In the canton of Zug, planning and building are governed by the Planning and Building Act (Planungs- und Baugesetz, PBG) of 26 November 1998 and its ordinance (Verordnung zum Planungs- und Baugesetz, V PBG), fully revised and in force since 1 January 2019. On that date, the canton adopted the terms of the intercantonal agreement harmonising building terms (IVHB), with a reservation: municipalities may keep the plot ratio (Ausnützungsziffer, AZ) to govern density. Under the V PBG, the AZ is the ratio between the countable floor area of the buildings and the countable land area; the V PBG specifies which areas count. The values are in each municipality's building and zoning regulations (Bau- und Zonenordnung, BZO).
The Art Construction Geo-Scanner prepares this reading in the browser. You find the plot by address, number and municipality, EGRID or coordinates; the card shows the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the Zug ÖREB cadastre, with the link to the cantonal cadastre and to the PDF extract when it is published. The altitude, the slope profile and the federal road and rail noise, groundwater and hazard layers complete the card. The cantonal ZugMap mapping system remains the reference for the zoning plan and the cantonal data.
Worked example: plot in a residential zone in the canton of Zug
A 650 m² plot in a low-rise residential zone, close to a main road and a railway line. The AZ is an example value: the actual value is in the municipality's BZO, and the areas to count are in the V PBG.
| Item | Value | Calculation or source |
|---|---|---|
| Countable land area | 650 m² | Geometry read in the Geo-Scanner, indicative |
| Ausnützungsziffer AZ (example) | 0.45 | Example value from the municipal BZO |
| Maximum countable floor area | 292.50 m² | 650 × 0.45 |
| Example brief | 2 × 140 m² | 280 m², below the limit of 292.50 m² |
| Remaining reserve | 12.50 m² | 292.50 − 280 |
| Slope profile over 40 m | 6 % | Difference in height of 2.40 m ÷ 40 m |
With an example AZ of 0.45, the permitted countable floor area is 650 × 0.45 = 292.50 m². The example brief provides for two units of 140 m², or 280 m²: 12.50 m² remain in reserve. This margin is thin: under the V PBG rules on countable areas, a basement or attic room counted by mistake can push the project over the AZ. The calculation is redone with the exact definition and the architect's plans.
The Geo-Scanner shows modelled day and night road and rail noise exposure: the sensitivity level assigned to the zone is set by the municipality, and measures may be required for noise-sensitive rooms. The profile gives a 2.40 m difference in height over 40 m, or 6 %: almost flat ground, where access and any groundwater matter more than the slope.
With the example AZ, the 650 m² plot allows 292.50 m² of countable floor area; a 280 m² brief leaves a margin of 12.50 m².
3 common pitfalls before buying or costing a plot in the canton of Zug
Counting areas under an old rule
Before 2019, municipalities could set their own rules for calculating areas in their BZO. The revised V PBG replaces them: a calculation based on old regulations or on a habit from another canton can overestimate the possible living area.
Neglecting the noise of transport routes
The canton is crossed by busy roads and railway lines. The studio shows the modelled exposure; the zone's sensitivity level and the protection requirements are checked with the municipality before fixing the layout of the dwellings.
Forgetting the groundwater and the shorelines
Near a lake or a watercourse, the reserved water area and the groundwater protection zones limit basements and building positions. The studio shows the groundwater body and the nearest watercourse, not these cantonal zones.
How to use it in 3 steps: analysing a plot in Zug with the Geo-Scanner
- Find the plot
Enter the address, the plot number with the municipality, the EGRID or the LV95 coordinates. The card shows the number, the EGRID, the municipality and the calculated area, for guidance. - Read ÖREB, noise and water
Open the PLR, cadastre and zone section and the link to the canton's ÖREB extract. Display the road and rail noise layers, the groundwater body and the nearest watercourse, then draw a slope profile. - Recalculate with the BZO and the V PBG
Copy the report or export the CSV, ask for the municipality's BZO and zoning plan, then recalculate the AZ with the countable areas of the V PBG before any decision.
What the free Geo-Scanner does not do for a plot in the canton of Zug
The studio does not read the content of the ÖREB cadastre restrictions: it refers you to the canton. It does not display groundwater protection zones, the cantonal hazard maps, the noise sensitivity level, easements or building lines. It does not calculate the AZ, carries out no structural calculation and gives no prices.
Portail chantier is then used to gather the project file and share it with the client, site by site. The Art Construction ERP costs the bid, tracks the site and the SME's invoicing and prepares the site opening sheet. Neither calculates the AZ or replaces the opinion of the municipality.
Frequently asked questions
Which law governs building in the canton of Zug?
The Planning and Building Act (PBG) of 26 November 1998 and its ordinance (V PBG), revised in 2019. Each municipality supplements them with its Bau- und Zonenordnung (BZO) and its zoning plan.
Does Zug apply the IVHB?
Yes, the canton adopted the IVHB terms on 1 January 2019, with a reservation that allows municipalities to keep the Ausnützungsziffer instead of the Geschossflächenziffer.
Which areas count in the AZ?
The V PBG sets the countable floor areas and the countable land area. Borderline cases (basements, attics, ancillary rooms) are checked in the text in force and with the municipality.
Does the Geo-Scanner replace ZugMap?
No. It gives a first reading with federal data and the link to the canton's ÖREB cadastre. ZugMap and the municipality remain the reference for the zoning plan and the cantonal data.