Quote template for masonry (CFC 211): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 211 covers foundations, ground slabs, reinforced concrete, formwork, reinforcement, floor slabs and brick or block masonry for load-bearing structures. In Vaud, the employer contributions used are 34.8% of gross pay, plus CHF 616 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 211: Masonry & structural work

CFC 211 covers foundations, ground slabs, reinforced concrete, formwork, reinforcement, floor slabs and brick or block masonry for load-bearing structures. Reference collective agreement in the Studio: CN (National Collective Agreement, main construction trades). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

For CFC 211, concrete volumes are commonly established per m³, formwork and masonry per m², and reinforcement per kg or per tonne. According to the CAN standard item catalogue and the standards of the profession, large box-outs, rebates or precast elements are often settled separately or per piece. The rules on measuring openings as solid, defined in the SIA series of standards for the trade, set the precise deductions for slab openings and other openings. Agreeing these measurement principles with site management from the offer stage avoids disputes.

Data sheet for item CFC 211
ItemValue in the Studio
CFC code211
TitleMasonry & structural work
Reference collective agreementCN (National Collective Agreement, main construction trades)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for masonry

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
112Demolition & deconstructionm³Quote CFC 112
201Earthworks & excavationm³Quote CFC 201

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship between the contractor and the client, provided that the contract expressly declares it applicable. For structural work, it structures the formal procedure for acceptance of the work, starts the two-year defects notification period and specifies how defects are to be notified. It also governs the rules for the final account drawn up by measurement on the basis of the quantities actually executed, offering a clear framework if the drawings are changed.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

On structural work sites, the contract frequently provides for a retention on the monthly interim payments and on the final account to cover proper execution of the work. In the tool, this retention can be set freely from 0 to 10%. Depending on the agreements made with the client, this blocked sum is released at the end of the agreed period or replaced on acceptance by an equivalent bank guarantee. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 6.2% of gross pay for the Main construction trades CN profile in the Studio. For an employee earning CHF 6'350 a month, that is CHF 393.70 a month at your expense, before a single hour has been worked. This premium is part of the 34% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of masonry

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified bricklayer (class Q)” profile earns CHF 6'350 a month, i.e. CHF 36.08 over 176 paid hours. Once charges of 34.8% (Vaud) and CHF 616 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 67.97, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseen work not described in the initial specification, such as additional earthworks, manual underpinning or late drilling of openings, is carried out as daywork. The contractor must have each daywork sheet signed by site management within the time allowed. Staff hours, wear on plant, transport and the supplies consumed are generally invoiced in addition, at the rates agreed in the contract.

Reference daywork rates in the Studio, Main construction trades CN (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Foreman / site supervisor (class V)7'250 CHF122.00
Experienced qualified bricklayer (class Q)6'350 CHF108.00
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00
Skilled worker / federal certificate holder (class B)5'650 CHF96.00
Labourer / site assistant (class C)5'100 CHF88.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified bricklayer (class Q)” profile goes from CHF 108.00/h in Vaud to CHF 120.95/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for masonry (CFC 211)

How do you secure the calculation of the reinforcement ratio in a quote for masonry and structural work?

When the civil engineer’s final drawings have not yet been provided at tender stage, the contractor must state a clear assumption about the reinforcement ratio per cubic metre of reinforced concrete. State expressly in the remarks of your quote the quantity of steel assumed by default, referring to the bar schedules still to come. Any excess found during execution will then be covered by a variation validated by site management.

Which method should be used to estimate the cost of formwork for slabs and walls?

Standard surfaces should be separated from particular areas that require manual cutting or high-level propping. Take into account the time for erection, striking, cleaning and applying release oil, as well as the foreseeable number of reuses of the equipment. For raw or fair-faced concrete, it is useful to include the supply of new panels and the extra care needed to align the joints and the ties.

How should crane and site installation requirements be handled in the quote?

The crane, the concrete skips, the storage of materials and the site cabins must be shown as separate items in the quote, either as a lump sum or per month of use. If the site is cramped or shared with other trades, specify clearly the services included, such as erection, dismantling, crane foundations and temporary connections, so that you do not bear alone the costs of a prolonged standstill.

How do you manage the extra costs of concreting in cold or hot weather?

Extreme weather conditions may require special measures according to the applicable rules, such as the use of antifreeze admixtures, hot water, insulating sheeting or curing compounds against rapid evaporation. If these services do not appear in the basic specification, state in your offer that they will be subject to prior agreement with site management and to additional remuneration in accordance with the contractual provisions.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.