Plot feasibility in the canton of Jura: PLR cadastre, LCAT and gross land-use index

In the Jura, the IBUS does not only set a ceiling: it targets a minimum density. Check both limits before buying or costing a project.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

The canton of Jura governs planning through the act on building and spatial planning (LCAT, loi sur les constructions et l’aménagement du territoire) of 25 June 1987 and its implementing ordinance (OCAT); a full revision of the LCAT has been launched, so the version in force must be checked. Each municipality has a local land-use plan with its zoning plan and its municipal building regulations. Density is measured by the gross land-use index (IBUS, indice brut d’utilisation du sol): the cantonal services provide a calculation sheet and state that a project outside the target values allowed for the zone requires a reasoned exemption request.

The Geo-Scanner locates the plot by address, number and municipality, EGRID or coordinates. Its sheet shows the area calculated from the geometry, the status of the Jura PLR cadastre (RDPPF, public-law restrictions on landownership), managed by the cadastre and geoinformation section, with the link to the extract when it is published, the ARE harmonised building zone, the groundwater body, aquifer vulnerability and the surface runoff hazard. The cantonal geoportal geo.jura.ch then publishes the official geodata.

Worked example: checking the IBUS of a two-house project in the Jura

A 1,000 m² plot in a residential zone, on which a client wants to build two houses of 190 m² of floor area each. The zone’s IBUS target values are taken here as 0.40 and 0.60, example values: the real values are in the rules applicable to the zone and in the municipal regulations.

Checking the IBUS of a project, canton of Jura (example values)
ItemCalculationValue
Relevant land areaassumption = plot1,000 m²
Minimum target floor area1,000 × 0.40400 m²
Maximum floor area1,000 × 0.60600 m²
Project floor area2 × 190380 m²
Project IBUS380 ÷ 1,0000.38
Area missing for the target value400 − 38020 m²

With 2 × 190 = 380 m² of floor area on 1,000 m², the project IBUS is 380 ÷ 1,000 = 0.38. It stays below the lower target value of 0.40: 20 m² are missing to reach it. The project must then either be enlarged or be the subject of a reasoned exemption request, according to cantonal practice. A third unit or a 20 m² extension brings the project back within the range, without exceeding the 600 m² maximum.

The Geo-Scanner gives the indicative area and the altitude; the profile drawn over 40 m shows 2 m of height difference, i.e. 2 ÷ 40 = 5 % (about 2.9°). The exact relevant land area, which may exclude certain parts of the plot, is taken from the official extract and the IVHB (AIHC) definitions adopted by the canton, to be checked in the LCAT and the OCAT.

With an IBUS of 0.38 against an example minimum target of 0.40, the two-house project is 20 m² short: the minimum density is checked before submitting the bid.

3 frequent pitfalls before buying or costing a plot in the Jura

Looking only at the maximum index

IBUS target values include a minimum: a project that is not dense enough may be refused or require a reasoned exemption. Check both limits from the sketch stage.

Overlooking karst groundwater

The Jura’s limestone subsoil makes groundwater vulnerable. The Geo-Scanner shows the water body and regional vulnerability; the cantonal groundwater protection zones and sectors, which may prohibit certain excavations or tanks, are read in the PLR cadastre.

Relying on an outdated version of the act

The LCAT and its ordinance are being revised. Check the version in force in the official collection of Jura laws and the current municipal regulations before setting a permit schedule.

How to use it in 3 steps for a plot in the canton of Jura

  1. Locate the plot and read its sheet
    Search for the plot by address, number with the municipality or EGRID. Note the indicative area, the harmonised zone and the PLR cadastre status.
  2. Check water and surface runoff
    Read the groundwater body, aquifer vulnerability and surface runoff hazard, then open the PLR extract and the cantonal geoportal for the protection zones.
  3. Draw the profile and export
    Draw a profile between the access and the back of the plot, note altitude and slope, then copy the report or export the CSV.

Open the free studio →

What the Geo-Scanner does not do for a plot in the Jura

The Geo-Scanner does not read the content of the PLR restrictions and does not show cantonal groundwater protection zones, the detailed hazard map, the noise sensitivity level or easements. It does not calculate the IBUS: the check is done by hand with the cantonal sheet. Searches go to the public swisstopo API and nothing is stored.

For the next stage of the project, Portail chantier gathers the file (extracts, plans, permits) and shares it with the client. ERP Art Construction costs bids, tracks the site and the invoicing, and opens each site with its own sheet.

Frequently asked questions

Which act applies to building in the canton of Jura?

The act on building and spatial planning (LCAT) and its ordinance (OCAT), completed by the local land-use plan and the municipal building regulations. As a revision is under way, check the version in force.

What is the IBUS in the Jura?

The gross land-use index relates the sum of floor areas to the relevant land area. The canton sets target values per zone; outside these values, a reasoned exemption is required.

Where can I get the PLR extract for a plot in the Jura?

The PLR cadastre is kept by the cadastre and geoinformation section. The Geo-Scanner shows its status and offers the link to the plot’s extract when it is published.

Does the Geo-Scanner show groundwater protection zones?

No. It shows the groundwater body and regional vulnerability. The protection zones and sectors, defined by the canton, are consulted in the PLR cadastre and on the cantonal geoportal.