Collective agreements (CLA, CN) and social charges in the canton of Vaud
In the canton of Vaud, your quotes are best built on a sound grasp of the collective agreements in force. Structural work remains governed nationwide by the National Collective Agreement for the main construction industry in Switzerland (CN). For finishing trades such as plastering, painting, joinery, tiling or floor coverings, the collective labour agreement for the finishing trades of French-speaking Switzerland (CCT-SOR) generally applies. The technical trades, in particular sanitary installations, heating, ventilation or electrical work, come under separate sector agreements. Because Vaud is a border canton, joint inspections of working conditions and of the hiring of posted or cross-border workers are frequent. It is often worth checking your situation with the joint committee for your trade.
In the Studio, the regional coefficient applied to the base daywork rate is 0%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Vaud ranks 15th, on a scale running from −7% to +15%. The employer contributions used are 34.8% for structural work and 25.8% for the finishing trades, including cantonal family allowances (3.4%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | 0% |
| Family allowances (CAF) of the canton | 3.4% |
| Employer contributions, structural work (CN) | 34.8% |
| Employer contributions, finishing trades | 25.8% |
| Rank among the 26 cantons (coefficient) | 15 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Vaud |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 122.00 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 108.00 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 102.00 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 96.00 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 88.00 |
| Profile | Average gross monthly pay | Reference base (VD) | Vaud |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 79.00 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Vaud” column multiplies it by 1 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Vaud
Pricing work in the canton of Vaud means allowing for very varied site constraints. In dense built-up areas, erecting scaffolding, setting down skips and temporarily occupying public land require prior municipal permits as well as access logistics adapted to restricted parking. On the shores of Lake Geneva, direct exposure to wind and the level of humidity often affect the drying times of screeds or façades. In the Alpine and pre-Alpine areas, sites at altitude have a shorter working season because of snow and frost, and involve complicated journeys on winding roads. These physical factors determine the rotation of deliveries, the pace of your teams and the sizing of your site installations.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 25.8% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.78 per hour, before overheads and margin. The daywork rate of CHF 96.00/h therefore leaves CHF 35.22 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Lausanne, Yverdon-les-Bains, Montreux and in the canton of Vaud
When preparing a construction quote in Lausanne or elsewhere in the canton, the precise geographical location of your work has a direct effect on your overheads and your travel times. Whether your contract is in Yverdon-les-Bains, Montreux, Nyon, Vevey, Renens, Morges, Pully, Aigle, Villeneuve or Payerne, the layout of the municipality, its altitude, ease of access for heavy goods vehicles and any road-use charges make your real costs vary. Studio Devis Suisse calibrates its guiding parameters on the canton of Vaud, while leaving you free to adjust your services and your supplies to the local features of each project.
- Lausanne
- Yverdon-les-Bains
- Montreux
- Nyon
- Vevey
- Renens
- Morges
- Pully
- Aigle
- Villeneuve
- Payerne
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Lausanne | +5% | 100.80 | 113.40 |
| Nyon/Morges | +5% | 100.80 | 113.40 |
| Montreux/Vevey | +3% | 98.90 | 111.25 |
| Villars | +10% | 105.60 | 118.80 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Vaud
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Vaud
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Vaud
How should the weather be taken into account for a site at altitude in the canton of Vaud?
Altitude means a shorter period for outdoor work, a risk of early bad weather and longer drying times for concrete or renders. State in your quotes the conditions for interruption under SIA standard 118, allow for the cost of reinforced sheeting or temporary heating, and agree with site management on a schedule that takes the winter periods into account, in order to avoid unjustified penalties.
What costs should be anticipated for work in a town centre in Vaud?
Sites in a dense urban fabric generate costs linked to the use of public land. Allow in your pricing for the permit procedures for scaffolding, paid parking for company vehicles, the time slots set for deliveries and the management of waste skips. These logistical constraints reduce daily output and must be included in the site installations or passed on in the unit prices.
What effect do lakeside wind and humidity have on the application of materials?
The immediate proximity of the lakes creates variations in humidity and air currents that affect the setting of mortars, adhesives or exterior paints. In line with manufacturers’ recommendations and the CAN standard item catalogue, it is prudent to adjust labour times, include suitable façade protection and agree contractually on the permissible application windows, in order to prevent the early appearance of aesthetic or structural defects.
How should the use of posted or cross-border staff be organised in quotes?
Companies working on sites in Vaud do well to keep a close eye on the applicable collective agreements and the rules on posted workers. Minimum wages, travel allowances and social charges form a basis of calculation that calls for precision. Ask the joint committee concerned in order to protect your company against a back-payment claim and to draw up a quote in line with local professional practice.
Price another trade in the canton of Vaud
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)