Collective agreements (CLA, CN) and social charges in the canton of Solothurn
In the canton of Solothurn, the National Collective Agreement for the main construction industry governs structural work. The CCT-SOR does not in principle concern this canton, since its scope is centred on French-speaking Switzerland. For all the finishing trades, building services and finishes, you must refer to the collective labour agreements specific to each sector, which may be cantonal or regional in nature. You should ask the competent joint committee to confirm the wage conditions, the travel allowances and the professional practice in force. The tool applies indicative profiles adapted to these realities, combining the benchmarks for structural work and the finishing trades with the social parameters and the cantonal level of family allowances.
In the Studio, the regional coefficient applied to the base daywork rate is +1%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Solothurn ranks 13th, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.85%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | +1% |
| Family allowances (CAF) of the canton | 1.85% |
| Employer contributions, structural work (CN) | 33.2% |
| Employer contributions, finishing trades | 24.2% |
| Rank among the 26 cantons (coefficient) | 13 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Solothurn |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 123.20 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 109.10 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 103.00 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 96.95 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 88.90 |
| Profile | Average gross monthly pay | Reference base (VD) | Solothurn |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 107.05 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 96.95 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 88.90 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 85.85 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 79.80 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Solothurn” column multiplies it by 1.01 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Solothurn
Running a site in this canton involves no extreme geographical constraint, but requires a precise assessment of the logistics of each site. Work in urban areas or along busy transit routes is best given careful planning of deliveries, of the occupation of public land and of the rotation of sorting skips. Depending on the location, the narrowness of building courtyards or the immediate neighbourhood often calls for coordination with site management to set the hours for noisy work and the protection measures under the safety rules in force. Exterior work remains dependent on seasonal variations in the weather, which means allowing for possible waiting times when preparing schedules and calculating temporary installations.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 96.95/h therefore leaves CHF 36.88 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Solothurn, Olten, Grenchen and in the canton of Solothurn
When drawing up your bids in the canton of Solothurn, the exact geographical location of the plot directly affects your transport costs and your rates of installation. Whether you are working in the heart of the Solothurn conurbation, at the logistics hubs of Olten, in the trade and craft zones of Grenchen, in the built-up fabric of Zuchwil or in the immediate vicinity of the Basel border at Dornach, the access conditions, the parking areas for vans and the handling of materials differ greatly. Studio Devis Suisse calibrates its general parameters at cantonal level, leaving you to adjust your labour times and your logistics costs to the municipality concerned.
- Solothurn
- Olten
- Grenchen
- Zuchwil
- Dornach
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Solothurn | +2% | 97.90 | 110.15 |
| Olten | +2% | 97.90 | 110.15 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Solothurn
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Solothurn
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Solothurn
How should a quote be adapted for a client in the canton of Solothurn?
The predominant working language on site and for correspondence with site management is German. If you write your quote in a language other than German, make sure you use the exact designations of the standard item catalogue to avoid any dispute at the invoicing stage. State whether your amounts are shown excluding VAT or with VAT of 8.1%, and refer explicitly to SIA standard 118 as the contractual framework for execution.
Which sector agreement applies to joinery or plastering work?
As the CCT-SOR does not extend to this canton, you cannot use the scales of French-speaking Switzerland. You must check the sector agreements that apply locally with the employers’ association office or the competent joint committee. These agreements define the rules on meal allowances, travel time and social charges that you must pass on faithfully in your time sheets or your hourly daywork rates.
Should specific costs be provided for site access?
Yes, because depending on the municipality, erecting scaffolding, setting down a spoil skip or parking commercial vehicles on public land may be subject to paid permit applications. These administrative procedures and the associated fees must appear clearly under the site installations item so that they are not absorbed by your overheads.
How should retention be worded under SIA standard 118?
The contract for work may provide for a retention on each monthly payment application. You can agree to replace this retention with an equivalent bank or insurance guarantee when the works are accepted. State unambiguously how this security is to be released on expiry of the two-year defects notification period.
Price another trade in the canton of Solothurn
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)