3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Obwalden (OW)

Canton of Obwalden · Daywork +1% · CN and sector agreements

Construction quote in the canton of Obwalden: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Obwalden at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Obwalden, the Studio applies a regional coefficient of +1% to the reference daywork rate, and employer contributions of 33.1% for structural work and 24.1% for the finishing trades, of which 1.75% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Obwalden

For sites carried out in the canton of Obwalden, structural work is governed at Swiss level by the National Collective Agreement for the main construction industry (CN). By contrast, the CCT-SOR does not apply in this territory, as that agreement is restricted to French-speaking Switzerland. The finishing trades, building services and the decorating trades are governed by sector collective labour agreements, negotiated at cantonal level or at the regional level of German-speaking Switzerland. You should therefore check the working conditions and wage provisions with the joint committee competent for your trade. Our tool applies indicative profiles for structural work and the finishing trades, taking into account the regional adjustments and the family allowances of the canton to support your cost-price calculations.

In the Studio, the regional coefficient applied to the base daywork rate is +1%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Obwalden ranks 13th, on a scale running from −7% to +15%. The employer contributions used are 33.1% for structural work and 24.1% for the finishing trades, including cantonal family allowances (1.75%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Obwalden
ItemValue
Regional coefficient on the daywork rate+1%
Family allowances (CAF) of the canton1.75%
Employer contributions, structural work (CN)33.1%
Employer contributions, finishing trades24.1%
Rank among the 26 cantons (coefficient)13 /26
Daywork rates in the canton of Obwalden, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Obwalden
Foreman / site supervisor (class V)7'250 CHF122.00123.20
Experienced qualified bricklayer (class Q)6'350 CHF108.00109.10
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00103.00
Skilled worker / federal certificate holder (class B)5'650 CHF96.0096.95
Labourer / site assistant (class C)5'100 CHF88.0088.90
Daywork rates in the canton of Obwalden, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Obwalden
Finishing trades foreman (CCT-SOR)6'750 CHF106.00107.05
Experienced qualified tradesperson (class A)6'050 CHF96.0096.95
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0088.90
Skilled worker / federal certificate holder (class B)5'300 CHF85.0085.85
Finishing trades assistant (class C)4'850 CHF79.0079.80

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Obwalden” column multiplies it by 1.01 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Obwalden

Pricing work in Obwalden is generally best done by taking into account the climatic and topographical constraints specific to the Pre-Alps and the high valleys. The season suitable for outdoor work often turns out to be shortened by the harshness of winter, early snow cover and the snow clearance required on site access routes. Links to the Alpine areas require suitable logistics for transporting skips, delivering heavy materials and stabilising plant on steep gradients. In addition, the areas bordering the lakes are subject to persistent humidity levels, potential rises in groundwater during earthworks and strong wind corridors. These factors directly influence the setting times of mortars, the protection of scaffolding in accordance with the Construction Work Ordinance (OTConst) and the actual work rate of the teams on the ground.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.1% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.02 per hour, before overheads and margin. The daywork rate of CHF 96.95/h therefore leaves CHF 36.93 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Sarnen, Kerns, Alpnach and in the canton of Obwalden

To draw up a construction quote in Sarnen or in the rest of the canton, the exact geographical location influences your set-up costs. Working conditions differ notably depending on whether the structure is located in the lowland or valley-floor areas such as Alpnach and Sachseln, on the heights of Kerns, or in the Alpine resort of Engelberg. Altitude, the layout of the mountain roads and access restrictions for lorries change travelling times and handling. The Studio Devis Suisse tool calibrates its general parameters on the canton of Obwalden, while leaving you free to adjust your site set-up costs according to the municipality where you are working.

Cost difference by town, canton of Obwalden (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Sarnen+1%96.95109.10
Engelberg+10%105.60118.80

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Obwalden

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Obwalden

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Obwalden

How do I adapt my quote to the climatic specifics of the canton of Obwalden?

You need to include the Alpine weather constraints in your site set-up items. Make explicit provision for frost-protection equipment, the protection of the works against humidity near watercourses or lakes, and snow clearance. It is prudent to specify in the contract, with reference to SIA standard 118, the conditions for temporarily interrupting the work during severe bad weather.

Does the CCT-SOR have any validity for a subcontractor in Sarnen?

No, the CCT-SOR has no legal effect in the canton of Obwalden. If you commission teams or work in the finishing trades, you must comply with the sector collective labour agreements applicable in Central Switzerland. Contact the local or professional joint committee to check the scales and the specific social charges to include in your daywork calculations.

What logistics costs should be anticipated for work towards Engelberg?

Bringing supplies to mountain areas involves longer transport times, lorry runs that are sometimes limited by the authorised weight and more pronounced mechanical wear. Your bid must include fair travel allowances for staff and a specific item for unloading, secure storage and any parking permits on public land.

How should VAT and the financial terms be stated on the quote?

Your proposal must clearly show Swiss VAT at the statutory rate of 8.1% on the total excluding VAT. State the validity of the bid, the due dates of the interim payments according to the progress of the site phases and the possible inclusion of a retention adjustable from 0 to 10%. For final invoicing, make sure you can generate a QR-bill that complies with Swiss standards.

Price another trade in the canton of Obwalden

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.