 m³ correspond to 800 m² of floor area: the two versions meet in this example, but a penthouse storey, different storey heights or an ÜZ limiting the footprint change the result.

The Geo-Scanner shows modelled day and night road noise exposure; the zone's sensitivity level is set by the municipality and may require measures for noise-sensitive rooms. The profile gives a 2.00 m difference in height over 50 m, or 4 %: almost flat ground. Aircraft noise is not a layer in the studio: it is checked in the cantonal data.

With the example values, the 1,000 m² plot allows 800 m² of countable floor area with an AZ of 0.8, or 2,400 m³ above ground with a BMZ of 2.4.

3 common pitfalls before buying or costing a plot in the canton of Zurich

Applying the wrong ratio

One Zurich municipality governs density by the AZ, another by the BMZ, a third adds an ÜZ or a Freiflächenziffer. Calculating with the AZ where the BZO sets a BMZ, or the other way round, distorts the capacity of the land: read the municipality's BZO first.

Reading a BZO that is being adapted

Municipalities adapt their BZO to the harmonised terms according to a cantonal timetable, with extensions. During the transition, the definitions of height and reference ground level may change: check which version applies on the date of the permit application.

Forgetting inventories and central zones

Kernzonen (core zones), objects listed in protection inventories, ISOS in old centres: these constraints are not in the studio's layers and may impose volumes, roofs and materials. Consult the GIS-Browser and the municipality before fixing the project.

How to use it in 3 steps: analysing a Zurich plot with the Geo-Scanner

  1. Find the plot
    Enter the address, the plot number with the municipality, the EGRID or the LV95 coordinates. The card shows the number, the EGRID, the municipality and the calculated area, for guidance.
  2. Read ÖREB, noise and terrain
    Open the PLR, cadastre and zone section and the link to the canton's ÖREB extract. Display the road and rail noise, groundwater and hazard layers, then draw a slope profile across the plot.
  3. Recalculate with the BZO
    Copy the report or export the CSV, ask for the BZO in force and identify the ratio it sets (AZ, BMZ, ÜZ). Recalculate the capacity with the real value and the definitions of the PBG and the ABV.

Open the free studio →

What the free Geo-Scanner does not do for a plot in the canton of Zurich

The studio does not read the content of the ÖREB cadastre restrictions: it refers you to the canton. It does not display groundwater protection zones, the cantonal hazard maps, the noise sensitivity level, aircraft noise, protection inventories, ISOS, easements or building lines. It calculates neither the AZ nor the BMZ, carries out no structural calculation and gives no prices.

Portail chantier is then used to gather the project file and share it with the client, site by site. The Art Construction ERP costs the bid, tracks the site and the SME's invoicing and prepares the site opening sheet. Neither replaces the opinion of the municipality or an architect.

Frequently asked questions

Which law governs building in the canton of Zurich?

The Planning and Building Act (PBG) and the General Building Ordinance (ABV). The rules for each site are in the municipality's Bau- und Zonenordnung (BZO).

Does the canton of Zurich apply the IVHB?

It has not joined the concordat, but it adopts its terms, except the Geschossflächenziffer. The Ausnützungsziffer is kept, and municipalities adapt their BZO according to a cantonal timetable.

What is the difference between the AZ and the BMZ?

The AZ relates a floor area to the plot area; the BMZ relates a built volume to that area. The municipality's BZO says which one applies and how to count the areas or volumes.

Does the Geo-Scanner replace the cantonal GIS-Browser?

No. It gives a first reading with federal data and the link to the ÖREB cadastre. The GIS-Browser and the municipality remain the reference for the BZO, the inventories and the cantonal data.