Obwalden joined the intercantonal agreement harmonising building terminology (IVHB in German, AIHC in French) in 2012, and the cantonal Baugesetz (Building Act) took over its definitions and measuring methods through an amendment that came into force on 1 January 2016. The land-use measures are therefore the floor area ratio (Geschossflächenziffer, GFZ), the building volume ratio (Baumassenziffer, BMZ) and the site coverage ratio (Überbauungsziffer, ÜZ); the former plot ratio (Ausnützungsziffer, AZ) has been dropped from cantonal law. The measuring details are in the building ordinance (Verordnung zum Baugesetz); the applicable value is in the municipality's building regulations and zoning plan.
The Art Construction Geo-Scanner prepares this work. Search by address, number and municipality, EGRID or LV95 coordinates; the result card shows the number, the EGRID, an indicative area, the status of the cantonal PLR cadastre with its link, the harmonised ARE building zone, the federal hazard indications, the altitude and a slope profile. In a canton of narrow valleys, mountain streams and steep slopes, these markers avoid discovering too late a slope or a watercourse that changes the project.
Worked example: analysing a plot in a residential zone in Obwalden
An 820 m² plot in a residential zone, at the foot of a slope in Obwalden, alongside a municipal road. The ratios below are example values: the actual value and the definition of the relevant area are in the municipal regulations and the Baugesetz.
| Item | Value | Calculation | Result |
|---|---|---|---|
| Plot area (Geo-Scanner, indicative) | 820 m² | plot geometry | 820 m² |
| Floor area ratio GFZ (example) | 0.60 | 820 × 0.60 | 492 m² |
| Site coverage ratio ÜZ (example) | 0.25 | 820 × 0.25 | 205 m² |
| Non-building strip along the road (example) | 4.00 m × 20.50 m | 4.00 × 20.50 | 82 m² |
| Ground slope (Geo-Scanner profile) | 9.0 m over 60.0 m | 9.0 ÷ 60.0 | 15 % |
The indicative area of 820 m² serves as a provisional basis. With an example floor area ratio of 0.60, the maximum relevant floor area is 820 × 0.60 = 492 m². The example site coverage ratio of 0.25 limits the relevant building footprint to 820 × 0.25 = 205 m². A 4.00 m strip along the road, over 20.50 m of plot frontage, removes 82 m² of possible footprint without changing the basis for calculating the ratios, to be checked in the municipal regulations.
The slope profile drawn in the Geo-Scanner gives a 9.0 m difference in height over 60.0 m, an average of 15 %. On such a slope, the relevant ground level, the facade heights and the retaining walls weigh on the project: the contractor allows for suitable earthworks and site access from the bid stage, to be confirmed by a surveyor's survey.
On this example plot, the most you can aim for is 492 m² of floor area and 205 m² of footprint, on ground with a 15 % slope: to be confirmed with the municipal regulations and the PLR extract.
3 common mistakes before buying a plot in Obwalden
Reasoning with the old plot ratio (AZ)
Since the IVHB definitions were written into the Baugesetz, the canton no longer provides for an Ausnützungsziffer. An old brochure or valuation quoting an AZ no longer matches the rules: ask the municipality for the applicable ratio and its current definition.
Neglecting the natural hazards of streams and slopes
Stream floods, debris flows, landslides and rockfall affect a large part of the territory. The federal layers in the Geo-Scanner are indicative; only the canton's hazard map says whether the plot lies in a hazard area and on what conditions you can build there.
Confusing the indicative area with the land register area
The area shown is calculated from the geometry published online. For a ratio calculation or a price per square metre, only the area in the land register extract is binding, and registered easements do not appear in the PLR cadastre.
How to use it in 3 steps for a plot in Obwalden
- Find the plot
Enter the address, the plot number with the municipality, the EGRID or LV95 coordinates. Check on the orthophoto and on the cantonal cadastral map that the highlighted outline matches the land you are after. - Read the card and open the PLR cadastre
Note the number, the EGRID, the indicative area, the harmonised building zone and the cantonal PLR status. Follow the link to the cantonal cadastre to read the public-law restrictions, then display the hazard and noise layers with their legend. - Measure the slope and export
Draw a profile between the low point and the high point of the plot: length, difference in height and average slope are displayed. Copy the report or export the CSV for your file, then calculate the ratios with the values from the municipal regulations.
What the free Geo-Scanner does not do in Obwalden
The Geo-Scanner does not read the content of PLR restrictions: it refers you to the cantonal cadastre. It does not display the cantonal hazard map, groundwater protection zones, the noise sensitivity level, ISOS, easements or building lines. It calculates no land-use ratio, no snow load and no structural sizing. Nothing is stored.
Portail chantier brings the project file together (extracts, plans, permits) and shares it with the client. ERP Art Construction is used for costing, site tracking and invoicing for the SME, with a site opening sheet. Neither of these tools replaces a specialist's legal analysis.
Frequently asked questions
Which land-use ratios apply in Obwalden?
The Baugesetz has taken over the IVHB definitions: floor area ratio (GFZ), building volume ratio (BMZ) and site coverage ratio (ÜZ). The municipality chooses the ratios and their values in its building regulations.
Has the canton of Obwalden joined the IVHB (AIHC)?
Yes. The cantonal parliament decided to join in 2012, and the definitions of the agreement entered the Baugesetz and its ordinance on 1 January 2016. Check the version in force in the canton's collection of laws.
Where can I get the official PLR extract for an Obwalden plot?
From the cantonal PLR cadastre, which the Geo-Scanner opens through a link from the plot card. The official extract is binding; the information in the Geo-Scanner is indicative.
Does the Geo-Scanner show whether my plot is in a hazard zone?
It displays federal indications (run-off, avalanches, rockfall) for guidance only. The detailed hazard map is drawn up by the canton: consult it before any purchase or bid.