Collective agreements (CLA, CN) and social charges in the canton of Valais
In the canton of Valais, the applicable collective framework depends on the nature of the work carried out. The National Collective Agreement for the main construction industry governs structural work throughout the territory. For the finishing trades, the collective labour agreement for the finishing trades of French-speaking Switzerland covers many trades such as joinery, plastering, painting, tiling or floor coverings. The technical trades, in particular sanitary installations, heating, ventilation and electrical work, come under specific sector agreements. Because Valais is a border canton, joint inspections of compliance with working conditions and wages are frequent on site, whether the staff are local, cross-border or posted. You should check the provisions specific to your trade with the competent joint committee before drawing up your financial proposals.
In the Studio, the regional coefficient applied to the base daywork rate is −5%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Valais ranks 24th, on a scale running from −7% to +15%. The employer contributions used are 34.9% for structural work and 25.9% for the finishing trades, including cantonal family allowances (3.55%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | −5% |
| Family allowances (CAF) of the canton | 3.55% |
| Employer contributions, structural work (CN) | 34.9% |
| Employer contributions, finishing trades | 25.9% |
| Rank among the 26 cantons (coefficient) | 24 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Valais |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 115.90 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 102.60 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 96.90 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 91.20 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 83.60 |
| Profile | Average gross monthly pay | Reference base (VD) | Valais |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 100.70 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 91.20 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 83.60 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 80.75 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 75.05 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Valais” column multiplies it by 0.95 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Valais
Organising a site in Valais is best done with careful attention to the Alpine terrain and the constraints of altitude. Snow and harsh winters often shorten the season suitable for outdoor work, leading to tight schedules and frost-protection measures. Access to the mountain resorts or the side valleys involves narrow roads, steep gradients and sometimes traffic restrictions that complicate the delivery of materials by lorry. Managing storage and turning areas becomes complex on sloping plots. In addition, the rotation of teams and the travel times from the valley floor must be anticipated in the phase schedules. These logistical constraints affect the daily pace and may call for handling equipment suited to sites at altitude.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 25.9% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.83 per hour, before overheads and margin. The daywork rate of CHF 91.20/h therefore leaves CHF 30.37 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Sion, Martigny, Sierre and in the canton of Valais
For your construction quotes in Sion or elsewhere in the canton, the precise location of the work determines your transport and set-up costs. The constraints are not the same on the valley floor, in the industrial conurbations and in the Alpine resorts. Whether your work is in Martigny, Sierre, Monthey, Brig-Glis, Visp, or at altitude towards Crans-Montana, Verbier and Zermatt, journey times, any transhipments and access difficulties directly change the site installation budget. Our costing tool is set to the canton’s parameters to help you adjust your bids to the municipality where the work is carried out, the difference in height and the actual logistical constraints required by site management.
- Sion
- Martigny
- Sierre
- Monthey
- Brig-Glis
- Visp
- Crans-Montana
- Verbier
- Zermatt
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Sion/Sierre/Martigny | −5% | 91.20 | 102.60 |
| Crans-Montana | +12% | 107.50 | 120.95 |
| Verbier | +18% | 113.30 | 127.45 |
| Zermatt | +25% | 120.00 | 135.00 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Valais
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Valais
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Valais
How should winter restrictions be included for a site in Valais?
In areas at altitude, the winter closure period or a forced stoppage due to frost must be anticipated as soon as the bid is drafted. State in the special conditions of the quote the temperature limits for working with certain materials, such as concrete or renders. Also indicate whether winter protection measures, sheeting or temporary heating remain the responsibility of the client.
What precautions should be taken for work in a car-free resort?
When the site is in a locality closed to ordinary road traffic, unloading requires transhipment onto electric vehicles or transport by rail. These breaks in the load make handling heavier and lengthen lead times. These special logistics services should be priced under a separate item in the quote, in agreement with site management.
How can the cost of transporting materials into a side valley be justified?
Bringing skips or bulky elements along mountain roads often requires shorter rigid lorries or split deliveries. To ensure transparency towards the client, itemise the transport and crane costs in the preliminary items or apply a specific surcharge for difficult access, rather than diluting these costs in your unit prices.
Which documents should be prepared in case of a joint inspection on site?
The joint committees regularly check compliance with the applicable collective agreements. The contractor must be able to present the certificates of affiliation, the time sheets and the employment contracts of its workers, including for cross-border workers or subcontractors. Compliance with the rules of the sector avoids financial penalties or site stoppages ordered by site management.
Price another trade in the canton of Valais
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)