3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Glarus (GL)

Canton of Glarus · Daywork −1% · CN and sector agreements

Construction quote in the canton of Glarus: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Glarus at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Glarus, the Studio applies a regional coefficient of −1% to the reference daywork rate, and employer contributions of 33.3% for structural work and 24.3% for the finishing trades, of which 1.9% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Glarus

In the canton of Glarus, structural work sites fall under the National Collective Agreement for the main construction industry in Switzerland (CN). By contrast, the CCT-SOR does not apply in this canton, as it is reserved for French-speaking Switzerland. For the finishing trades, building services and the decorating trades, working and hiring conditions depend on sector agreements, most often regional, cantonal or intercantonal for German-speaking Switzerland. It is often useful to enquire with the competent joint committee to check the rules in force. In our costing tool, the bases of calculation use indicative profiles adapted to structural work or the finishing trades, incorporating the Glarus data for charges and family allowances.

In the Studio, the regional coefficient applied to the base daywork rate is −1%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Glarus ranks 19th, on a scale running from −7% to +15%. The employer contributions used are 33.3% for structural work and 24.3% for the finishing trades, including cantonal family allowances (1.9%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Glarus
ItemValue
Regional coefficient on the daywork rate−1%
Family allowances (CAF) of the canton1.9%
Employer contributions, structural work (CN)33.3%
Employer contributions, finishing trades24.3%
Rank among the 26 cantons (coefficient)19 /26
Daywork rates in the canton of Glarus, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Glarus
Foreman / site supervisor (class V)7'250 CHF122.00120.80
Experienced qualified bricklayer (class Q)6'350 CHF108.00106.90
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00101.00
Skilled worker / federal certificate holder (class B)5'650 CHF96.0095.05
Labourer / site assistant (class C)5'100 CHF88.0087.10
Daywork rates in the canton of Glarus, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Glarus
Finishing trades foreman (CCT-SOR)6'750 CHF106.00104.95
Experienced qualified tradesperson (class A)6'050 CHF96.0095.05
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0087.10
Skilled worker / federal certificate holder (class B)5'300 CHF85.0084.15
Finishing trades assistant (class C)4'850 CHF79.0078.20

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Glarus” column multiplies it by 0.99 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Glarus

Pricing a site in the canton of Glarus is best done by carefully taking into account the constraints of its Alpine environment. Variations in altitude often lead to a tight working calendar, in which early snow and frost can shorten the useful season for earthworks, concreting or outdoor work. Bringing plant, skips and materials along valleys that are sometimes deep and narrow requires suitable logistics, anticipating transport dimensions, temporary weight limits and restricted storage space on the plot. The management of rainwater and the safety measures on ground that is sloping or exposed to bad weather add to the preliminary installations. Site management must therefore take these topographical constraints into account from the bid stage in order to secure financial planning.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.3% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.11 per hour, before overheads and margin. The daywork rate of CHF 95.05/h therefore leaves CHF 34.94 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Glarus, Glarus Nord, Glarus Süd and in the canton of Glarus

To draw up an accurate quote in the canton of Glarus, whether the work is in Glarus, Glarus Nord or Glarus Süd, the actual location of the construction remains decisive. The relief of Glarus involves sharp disparities between the valley floor and the high areas, directly influencing workers’ travelling times, the transport costs of materials and the length of the site season. Our Studio Devis Suisse tool automatically calibrates the general parameters on the canton of Glarus, but it is up to you to adjust your forecasts for transport, unloading and temporary accommodation according to the exact municipality where you are working.

Cost difference by town, canton of Glarus (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Glarus−1%95.05106.90

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Glarus

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Glarus

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Glarus

How do I adjust travel costs in the canton of Glarus?

The layout of the Glarus valleys often lengthens journeys between the workshop and the site. You must include in your accounts not only the actual mileage, but also the teams’ effective travelling time in accordance with the applicable collective labour agreement. Also allow for any extra costs linked to unloading on narrow or sloping roads, which tie up more staff.

What retention should be entered under SIA standard 118?

SIA standard 118 provides for the possibility of applying a retention to the monthly interim statements, at a rate negotiated between the parties, generally adjustable from zero to ten per cent of the amount excluding VAT. This security, often covered by a bank or insurance guarantee, protects the client during the two-year period for notifying defects.

How should VAT be handled on a quote intended for a private client?

In Switzerland, the standard VAT rate is 8.1%. Your bid must show with full transparency the amounts excluding VAT per item or chapter, then summarise the total excluding VAT and the exact amount of VAT at 8.1%, ending with the final amount including VAT. This clarity is essential before any invoicing with a QR-bill.

What precautions should be taken for daywork?

Daywork generally relies on precise principles drawn from the sector agreements and from the usual contractual rules such as SIA standard 118. Before any work not covered by the lump sum or the unit prices, have the hourly daywork rate approved by site management. Draw up detailed daily sheets stating the qualification of the staff, the actual hours, and the machines and materials used.

Price another trade in the canton of Glarus

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.