3D rendering of a contemporary detached house and its garden – construction quote template for the canton of Lucerne (LU)

Canton of Lucerne · Daywork +4% · CN and sector agreements

Construction quote in the canton of Lucerne: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Lucerne at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Lucerne, the Studio applies a regional coefficient of +4% to the reference daywork rate, and employer contributions of 33.2% for structural work and 24.2% for the finishing trades, of which 1.8% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Lucerne

In the canton of Lucerne, structural work falls under the National Collective Agreement for the main construction industry in Switzerland (CN). For the finishing trades and building services, the CCT-SOR does not apply, as it is reserved for French-speaking Switzerland. Companies active in these trades are well advised to refer to the sector collective labour agreements, which are frequently negotiated at cantonal or regional level, or declared generally applicable. You should check the applicable wage provisions and working conditions with the competent joint committee before drawing up your tenders. Our tool includes indicative profiles for structural work and the finishing trades, weighted by the cantonal parameters, leaving each contractor to adjust the basis of calculation to their actual framework.

In the Studio, the regional coefficient applied to the base daywork rate is +4%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Lucerne ranks 7th, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.8%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Lucerne
ItemValue
Regional coefficient on the daywork rate+4%
Family allowances (CAF) of the canton1.8%
Employer contributions, structural work (CN)33.2%
Employer contributions, finishing trades24.2%
Rank among the 26 cantons (coefficient)7 /26
Daywork rates in the canton of Lucerne, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Lucerne
Foreman / site supervisor (class V)7'250 CHF122.00126.90
Experienced qualified bricklayer (class Q)6'350 CHF108.00112.30
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00106.10
Skilled worker / federal certificate holder (class B)5'650 CHF96.0099.85
Labourer / site assistant (class C)5'100 CHF88.0091.50
Daywork rates in the canton of Lucerne, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Lucerne
Finishing trades foreman (CCT-SOR)6'750 CHF106.00110.25
Experienced qualified tradesperson (class A)6'050 CHF96.0099.85
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0091.50
Skilled worker / federal certificate holder (class B)5'300 CHF85.0088.40
Finishing trades assistant (class C)4'850 CHF79.0082.15

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Lucerne” column multiplies it by 1.04 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Lucerne

Pricing work in the canton of Lucerne is best done by taking into account geographical constraints that are often sharply contrasted. The higher areas and the edges of the Pre-Alpine relief subject sites to pronounced winters, with snowfall that shortens the period suitable for outdoor work. Lorry access on winding or steep roads may require suitable vehicles and longer turnaround times. By contrast, the lakeside areas expose structures to permanent humidity and gusts of wind. The drying times of screeds, renders or paints are lengthened as a result, sometimes requiring temporary drying equipment. In addition, the bearing capacity of the ground along the lake and the management of water during earthworks call for sustained attention.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 99.85/h therefore leaves CHF 39.78 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Lucerne, Emmen, Kriens and in the canton of Lucerne

The precise location of your work directly affects logistics costs and the organisation of your teams. Whether these are dense projects in the heart of Lucerne, industrial or commercial sites in Emmen and Sursee, or residential developments in Kriens, Horw and Ebikon, conditions differ appreciably. Parking difficulties in urban areas, altitude on the foothills or direct exposure on the lake shore change work rates and transport costs. Our tool applies the overall parameters specific to the canton, while leaving you the flexibility needed to adapt your quotes to the access and siting characteristics of the municipality concerned.

Cost difference by town, canton of Lucerne (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
City of Lucerne+6%101.75114.50

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Lucerne

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Lucerne

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Lucerne

How do I adapt my quote to the disparities within the canton of Lucerne?

You need to adjust your site set-up items according to altitude and proximity to water. For a project in a mountain area, increase transport times, allow for frost protection and take a shorter season into account. On the lake shore, price the measures linked to humidity, such as reinforced sheeting or dehumidifiers, in consultation with site management.

Which agreement should I use for a finishing-trades worker in this area?

As the CCT-SOR does not apply in German-speaking Switzerland, you must comply with the sector agreement in force for your trade in the region. Minimum wages, travel allowances and social charges vary according to the agreements of the profession. Enquire with the employers’ secretariat or the joint committee before confirming your hourly rate.

How should retention be handled under SIA standard 118?

Under the rules of SIA standard 118, a retention, generally adjustable up to a maximum of ten per cent, may be agreed to cover any defects. The contractor may replace it with a bank or insurance guarantee. This sum remains blocked during the two-year period for notifying defects, before being released if no faulty workmanship is found.

What should be checked for daywork?

Daywork is deemed accepted only if it has been agreed in advance with the client or their representative. The daywork sheets should be countersigned regularly by site management. State in your initial quote whether the rates given are exclusive or inclusive of VAT, in order to avoid any dispute at final invoicing.

Price another trade in the canton of Lucerne

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.