Collective agreements (CLA, CN) and social charges in the canton of Ticino
For your sites in Ticino, the collective-agreement framework depends on the nature of the work. The National Collective Agreement for the main construction industry (CN) governs structural work throughout Swiss territory. By contrast, the CCT-SOR does not apply in Ticino, as its scope is limited to French-speaking Switzerland. For the finishing trades and building services, employment relationships are governed by sector collective labour agreements, frequently cantonal or regional. It is up to you to check the provisions in force with the competent joint committee. In Studio Devis Suisse, the calculations rely on indicative reference profiles, distinguishing structural work from the finishing trades and incorporating the family allowances and the regional coefficient specific to the canton, in order to guide the estimate of your hourly outlay.
In the Studio, the regional coefficient applied to the base daywork rate is −7%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Ticino ranks 26th, on a scale running from −7% to +15%. The employer contributions used are 33.7% for structural work and 24.7% for the finishing trades, including cantonal family allowances (2.35%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | −7% |
| Family allowances (CAF) of the canton | 2.35% |
| Employer contributions, structural work (CN) | 33.7% |
| Employer contributions, finishing trades | 24.7% |
| Rank among the 26 cantons (coefficient) | 26 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Ticino |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 113.45 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 100.45 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 94.85 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 89.30 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 81.85 |
| Profile | Average gross monthly pay | Reference base (VD) | Ticino |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 98.60 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 89.30 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 81.85 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 79.05 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 73.45 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Ticino” column multiplies it by 0.9299999999999999 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Ticino
Pricing work in Ticino often requires taking pronounced geographical and logistical constraints into account. The Alpine relief brings constraints linked to altitude, narrow mountain access routes and a site season that is sometimes shortened by winter weather. In dense urban centres, the footprint of scaffolding, the use of public roads and parking require municipal permits that affect your set-up costs. The immediate proximity of the lakes means taking humidity and wind exposure into account when choosing methods and drying times. Lastly, the border character of the canton goes hand in hand with a large number of staff subject to regular joint-committee inspections on sites, which calls for rigorous administrative management of your teams and your subcontractors.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.7% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.29 per hour, before overheads and margin. The daywork rate of CHF 89.30/h therefore leaves CHF 29.01 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Bellinzona, Lugano, Locarno and in the canton of Ticino
The preparation of a construction quote varies appreciably according to the location of the structure. Whether your work is in Bellinzona, Lugano, Locarno, Mendrisio, Chiasso, Ascona or Biasca, each area presents constraints of delivery, altitude or access that weigh directly on the costs of transport, handling and labour. The approach required on the lake shores differs from the one applicable on the floor of the Alpine valleys or in densely built historic centres. Studio Devis Suisse applies the reference parameters at the level of the canton of Ticino, leaving you free to adjust your services and your site surcharges according to the exact municipality and the real configuration of the structure.
- Bellinzona
- Lugano
- Locarno
- Mendrisio
- Chiasso
- Ascona
- Biasca
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Lugano/Ascona | −2% | 94.10 | 105.85 |
| Bellinzona/Mendrisio | −7% | 89.30 | 100.45 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Ticino
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Ticino
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Ticino
How do I adapt my quote to the specifics of the workforce in the canton of Ticino?
In this border canton, companies regularly use resident, cross-border or posted staff. You should price your work taking into account the cantonal collective labour agreements applicable to your trade and the rules of the joint committees. Studio Devis Suisse includes the cantonal profile for your social charges, but you must make sure, with the local professional committee, that the hourly wage used complies with the scales in force.
How should lakeside climatic conditions be built into a bid?
Near bodies of water, humidity and wind change installation rates, in particular for renders, external paints or concretes. It is prudent to mention in the special conditions of your quote the tolerances linked to weather conditions and to provide, if necessary, for temporary protection or heating measures in line with the recommendations of site management and good practice.
What costs should be allowed for site set-up in a dense urban centre?
Installing a crane, a skip or scaffolding on public land requires permits from the municipality concerned, which often have to be paid for. Under the rules of SIA 118, these costs of installation, signage and administrative fees must be clearly identified in the items of your quote or be covered by a separate item, to prevent them being absorbed by your net margin.
Why distinguish structural work from the finishing trades in daywork calculations?
Structural work falls under the national agreement (CN), whereas the finishing trades depend on separate cantonal or regional agreements, with their own charge structures and sector practices. In Studio Devis Suisse, this distinction makes it possible to apply a coefficient and an outlay calculation suited to each activity, thereby ensuring daywork rates consistent with the reality of your business.
Price another trade in the canton of Ticino
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)