3D rendering of a contemporary detached house and its garden – construction quote template for the canton of Basel-Stadt (BS)

Canton of Basel-Stadt · Daywork +10% · CN and sector agreements

Construction quote in the canton of Basel-Stadt: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Basel-Stadt at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Basel-Stadt, the Studio applies a regional coefficient of +10% to the reference daywork rate, and employer contributions of 33.5% for structural work and 24.5% for the finishing trades, of which 2.1% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Basel-Stadt

In the canton of Basel-Stadt, structural work comes under the National Collective Agreement for the main construction industry in Switzerland (CN), which applies uniformly throughout the country. The CCT-SOR agreement of French-speaking Switzerland, on the other hand, does not concern this canton. For the finishing trades and for building services, you should refer to the collective labour agreements specific to each sector, whether regional or cantonal in scope. You must check the applicable provisions with the competent joint committees, in particular as regards working conditions and the scales in force. In our application, the indicative labour profiles take account of the reference data and the cantonal allowances in order to adapt your calculations consistently.

The canton of Basel-Stadt is one of the cantons where construction labour costs the most: the regional coefficient applied to the base daywork rate is +10%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Basel-Stadt ranks 4th, on a scale running from −7% to +15%. The employer contributions used are 33.5% for structural work and 24.5% for the finishing trades, including cantonal family allowances (2.1%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Basel-Stadt
ItemValue
Regional coefficient on the daywork rate+10%
Family allowances (CAF) of the canton2.1%
Employer contributions, structural work (CN)33.5%
Employer contributions, finishing trades24.5%
Rank among the 26 cantons (coefficient)4 /26
Daywork rates in the canton of Basel-Stadt, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Basel-Stadt
Foreman / site supervisor (class V)7'250 CHF122.00134.20
Experienced qualified bricklayer (class Q)6'350 CHF108.00118.80
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00112.20
Skilled worker / federal certificate holder (class B)5'650 CHF96.00105.60
Labourer / site assistant (class C)5'100 CHF88.0096.80
Daywork rates in the canton of Basel-Stadt, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Basel-Stadt
Finishing trades foreman (CCT-SOR)6'750 CHF106.00116.60
Experienced qualified tradesperson (class A)6'050 CHF96.00105.60
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0096.80
Skilled worker / federal certificate holder (class B)5'300 CHF85.0093.50
Finishing trades assistant (class C)4'850 CHF79.0086.90

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Basel-Stadt” column multiplies it by 1.1 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Basel-Stadt

The territorial make-up of this urban border canton often calls for precise logistics management when you draw up your bids. The high building density often brings heavy constraints for the delivery of materials, access for heavy vehicles, restricted parking and the occupation of public land for scaffolding or storage. It is important to anticipate the administrative procedures relating to the roads with site management and the local authorities. In addition, the direct proximity of the borders means that posted or cross-border workers are frequently present, which results in regular checks by the joint committees and the inspection bodies. Compliance of the declarations and observance of the safety standards of SUVA and of the Construction Work Ordinance (OTConst) must be built in from the preparation of your quote.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.5% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.20 per hour, before overheads and margin. The daywork rate of CHF 105.60/h therefore leaves CHF 45.40 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Basel, Riehen, Bettingen and in the canton of Basel-Stadt

When pricing your work in the canton of Basel-Stadt, whether your project is in Basel, Riehen or Bettingen, the precise location of the site has a decisive influence on your final accounts. Depending on whether you have to work in the heart of the dense urban fabric or in outlying residential areas, the approach constraints, traffic restrictions and unloading options vary considerably. Our tool sets your calculation bases according to the cantonal context, but it is up to you to adjust your forecasts for transport, handling and temporary installations, taking account of the access conditions specific to each municipality where you work.

Cost difference by town, canton of Basel-Stadt (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Basel+10%105.60118.80

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Basel-Stadt

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Basel-Stadt

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Basel-Stadt

How should the specific features of the canton of Basel-Stadt be taken into account for labour?

Sites in Basel are subject to the CN for masonry and civil engineering, while the finishing trades depend on specific professional agreements. Given that this is a border canton, joint inspections of minimum wages and the posting of workers are frequent. Make sure you apply the scales recognised by the local joint committees in order to protect your profitability and avoid disputes while the work is being carried out.

Does SIA standard 118 apply automatically to private tenders?

SIA standard 118 does not apply automatically, unless the contract for work or the invitation to tender refers to it expressly. If the contract does not mention it, the rules of the CO apply in principle, in particular Articles 373 and 374 for the methods of remuneration. It is advisable to state in your quote whether or not your services incorporate the general conditions of SIA 118.

How should parking and access difficulties in urban areas be priced?

The costs linked to the parking of company vehicles, to manual handling over long distances and to permits for the temporary occupation of the carriageway must be assessed in advance. You can group these charges under the site installations item according to the CAN standard item catalogue, or charge them to the hourly installation times if the access conditions complicate the supply of the workstations.

How should unforeseen work requested by site management be invoiced?

Any additional work that changes the initial order must be covered by a written variation before it is carried out. In the absence of a price agreed in advance, the work is generally assessed on a daywork basis according to the value of the work and the actual expenses, under Article 374 of the CO. Take care to have your daywork sheets signed daily, to guarantee payment in full for the services.

Price another trade in the canton of Basel-Stadt

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.