3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Zug (ZG)

Canton of Zug · Daywork +15% · CN and sector agreements

Construction quote in the canton of Zug: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Zug at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Zug, the Studio applies a regional coefficient of +15% to the reference daywork rate, and employer contributions of 33% for structural work and 24% for the finishing trades, of which 1.6% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Zug

On sites in the canton of Zug, the National Collective Agreement for the main construction industry applies to structural work, as it does throughout Switzerland. The CCT-SOR, on the other hand, does not concern the canton of Zug, since its scope is confined to French-speaking Switzerland. For the finishing trades and building services, employment relationships are governed by sector collective agreements, often negotiated at regional or cantonal level in German-speaking Switzerland. You should therefore check the wage provisions and customary practice with the competent joint committee for each trade. The tool includes reference profiles for structural work and the finishing trades, weighted by the cantonal parameters and the local social charges, in order to provide an indicative estimate to be validated against your agreement.

The canton of Zug is one of the cantons where construction labour costs the most: the regional coefficient applied to the base daywork rate is +15%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Zug ranks 1st, on a scale running from −7% to +15%. The employer contributions used are 33% for structural work and 24% for the finishing trades, including cantonal family allowances (1.6%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Zug
ItemValue
Regional coefficient on the daywork rate+15%
Family allowances (CAF) of the canton1.6%
Employer contributions, structural work (CN)33%
Employer contributions, finishing trades24%
Rank among the 26 cantons (coefficient)1 /26
Daywork rates in the canton of Zug, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Zug
Foreman / site supervisor (class V)7'250 CHF122.00140.30
Experienced qualified bricklayer (class Q)6'350 CHF108.00124.20
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00117.30
Skilled worker / federal certificate holder (class B)5'650 CHF96.00110.40
Labourer / site assistant (class C)5'100 CHF88.00101.20
Daywork rates in the canton of Zug, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Zug
Finishing trades foreman (CCT-SOR)6'750 CHF106.00121.90
Experienced qualified tradesperson (class A)6'050 CHF96.00110.40
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00101.20
Skilled worker / federal certificate holder (class B)5'300 CHF85.0097.75
Finishing trades assistant (class C)4'850 CHF79.0090.85

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Zug” column multiplies it by 1.15 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Zug

Pricing work in the canton of Zug calls for sustained attention to the constraints of the location. In areas of high urban density, the limited footprint often requires careful coordination for the erection of scaffolding, the parking of commercial vehicles and the temporary use of public roads, which involves prior procedures with the municipal services. Access to narrow plots often complicates the setting down of skips and the unloading of materials. In addition, the proximity of the lakes exposes façades and exterior works to a high level of humidity and to noticeable wind corridors. These climatic factors directly affect the drying times of concrete, resins or renders, as well as the measures for protecting workstations.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 59.98 per hour, before overheads and margin. The daywork rate of CHF 110.40/h therefore leaves CHF 50.42 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Zug, Baar, Cham and in the canton of Zug

The precise location of your work affects the cost structure, whether it involves deliveries to the heart of Zug or sites in Baar, Cham, Steinhausen, Risch-Rotkreuz or Hünenberg. The constraints vary depending on whether you are working in dense centres with regulated access or in outlying areas with differences in level or narrow secondary roads. Travel times, municipal road-use permits and logistical complexity weigh on the final amount of the quote. To simplify your calculations, our tool applies the general parameters of the canton of Zug, leaving it to the estimator to adjust the installation and transport costs to the exact layout of the municipality where the work is carried out.

Cost difference by town, canton of Zug (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
City of Zug+16%111.35125.30

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Zug

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Zug

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Zug

How should the Swiss VAT rate be shown on a quote in the canton of Zug?

All quotes intended for clients in the canton must show the amounts excluding VAT, the statutory rate in force of 8.1% and the total including VAT. This clear distinction protects the validity of your bid and ensures a smooth transition to final invoicing under the QR-bill standard.

Which language requirements apply to a quote intended for a municipality in Zug?

As the official language of the canton is German, public tenders and quotes intended for institutional or private clients must generally be written in German. Using the German-language version of the CAN standard item catalogue avoids any technical ambiguity when the specifications are approved.

What impact does lakeside wind have on scaffolding items?

Near the lakes, greater exposure to wind calls for careful sizing of the anchors and protective netting, in accordance with the contract and the safety rules in force. This additional equipment and the periodic checks must be priced when the bid is drawn up, to prevent extra operating costs.

How should retention be applied under SIA standard 118?

If the quote refers expressly to SIA standard 118, a retention, in principle adjustable from 0 to 10%, can be agreed to cover defects during the two-year defects notification period. This retention can generally be replaced by an equivalent bank or insurance guarantee.

Price another trade in the canton of Zug

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.