3D rendering of a contemporary detached house and its garden – construction quote template for the canton of Fribourg (FR)

Canton of Fribourg · Daywork −2% · CN and CCT-SOR

Construction quote in the canton of Fribourg: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Fribourg at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Fribourg, the Studio applies a regional coefficient of −2% to the reference daywork rate, and employer contributions of 34% for structural work and 25% for the finishing trades, of which 2.65% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Fribourg

In the canton of Fribourg, the collective framework governs working conditions according to your sector of activity. Companies active in structural work come under the National Collective Agreement for the main construction industry in Switzerland, which harmonises practice across the country. For finishing trades such as joinery, plastering, painting, tiling or floor coverings, the provisions of the CCT-SOR generally apply in the French-speaking part of the canton. The technical sectors, including sanitary installations, heating, ventilation and electrical work, follow their own professional agreements. Before drawing up your labour forecasts, it is worth asking the competent joint committee to confirm the rules in force for your trade.

In the Studio, the regional coefficient applied to the base daywork rate is −2%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Fribourg ranks 21st, on a scale running from −7% to +15%. The employer contributions used are 34% for structural work and 25% for the finishing trades, including cantonal family allowances (2.65%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.

Charges and coefficient for the canton of Fribourg
ItemValue
Regional coefficient on the daywork rate−2%
Family allowances (CAF) of the canton2.65%
Employer contributions, structural work (CN)34%
Employer contributions, finishing trades25%
Rank among the 26 cantons (coefficient)21 /26
Daywork rates in the canton of Fribourg, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Fribourg
Foreman / site supervisor (class V)7'250 CHF122.00119.55
Experienced qualified bricklayer (class Q)6'350 CHF108.00105.85
Qualified bricklayer / recent graduate (class A)6'000 CHF102.0099.95
Skilled worker / federal certificate holder (class B)5'650 CHF96.0094.10
Labourer / site assistant (class C)5'100 CHF88.0086.25
Daywork rates in the canton of Fribourg, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Fribourg
Finishing trades foreman (CCT-SOR)6'750 CHF106.00103.90
Experienced qualified tradesperson (class A)6'050 CHF96.0094.10
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0086.25
Skilled worker / federal certificate holder (class B)5'300 CHF85.0083.30
Finishing trades assistant (class C)4'850 CHF79.0077.40

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Fribourg” column multiplies it by 0.98 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Fribourg

Pricing work in this bilingual canton means allowing for varied geographical constraints. Between the pre-Alpine foothills and the lake shores, scheduling varies greatly. At altitude, the period suitable for outdoor work remains shortened by snow and frost, which often means planning ahead for the protection of the works, the clearing of access routes and the transport of materials on winding roads. Close to the lakes, greater exposure to wind and ambient humidity directly affect the drying of concrete, renders or façade paints. It is important to allow for these factors from the initial quote, in consultation with site management, in order to adapt lifting equipment and rates of installation without compromising the financial balance of the project.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 25% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.43 per hour, before overheads and margin. The daywork rate of CHF 94.10/h therefore leaves CHF 33.67 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Fribourg, Bulle, Murten and in the canton of Fribourg

The precise location of your work has a direct effect on logistics costs and on the general organisation of your teams. Whether your contract is in Fribourg, Bulle, Murten, Villars-sur-Glâne, Düdingen, Estavayer-le-Lac or Romont, each municipality has its own features in terms of access, altitude and parking for vans or skips. A project carried out in the dense built-up fabric of the cantonal capital does not generate the same approach costs as a site in a rural area or by the water. Studio Devis Suisse automatically calibrates the basic parameters at the level of the canton, then lets you fine-tune your transport and installation items to the real situation of the plot.

Cost difference by town, canton of Fribourg (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
City of Fribourg0%96.00108.00
Bulle0%96.00108.00
Murten0%96.00108.00

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Fribourg

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Fribourg

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Fribourg

How should bilingualism be taken into account in a quote drawn up in the canton of Fribourg?

Depending on the municipality where the work is located or the origin of the client, the award documents may be supplied in French or in German. It is advisable to draw up your quote in the contractual language of site management, to prevent any misunderstanding about the description of the services. Take care to use the standard designations of the CAN standard item catalogue to ensure that your work items are technically understood without fault, whatever the language used.

What precautions should be taken for a site exposed to lakeside humidity?

Work carried out at the edge of a lake is subject to persistent humidity and regular winds. In your bid, allow for suitable drying times for screeds and exterior renders, as well as reinforced fixings for the scaffolding. Specifying these preparatory measures lets you warn the client of technical lead times that cannot be shortened and justify the specific means of protection provided for in the contract.

How should difficult access to a sloping plot or a plot at altitude be priced?

When the lie of the land prevents materials from being delivered directly by standard lorry, a specific item for transhipment or manual handling must be included. Describe the access constraints precisely in the quote, from the unloading area to the foot of the structure. Applying the rules of SIA standard 118 makes it easier for these logistics services to be recognised as necessary work, distinct from mere supply.

Which VAT rate should be applied to a construction invoice in Fribourg?

All quotes and final accounts for work carried out in Switzerland must include VAT at the statutory rate of 8.1%. This amount must appear separately from the subtotal excluding VAT on your document. To ensure compliance when invoicing the client, your proposal must also state your valid UID number and prepare for the issue of a QR-bill in accordance with the Swiss guidelines in force.

Price another trade in the canton of Fribourg

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.