Collective agreements (CLA, CN) and social charges in the canton of Aargau
For your sites in the canton of Aargau, the collective framework depends directly on the nature of the work carried out. Structural work is governed throughout Switzerland by the National Collective Agreement for the main construction industry (CN). The CCT-SOR, on the other hand, does not concern Aargau, since its scope is confined to French-speaking Switzerland. For the finishing trades and building services, employment relationships come under sector collective agreements, often negotiated at cantonal or regional level. You should therefore ask the competent joint committee to confirm the wage provisions in force. Our tool includes indicative reference profiles, distinguishing between structural work and the finishing trades, adapted to the parameters of the canton.
In the Studio, the regional coefficient applied to the base daywork rate is +3%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Aargau ranks 8th, on a scale running from −7% to +15%. The employer contributions used are 33.1% for structural work and 24.1% for the finishing trades, including cantonal family allowances (1.75%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | +3% |
| Family allowances (CAF) of the canton | 1.75% |
| Employer contributions, structural work (CN) | 33.1% |
| Employer contributions, finishing trades | 24.1% |
| Rank among the 26 cantons (coefficient) | 8 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Aargau |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 125.65 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 111.25 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 105.05 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 98.90 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 90.65 |
| Profile | Average gross monthly pay | Reference base (VD) | Aargau |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 109.20 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 98.90 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 90.65 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 87.55 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 81.35 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Aargau” column multiplies it by 1.03 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Aargau
Organising a site in Aargau is best based on careful management of the administrative and logistical aspects linked to its location. As this is a border canton, the regular presence of cross-border labour or posted workers calls for extra vigilance over compliance with local practice and over the inspections carried out by the joint committees or the supervisory authorities. On the operational side, coordination with site management and the municipal services is essential for obtaining permits to use public land, setting down skips and parking commercial vehicles. Take care also to anticipate traffic constraints around the main transit routes, to guarantee regular supplies without affecting rates of installation.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.1% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.02 per hour, before overheads and margin. The daywork rate of CHF 98.90/h therefore leaves CHF 38.88 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Aarau, Baden, Wettingen and in the canton of Aargau
The precise location of your work has a direct effect on overheads and travel times. Whether you are drawing up a bid for work in Aarau, Baden, Wettingen, Wohlen, Rheinfelden, Zofingen or Brugg, each municipality has different realities in terms of access, parking or altitude. The urban density of certain areas may call for specific safety measures under the applicable rules, while more outlying sites often change the delivery logistics. Our tool applies the basic parameters specific to the canton of Aargau, leaving you to adjust your travel surcharges to the exact address given by the client.
- Aarau
- Baden
- Wettingen
- Wohlen
- Rheinfelden
- Zofingen
- Brugg
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Aarau | +5% | 100.80 | 113.40 |
| Baden | +5% | 100.80 | 113.40 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Aargau
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Aargau
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Aargau
How do I draw up a tender that complies with the standards in Aargau?
To respond to invitations to tender in Aargau, it is worth structuring your pricing according to the CAN standard item catalogue drawn up by the CRB, if the specification so provides. Public or private tenders frequently refer to SIA standard 118, which governs the general conditions applicable to contracts for work. Take care to itemise your services excluding VAT, stating the statutory rate of 8.1% at the foot of the page, and issue your invoices in the form of a QR-bill.
Which regime applies to contractual retention?
Under the rules of SIA standard 118 or the special provisions of the contract for work, the client may provide for a retention, generally of between zero and ten per cent on each payment application. This sum guarantees proper execution of the work until acceptance without major defects. It can often be replaced by the lodging of a bank guarantee or an equivalent insurance guarantee.
How should payment for unforeseen work or variations be handled?
Any change to the order requested by site management must be covered by a written variation or a daywork sheet approved before operations begin. Under the applicable rules and the practice derived from SIA standard 118, services outside the initial quote are best measured by agreement between the parties or invoiced on the basis of daywork rates agreed when the contract was concluded.
Which safety rules should be reflected in the pricing of the site installation?
Under the safety rules in force derived from the Construction Work Ordinance (OTConst) and the SUVA guidelines, suitable measures must be provided for fall protection and for the layout of circulation routes. The cost of scaffolding, perimeter netting and collective protection must be clearly identified in your site installation items, failing which you will have to finance these indispensable measures out of your net margin on the work.
Price another trade in the canton of Aargau
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)