Plot feasibility in Geneva: PLR cadastre, LCI and floor area ratio

Before buying land or submitting a bid in Geneva, locate the plot, open its PLR extract and base the floor area calculation on solid ground.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In Geneva, building rules are mainly cantonal. The act on buildings and miscellaneous installations (LCI, loi sur les constructions et les installations diverses, RSG L 5 05) and its implementing regulations (RCI) set building envelopes, distances and, in zone 5 (detached houses), the ratio between floor area and plot area. The act implementing the federal spatial planning act (LaLAT, RSG L 1 30) defines the zones and density indices, such as the land-use index (IUS, indice d’utilisation du sol). Municipalities have no building regulations comparable to those of other cantons: the canton adopts the zoning plans and the local neighbourhood plans (PLQ, plans localisés de quartier).

The Art Construction Geo-Scanner locates the plot by address, number and municipality, EGRID or LV95 coordinates. Its sheet shows the number, the EGRID, an area calculated from the geometry, the status of the Geneva PLR cadastre (RDPPF, public-law restrictions on landownership) with the link to the canton’s PDF extract when it is published, the harmonised building zone (indicative ARE data), modelled exposure to road and rail noise, the altitude and the slope profile. The official Geneva data are then consulted on the SITG geoportal (Système d’information du territoire à Genève).

Worked example: floor area of a plot in zone 5 in Geneva

A contractor is studying, for a client, a plot in the canton’s zone 5, where a detached house is to be demolished and replaced. The Geo-Scanner gives a calculated area of 1,200 m²; the land register extract ordered afterwards shows 1,184 m². The calculation below applies the 25 % base ratio provided by article 59 LCI for zone 5; the exemptions in paragraph 4 are subject to conditions to be checked with the canton.

Analysis of a plot in zone 5 in Geneva (example values)
ItemSourceValueRemark
Plot areaGeo-Scanner (geometry)1,200 m²indicative
Plot areaofficial extract1,184 m²binding
Zone 5 floor area ratioart. 59 LCI, base25 %exemptions to check
Permitted floor area1,184 × 0.25296 m²legal basis
Difference if starting from 1,200 m²300 − 2964 m²not to be promised
Average ground slopeprofile: 1.5 m over 30 m5 % (2.9°)altitude 412 m

The permitted floor area is calculated on the official area: 1,184 m² × 0.25 = 296 m². Starting from the area calculated by the Geo-Scanner would have given 1,200 m² × 0.25 = 300 m², i.e. 4 m² too much. A project drawn to the limit of the ratio must therefore be revised. The slope profile, drawn over 30 m between the access and the back of the plot, shows 1.5 m of height difference: 1.5 ÷ 30 = 5 %, i.e. about 2.9°.

These values help you ask the right questions: applicable ratio, possible exemption under article 59 paragraph 4 LCI and its conditions, boundary distances. A 5 % slope remains moderate; the surveyor and the engineer will confirm access and earthworks.

On the official area of 1,184 m², the zone 5 legal basis gives 296 m² of floor area; any exemption is checked with the canton before costing a larger project.

3 frequent pitfalls before buying or costing a plot in Geneva

Counting on a density exemption as if it were a right

Article 59 paragraph 4 LCI allows the base ratio in zone 5 to be exceeded under conditions, and the canton has restricted these exemptions in the past. Have the current practice confirmed before any commitment.

Ignoring a local neighbourhood plan or a development zone

In development zones, building generally goes through a local neighbourhood plan adopted by the canton, with its own siting and building rights. The harmonised zone shown by the Geo-Scanner does not show this: consult the SITG and the PLR extract.

Overlooking noise and easements

Along major roads and railway lines, noise exposure may require construction measures. The Geo-Scanner shows modelled exposure, not the sensitivity level assigned to the zone. Easements registered in the land register do not appear in the PLR cadastre: ask for the land register extract.

How to analyse a plot in Geneva in 3 steps

  1. Locate the plot and read its sheet
    Enter the address, the plot number with the municipality or the EGRID. Note the indicative area, the harmonised zone and the status of the canton’s PLR cadastre.
  2. Open the PLR extract and the SITG
    Follow the link to the plot’s PLR extract when the canton publishes it, then consult the SITG geoportal for the land-use zone, any PLQ and the other restrictions.
  3. Measure the slope and export
    Draw a profile between the access and the furthest point, note the altitude, then copy the report or export the CSV to add it to your study file.

Open the free studio →

What the Geo-Scanner does not do for a plot in Geneva

The Geo-Scanner does not read the content of the PLR restrictions: it refers you to the canton’s cadastre and extract. It does not show PLQs, cantonal groundwater protection sectors, detailed hazard maps, the noise sensitivity level or easements. It does not calculate any floor area ratio or index: the calculation above is done by hand. Searches go to the public swisstopo API and nothing is stored.

To follow the project afterwards, Portail chantier gathers the file (extracts, plans, permits) and shares it with the client. ERP Art Construction costs bids, tracks the site and the invoicing, and opens each site with its own sheet.

Frequently asked questions

Which act sets the building rules in Geneva?

The LCI (act on buildings and miscellaneous installations) and its implementing regulations, the RCI, set the building rules. Zones and density indices fall under the LaLAT. Check the text in force in the canton’s official collection.

How much can be built on a plot in zone 5?

The LCI provides a 25 % base ratio between floor area and plot area in zone 5. Exemptions exist under conditions; their current practice is checked with the competent cantonal office.

Where can I get the PLR extract for a plot in Geneva?

The Geo-Scanner shows the status of the canton’s PLR cadastre and offers the link to the plot’s PDF extract when it is published. The SITG geoportal also gives access to the official data.

Does the Geo-Scanner replace a surveyor or an architect?

No. The area, the altitude and the slope are indicative. They help prepare the questions and the bid; the surveyor’s plan, the official extract and the architect’s opinion are binding.