Free software · 100% in your browser · no data sent

Plot feasibility in the canton of Uri: ÖREB cadastre, PBG, RPBG and the Ausnützungsziffer

In a mountain canton, the first question is not always the buildable area: it is the slope, the natural hazards and the access. The Geo-Scanner locates them before the site visit.

Open the free studio →

Free, no account: only your searches go to the public swisstopo API, nothing goes to Art Construction.

In the canton of Uri, planning and building are governed by the Planning and Building Act (Planungs- und Baugesetz, PBG) of 13 June 2010, in force since 1 January 2012, and its implementing regulations (Reglement zum Planungs- und Baugesetz, RPBG). The canton has joined the intercantonal agreement harmonising building terms (IVHB, AIHC in French); however, it has not adopted the floor area ratio (Geschossflächenziffer) and lets municipalities use the plot ratio (Ausnützungsziffer, AZ), according to the RPBG. The specific values are in the municipal building and zoning regulations (Bau- und Zonenordnung, BZO) and in the zoning plan.

The Art Construction Geo-Scanner prepares this reading in the browser. You search for the plot by address, number and municipality, EGRID or coordinates; the card gives the number, the EGRID, the area calculated from the geometry, the building zone harmonised at Swiss level and the status of the Uri ÖREB cadastre, with the link to the cantonal cadastre and to the PDF extract when it is published. For land in a valley or on a slope, the federal avalanche, rockfall and run-off layers, the altitude and the slope profile matter as much as the zone. The canton of Uri geoportal remains the reference for the zoning plan and the cantonal hazard maps.

Worked example: sloping plot in a residential zone in the canton of Uri

A 700 m² plot in a residential zone, on an alluvial fan at the edge of a valley, with a stream nearby. The AZ is an example value: the actual value and the way areas are counted are in the municipality's BZO.

Reading the plot and calculating the countable floor area (example values)
ItemValueCalculation or source
Plot area700 m²Geometry read in the Geo-Scanner, indicative
Ausnützungsziffer AZ (example)0.5Example value from the municipal BZO
Maximum countable floor area350 m²700 × 0.5
Strip along the stream (example)84 m²Assumption: 14 m × 6 m, to be confirmed by the municipality
Remaining area for the building position616 m²700 − 84
Slope profile over 30 m22 %Difference in height of 6.60 m ÷ 30 m

With an example AZ of 0.5, the permitted countable floor area is 700 × 0.5 = 350 m². The Geo-Scanner shows a stream a few metres away: the reserved water area is set by the canton and the municipality, and we take it here as an example strip of 84 m², which leaves 616 m² for the building position. Depending on the municipal rules, this strip may or may not count in the relevant land area: the question is put to the municipality before fixing the brief.

The profile drawn in the studio gives a 6.60 m difference in height over 30 m, an average slope of 22 %. For the contractor, this means stepped earthworks, retaining structures and a site access to be studied carefully, probably with equipment suited to steep slopes. The indicative avalanche and rockfall layers are read with their legend; the cantonal hazard map decides.

With the example AZ, the 700 m² plot allows 350 m² of countable floor area, on a building area of about 616 m² and ground with a 22 % slope.

3 common pitfalls before buying or costing a plot in the canton of Uri

Relying only on the federal hazard layers

SilvaProtect and the run-off hazard map are national indications. In an alpine valley, the cantonal hazard map may place the plot in a hazard zone and require building measures or rule out certain rooms: consult it on the cantonal geoportal or at the municipality.

Calculating with a different area definition

Uri has joined the IVHB but keeps the AZ instead of the Geschossflächenziffer. The areas to count are read in the RPBG and the municipality's BZO; a habit picked up in a neighbouring canton can distort the calculation of the possible living area.

Underestimating site access

Narrow road, steep slope, weight limit or winter closure: the studio shows the nearest road and its distance, but not the local restrictions. Check on site and with the municipality before deciding on the lifting equipment and the programme.

How to use it in 3 steps: analysing a plot in Uri with the Geo-Scanner

  1. Find the plot
    Enter the address, the plot number and municipality, the EGRID or the LV95 coordinates. The card shows the number, the EGRID, the municipality and the calculated area, for guidance.
  2. Read the terrain and the hazards
    Display the avalanche, rockfall and run-off layers with their legend, note the nearest watercourse, then draw a slope profile between the bottom and the top of the plot to get the difference in height and the slope.
  3. Confirm with the canton and the municipality
    Open the link to the ÖREB cadastre and the PDF extract, copy the report or export the CSV, then ask for the BZO, the zoning plan and the cantonal hazard map. Recalculate the permitted area with the real AZ.

Open the free studio →

What the free Geo-Scanner does not do for a plot in the canton of Uri

The studio does not read the content of the ÖREB cadastre restrictions: it refers you to the canton. It does not display detailed cantonal hazard maps, groundwater protection zones, the reserved water area, the noise sensitivity level, easements or building lines. It does not calculate the AZ, carries out no structural calculation and determines no snow load: under the SIA 261 standard, that is the engineer's job. It gives no prices.

Portail chantier is then used to gather and share the project file with the client, site by site. The Art Construction ERP costs the bid, tracks the site and the SME's invoicing, and produces the site opening sheet. Neither calculates ratios or replaces the authorities' opinion.

Frequently asked questions

Which law governs building in the canton of Uri?

The Planning and Building Act (PBG) of 13 June 2010 and its implementing regulations (RPBG). Each municipality supplements them with its Bau- und Zonenordnung (BZO) and its zoning plan.

Does Uri use the Ausnützungsziffer?

Yes, according to the RPBG, municipalities may continue to use the Ausnützungsziffer: the canton joined the IVHB without adopting the Geschossflächenziffer. The value and the calculation method are read in the municipality's BZO.

Are the avalanche hazards shown enough to buy?

No. They are national SilvaProtect indications, for guidance only. The canton's hazard map and the opinion of the municipality or a specialist decide on the measures to take and on what can actually be built.

What should I do with the plot area shown?

It is calculated from the official survey geometry and is used to prepare the calculations. For a purchase or a permit application, the area in the land register extract is binding.